Click For Crochet Abbreviations List
Size: 46/48.
To make a dress you need: 950 g of Vita "MERINO" yarn (100% merino wool extrafine, 144 m / 50 g) gray; Knitting needles number 4, auxiliary needle.
On the needles: the front surface (faces. P. - faces. P., Izn. R. –niz. P.), Gum 2/2 (alternately 2 faces., 2 ws p.): Pattern "braid": knit according to the scheme .
Knitting density: 27 p. X 35 p. = 10 x 10 cm, connected on the needles No. 4 persons. satin stitch.
The sequence of work.
Back: on the spokes number 4 dial 210 n. And knit as follows: 1 chrome. P., 10 p. persons. stitch, * 20 p. pattern "braid", 22 p. persons. stitch *, repeat from * to * 3 times, 20 p. pattern "spit", 10 p. persons. stitch, 1 chrome. p. To design the line of the sides in the 23rd p. from the start of knitting close in the front tracks 5 p., then in each 24-m p. 2 times in 5 p., In each 20-m p. 2 times by 5 points, in each 18th r. 2 times 5 p., In each 16th p. 2 times 5 p., In each 14th p. 2 times by 5 points, in each 12th r. 3 times in 5 p. In the 187th p. from the beginning of knitting close in the pattern "braid" 1 time in 5 p., then in each 8th p. 2 times 5 p. On the needles = 125 p. Next, knit 28p. individuals. satin stitch. For clearance line armhole in the 283rd p. from the beginning of knitting close on both sides of 4 p., then in each 2nd p. 1 time for 3 p., 1 time for 2 p., 3 times for 1 p. On the needles = 101 p. In the 355th p.
Before: knit like a back. Through 294 p. from the beginning of knitting, add 1 p. On the needles = 102 p. Work divided into 2 equal parts. Next, knit the right and left shelves separately.
Right shelf: for the decoration of the neckline in the 333-m p. from the beginning of knitting close on the left side of 10 p., then in every 2nd p. 2 times 3 points, 1 time 2 points, 3 times 1 point. On the needles = 30 point. In the 355th river. from the start of knitting all the loops close in the same row.
Left ass: knit, symmetrically right ass.
Right sleeve: on the needles number 4 dial 62 p. And knit 39 p. rubber band 2/2. In the 40th p. Add 1 p. On the spokes - 63 p. Next, divide the work into 9 parts by 7 p. (each lane). In the 1st p. from the elastic in each lane, evenly increase by 14 p. (knit 3 faces from each loop. p.). On the needles = 21 p (each strip). Next, knit right 14 p. every lane. In the 15th p. from the gum to perform crossings as follows: * Leave the 1st lane on the side. Needle before work, knit the 2nd lane, the 1st lane with auxiliary knitting needles, knit the 3rd lane *, repeat from * to * 2 times. Next, knit right 12 p. individuals. sting every lane. In the 27th p. from the elastic to perform crossings as follows: * 1st lane, 2nd to leave at work, knit the 3rd lane, knit the 2nd lane with a second Knitting needles *, repeat from * to * 2 times. Next, repeat the crosses 1 time in each 11th p., Then in each 12th p. 4 times. To narrow the bands in the 31st p. from the gum close on both sides in each lane by 1 p., then in each 11th p. 1 time for 1 p., In each 12th p. 3 times 1 p. On the needles = 11 p. (Each lane). To connect braids between each other, cross the threads on the seamy side 1 time in the 18th p. from the gum, then 1 time in the 14th p., 2 times in each 12th p. In the 92nd p. from the gum all the loops move to 1 spoke. On the needles = 99 p. In the 93rd p. from the gum evenly close 6 p. on the needles = 85 p. Next, knit straight 48 p. individuals. satin stitch. For the decoration of the line of okata sleeves in the 141st p. from the gum close on both sides by 5 p., then in each 2nd p. 1 time for 3 p., 3 times for 2 p., 18 times for 1 p., 2 times for 3 p. On the needles = 9 p. In the 191st p. from the gum all the loops close in the same row. To narrow the bands in the 31st p. from the gum close on both sides in each lane by 1 p., then in each 11th p. 1 time for 1 p., In each 12th p. 3 times 1 p. On the needles = 11 p. (Each lane). To connect braids between each other, cross the threads on the seamy side 1 time in the 18th p. from the gum, then 1 time in the 14th p., 2 times in each 12th p. In the 92nd p. from the gum all the loops move to 1 spoke. On the needles = 99 p. In the 93rd p. from the gum evenly close 6 p. on the needles = 85 p. Next, knit straight 48 p. individuals. satin stitch. For the decoration of the line of okata sleeves in the 141st p. from the gum close on both sides by 5 p., then in each 2nd p. 1 time for 3 p., 3 times for 2 p., 18 times for 1 p., 2 times for 3 p. On the needles = 9 p. In the 191st p. from the gum all the loops close in the same row. To narrow the bands in the 31st p. from the gum close on both sides in each lane by 1 p., then in each 11th p. 1 time for 1 p., In each 12th p. 3 times 1 p. On the needles = 11 p. (Each lane). To connect braids between each other, cross the threads on the seamy side 1 time in the 18th p. from the gum, then 1 time in the 14th p., 2 times in each 12th p. In the 92nd p. from the gum all the loops move to 1 spoke. On the needles = 99 p. In the 93rd p. from the gum evenly close 6 p. on the needles = 85 p. Next, knit straight 48 p. individuals. satin stitch. For the decoration of the line of okata sleeves in the 141st p. from the gum close on both sides by 5 p., then in each 2nd p. 1 time for 3 p., 3 times for 2 p., 18 times for 1 p., 2 times for 3 p. On the needles = 9 p. In the 191st p. from the gum all the loops close in the same row. 1 time for 1 p., In each 12th p. 3 times 1 p. On the needles = 11 p. (Each lane). To connect braids between each other, cross the threads on the seamy side 1 time in the 18th p. from the gum, then 1 time in the 14th p., 2 times in each 12th p. In the 92nd p. from the gum all the loops move to 1 spoke. On the needles = 99 p. In the 93rd p. from the gum evenly close 6 p. on the needles = 85 p. Next, knit straight 48 p. individuals. satin stitch. For the decoration of the line of okata sleeves in the 141st p. from the gum close on both sides by 5 p., then in each 2nd p. 1 time for 3 p., 3 times for 2 p., 18 times for 1 p., 2 times for 3 p. On the needles = 9 p. In the 191st p. from the gum all the loops close in the same row. 1 time for 1 p., In each 12th p. 3 times 1 p. On the needles = 11 p. (Each lane). To connect braids between each other, cross the threads on the seamy side 1 time in the 18th p. from the gum, then 1 time in the 14th p., 2 times in each 12th p. In the 92nd p. from the gum all the loops move to 1 spoke. On the needles = 99 p. In the 93rd p. from the gum evenly close 6 p. on the needles = 85 p. Next, knit straight 48 p. individuals. satin stitch. For the decoration of the line of okata sleeves in the 141st p. from the gum close on both sides by 5 p., then in each 2nd p. 1 time for 3 p., 3 times for 2 p., 18 times for 1 p., 2 times for 3 p. On the needles = 9 p. In the 191st p. from the gum all the loops close in the same row. 2 times in every 12th p. In the 92nd p. from the gum all the loops move to 1 spoke. On the needles = 99 p. In the 93rd p. from the gum evenly close 6 p. on the needles = 85 p. Next, knit straight 48 p. individuals. satin stitch. For the decoration of the line of okata sleeves in the 141st p. from the gum close on both sides by 5 p., then in each 2nd p. 1 time for 3 p., 3 times for 2 p., 18 times for 1 p., 2 times for 3 p. On the needles = 9 p. In the 191st p. from the gum all the loops close in the same row. 2 times in every 12th p. In the 92nd p. from the gum all the loops move to 1 spoke. On the needles = 99 p. In the 93rd p. from the gum evenly close 6 p. on the needles = 85 p. Next, knit straight 48 p. individuals. satin stitch. For the decoration of the line of okata sleeves in the 141st p. from the gum close on both sides by 5 p., then in each 2nd p. 1 time for 3 p., 3 times for 2 p., 18 times for 1 p., 2 times for 3 p. On the needles = 9 p. In the 191st p. from the gum all the loops close in the same row.
Left sleeve: knit symmetrically to the right sleeve.
Assembling and finishing
Run shoulder and side seams, the seams on the sleeves. Sleeves sew in the armhole.
Collar: on the throat of the needles number 4 dial 103 p. And knit 42 p. individuals. Satin 43rd p. all loops close in the same row. Ready collar to fold back. side and hem.