Click For Crochet Abbreviations List
Size: 38
You will need: yarn: 400g for a dress and 200g each for blowjobs and purses of gray Mondial Party yarn (43% wool, 40% polyamide, 15% acrylic, 2% metall.polyester, 140m / 50g); Spokes and hook: needles No. 4, 5 and No. 5, hook No. 4; Also: a 34x25x6 cm stitching bag.
Double elastic: with a contrast thread, type half of the required loops; 1st reg.: Working thread knit * 1 persons., 1 nakid *. repeat from * to the 2nd reg.: * knit nakid faces., remove 1 p. as out. without knitting, thread before work *, repeat from * to *; 3rd and last, r.: * 1 persons., Remove 1 p. As w., Thread before work *, repeat from * to *; in the finished part to dissolve the contrasting thread.
Facial smoothness: persons. R. - persons. n., izn. R. - ex. p.
Gum 1/1: alternately 1 persons., 1 izn.
Gum 2/2: 2 persons alternately., 2 out.
Gum 6/2: alternately 3 persons., 2 external., Zlits.
Spit to the right (width 2 p.): 1st p.: 2 p. Cross over to the right (knit the 2nd p. Face., Holding the right knitting needle before the first p., And without removing the knit loop, knit the 1st p. persons., remove both loops); 2nd p .: all izn .; 3rd p .: repeat rapport from 1st p.
Spit to the left (width 2 p.): 1st p.: 2 p. Cross over to the left (to knit the 2nd p. Of persons., Holding the right knitting needle behind the first p., And without removing the knit loop, to fasten the 1st p. persons., remove both loops); 2nd p .: all izn .; 3rd p .: repeat rapport from 1st p.
The pattern of fans (the number of loops is a multiple of 17): 1st river: all persons .; 2nd and all even R.: all izn .; 3rd river: * W x 2 p. Together persons., 5 x (1 nakid, 1 person.), 1 nakid. З х 2 items together persons. *, Repeat from * to *; 5th b.: All persons .; 7th reg .: repeat rapport from 1st p.
The main pattern (width 59 p.): 1st, 5th and 7th p.: 23 persons., 2 p. Together persons .. 1 nakid. 9 p. Elastic band 1/1 (starting from 1 out.), 1 nakid, 2 p. Together with a broach (remove 1 p. As persons .. 1 persons. And stretch it through the removed p.), 23 persons .; 2nd and all even R.: knit by pattern; 3rd p .: 1 person .. 4 x 2 p. Together persons., * 1 nakid, 1 person. *, Repeat from * to * 7 times, 1 nakid, 3 x 2 n. Together persons., 3 n . together persons., 1 nakid, 9 p. elastic 1 / 1.1 nakid 3 p. together persons., 3 x 2 n. together persons., repeat from * to * 7 times, 1 nakid. 4 x 2 p. Together persons., 1 persons .; 9th reg .: repeat rapport from 1st p.
Knitting density Gum 6/2, needles number 5: 18 n. And 24 p. = 10 x 10 cm; gum 2/2, needles number 5:18 p. and 23 p. = 10 x 10 cm: the main pattern, the needles N5 5: 16 p. And 21 p. = 10 x 10 cm.
Dress
Back:
On the needles number 4.5 dial 90 p. And tie 4 p. double rubber band, then knit rubber band 2/2. After 8 cm from the typesetting edge, go to the needles No. 5 and knit with an elastic band 6/2, knitting on each side 1 chrome. and gradually diminishing in the 1st p. 1 x 8 n. After 60 cm from the elastic 2/2 for bevels, close the armholes on both sides with 1 x 2 nos and further knit the 3 pts extreme on both sides with a double elastic band, decreasing after the first 3 and before the last 3 n. 2nd p. 6 x 1 n. After 17 cm from the beginning of the bevels, armholes for the neckline close the middle 20 points and finish both parts separately, closing on both sides of the center in each 2nd p. 1 x 5 p. And 1 x 2 p. After 2.5 cm from the beginning of the neck, close the 16 p. Remaining for each shoulder.
Before:
On the needles number 4.5 dial 90 p. And tie 4 p. double rubber band, then knit rubber band 2/2. After 8 cm from the edge of the dial go to the spokes number 5 and, evenly diminishing in the 1st p. 1 x 10 p., Knit trace. in the following way: 21 p. with an elastic band 6/2 (ending with 2 out), 2 p. oblique to the right, 34 p. fan pattern, 2 p. oblique to the left, 21 p. with an elastic band 6/2 (starting with 2 res.). After 60 cm from the gum 2/2 to perform bevels armholes, as for the backrest. After 72 cm from the elastic 2/2 for the neckline close the middle 14 points and finish both parts separately, closing on both sides of the center in each 2nd p. 1 x 4 p., 1 x 3 p. And 1 x 2 p. After 7.5 cm from the beginning of the neck, close the 16 p.
Remaining for each shoulder. Assembly:
Run shoulder and side seams. Hook to tie the neck back and before 1 p. Art. b / n and 1 p. step by step (art. b / n from left to right).
Mittsi
Job Description: on needles number 5 dial 42 p. And tie 4 p. double rubber band, then knit with a rubber band 2/2, adding on both sides in each 20th p. 4 x 1 p. Tie another 8 p through 58 cm from the double gum. (1 cm) double elastic and close all the loops knitted stitch. Also tie the second mitten. Run the side seams, leaving at a height of 4.5 cm from the bottom edge open 3 cm for the thumb.
Handbag
Front / Back:
on needles No. 5 dial 59 points and knit with the main pattern, 24 cm from the typesetting edge for the upper strap to knit people. stitch, evenly reducing in the 1st p. 1 x 25 p .; after 5 cm close all loops.
Bottom and sides:
on the needles number 5 dial 8 p. and for the upper strap to tie 5 cm of persons. stitch, then knit gum 1/1, evenly adding to the 1st p. 1 x 3 p. 80 cm from the plank, tie another 5 cm of faces. stitch, evenly reducing in the 1st p. 1 x 3 n. And close all loops.
Assembly:
Sew the bottom and sidewalls to the front and back of the bag, equating the edges of the parts. Tuck the upper bar inward and hem a secret stitch. Fit the finished bag with a knitted handbag.