Maria

White Turtleneck Sweater Free Pattern

Click For Crochet Abbreviations List

Soft Sweater from mohair yarn with pattern leaves

Size: 38/40 (48/50 in)
You will need: 400 (500) G white yarn Mohapa (67% Polyacryl, 33% Moker, 125 m/50 g); Straight Spokes № 4 and № 5.5; Circular Spokes № 4.

Elastic band, Spokes № 4: Alternately 2 persons., 2 H.

Vertical pattern with holes, spokes N9 4: Number of Loops multiple 10 + 2 chrome. Knit by scheme 1, which is the 1st one. P. and then only persons. R. Unmarked. P. Loops knit on the figure, knitting scum Start with chrome. and loops before raport. Repeating rapport, finishing loops after Raport and chrome. Start the pattern with the designated P., which is not taken into account in the further account, then repeat the 1st and 2nd p. openwork pattern, spokes № 5.5: Number of loops multiple 22 + 2 chrome. Knit by scheme 2: which lists only persons. P., in P. Loops knit on the figure. Repeat between Chrome. Rapport and from the 1st to 32nd p. Density of Knitting: 18 p. and 21.5 p. = 10 x 10 cm.

Backrest: Dial 82 (102) p. and tie for a lath 13 cm vertical pattern with holes, evenly adding in the last p. 8 (10) P. = 90 (112) p. then knit openwork pattern. After 27 cm = 58 m (24 cm = 52 R.) from the plank close to the armholes on both sides 3 p. and in each 2nd P. 2 x 2 and 4 x 1 P. = 68 (90) p. through 48 cm (= 104 p.) from the strap close for shoulder bevel on both sides 6 (8) p. and in Each 2nd P. 3 x 5 (1 x 8 and 2 x 7) p. Simultaneously with the 1st decrease of the shoulder, close the Middle 16 (20) p. and both sides to finish separately. For rounding close from the inner edge in each 2nd p. 1 x 3 and 1 x 2 p. through 51 cm (= 110 R.) of the strap all loops should be used.

Before: Knit the same way. But with a deeper neck. To do this, through 44.5 cm (= 96 p.) from the plank close the average of 12 (16) p., in each 2nd P. 2 x 2 and 2 x 1 p. and the next 4th p. 1 x 1 P.

Sleeves: Dial 48 (52) p. and tie for the strap 11 cm vertical pattern with holes, with a size of 38/40 to start the pattern with chrome. And the PE from the stirrup A, repeat three times raport, finishing loops to the arrow B and Chrome. In addition, uniformly add in the last p. 4 (10) P. = 52 (62) p. Then knit openwork pattern, start with the 21st p., with Chrome. And the last 3 (8) p. raport, repeat 2 times rapport, Finish first 3 (8) p. raport and Chrome. Simultaneously from a lath to add for Skosov sleeves on both parties alternately in each 8-th and 10-th p. 8 x 1 P. (in each 8-th p. 9 х 1 p.) = 68 (80) p... Including the added loops in the pattern. After 35 cm (= 76 R.) from the plank close to the sleeve of the sleeves on both sides of the 3 (4) p. and in each 2nd P. 2 x 2.11 x 1.1 x 2 (3) and 1 x 3 (4) p. 50 cm (= 108 R.) from the plank close the remaining 22 (28) p.

Assembly: Perform shoulder seams. On a cut of a neck to dial on circular spokes 96 (100) p., to tie for a collar 25 sm an elastic band and then all loops to close on drawing. Fit the sleeves, carry out side seams and seams of sleeves.








Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments