FILLERS
From the right edge: chrome., 2 p. Knit together persons. crossed;
from the left edge: 2 p. knit together persons. crossed, chrome.
KNITTING DENSITY
20 p. X 54 p. = 10 x 10 cm, connected by the “Cell” pattern with the # 4 knitting needles.
ATTENTION!
The skirt consists of 6 panels of different sizes, which are interconnected according to the diagram in a certain sequence (see the letters in the diagram).
Pattern
COMPLETING OF THE WORK
THE AREA
Link 2 details.
On the spokes number 4 thread aqua dial 42 (52) 52 (52) p. And knit 1 out. a number of facial.
Work to continue the pattern of "cells".
In the 36th p. From the dial-up row, first subtract 1 p. from both sides, then in each 40 p. 3 times 1 p., In each 30th p. 2 times 1 p., In each 22nd p. 2 times 1 p. And in every 16th p. 2 more times for 1 p. = 22 (32) 32 (32) p.
Through 325 p. = 16 rapports from dial-up series to perform 2 p. garter stringy navy blue.
After 61 cm = 327 p. temporarily from the dial-up loop
CAPTURE IN
Link 2 details.
The needles number 4 thread 1 dial 42 (52) 52 (52) p. And knit 1 out. a number of facial.
Work to continue the pattern of "cells".
In the 34th p. From the dial-up row, first subtract 1 p. from both sides, then in each 34th p. 3 times 1 p., In each 30th p. 2 times 1 p., In each 22nd p. 2 times 1 p. And in every 16th p. 2 more times for 1 p. = 22 (22) 32 (32) p.
Through 305 p. = 15 rapports from a dial-up row to knit 2 p. garter stringy navy blue.
Through 57 cm = 307 p. from the dial-up number of the loop temporarily leave.
CAPTURE WITH
Link 2 details.
The needles number 4 thread 1 dial 42 (42) 42 (52) p. And knit 1 out. a number of facial. Work to continue the pattern of "cells".
In the 36th p. From the dial-up row, first subtract 1 p. from both sides, then in each 30th p. 5 times 1 p., In each 22nd p. 2 times 1 p. And in every 16th p. 2 more times for 1 p. = 22 (22) 22 (32) p.
Through 285 p. = 14 rapports from a dial-up row 1 p. knit garter sticking thread celadon.
After 53 cm = 287 p. from the dial-up number of the loop temporarily leave.
ASSEMBLY
Temporarily left loops of all 6 panels translate into circular needles in the following sequence: 22 (32) 32 (32) p. Of cloth A, 22 (22) 32 (32) p. Of cloth B, 22 (22) 22 (32) p. cloths C, 22 (22) 32 (32) paragraphs of cloth B, 22 (32) 32 (32) paragraphs of cloth A and 22 (22) 22 (32) paragraphs of cloth C.
At all 132 (152) 172 ( 192) p. Knit with a sea-green thread with a rubber band belt, starting with 1 w., While in the 1st p. chrome knit the loops of the neighboring panels together according to the pattern - purl or facial = 127 (147) 167 (187) p. Through 4 cm = 14 p. loop belt close on the picture.
Skirt the skirt sew - see also the diagram of the connection details.
On the open edge of the panel C on the needles No. 3.5 with a sea-green thread, dial 156 p. And for the bar perform 3 p. = 1 cm garter stitch, starting with the inside. row. Then close the loop face.
On the open edge of panel A on the needles No 3.5 with a sea-green thread, dial 174 p. And for the plank perform 3 p. = 1 cm garter stitch, starting with the inside. row. Then close the loop face.
Sew the zipper under the edges of the slats (starting from the top of the belt) so that the cloves are visible and the zipper opens from the bottom.