Click For Crochet Abbreviations List
Business Jacket Size 40/42
You will need:
• 450 g yarn made of wool With acrylic camel-Color to work on the spokes of the gch2z and N24, 5 • 2 Metalic- Buttons • L Metal- The lime buckle is Lot Color Width H cm • Needle for wool.
Patterns (start). Gum
Hollow Gum
1 х1. Persons. Surface. Purl surface.
Density of knitting
Persons. Yarn in two strands and on the
GN24, 5:17.5 p. and 24r. = 10х10sm.
Order of work
Backrest: On spokes N24, 5 strands in
Two strands to dial 74 p. and knit Fringe-
2 p. Hollow Rubber Band, then continue
Rubber band 1х1. After 2 cm of total
Honeycomb to continue the faces. Surface. To
To simulate the sides, reduce from both
Parties within the limits of 4 p. P. In each
6th P. 6 times; 17 cm from the Fringe 40
P.) Add on both sides of 1 paragraph in the
4th P. 8 times. 31 from the Fringe (=
74 p.) For armholes close on the sides by Z
P., then reduce to the limits of Z p. to 2 p.
Through 4 p., then 2 p. in each 6th
P. 2 times, after 17 cm from the beginning of the armholes
40 p.), for bevel line of shoulders close
On both sides of the external L p. in each
2nd P. 8 times, simultaneously diminishing the
Within the first and the last Z p.
1 p. In each 2nd P. 8 times. After 7 cm
From the beginning of the bevel of the shoulder line (= 16 p.)
Cover the remaining 28 p.
Right shelf: On spokes N24, 5
Yarn in two strands to dial 35 p. and
2 p. Hollow Rubber Band, then
Continue with the rubber band 1х1. After 2 cm
Total height to continue the faces. Surface.
In the left part of the canvas model
Side is similar to the one on the backrest. In the
The same time through 12 cm from the fringe (=
28 p.), to pocket the first
5 p., close 21 next p. and postpone
Work, separately, for internal
Of the pocket, on the spokes nq4, 5 strands in
Two threads dial 21 p, and knit 12 cm
IPMs. Surface. Insert these p. into place
Closed loop pockets and continue
Knit at all p. Persons. Surface. After 2 p.
Continue in this way:
First 13 p., then following. N. Persons.
Crossed and complete a range of high-
Nick In the next. A number of * knit Iznanoch
The crossed loop, which was
Crossed, and all others to touch
IPMs. P. *. After 4 p. Projazat First 11
P., add L persons. N, out of stretch, 2
Persons. N., 1 persons. P. Skretdennaya, 2 p.
Persons. Perform a reverse row of the
The description from * to continue
work by adding 1 persons.
P. From the stretch in every 4th P. z Times,
Then in each 2nd P., always in the pre-
Cases of 2 p. preceding 1 persons. P.
Crossed, and repeat the killing,
Following persons. Crossed. P.
To tear the knitting thus to the armholes.
After 29 cm from the border (= 68 R.) For mountains-
In the right part of the work
In the limits of 4p, on 1 p, in each 4th p. 7
Times, by 1 p. in each 6th P. 5 times, via
31 cm from the border (= 74 R.) for the Armi-
On the left side of the blade 4 p., then
Decrease within 3 p. to 2 p. through 4
P., 2 p. In each 6th P. 2 times; About
By tying all the persons. Surface.
26 cm from the beginning of the neck 62
P.) Close the remaining 15 shoulder.
Left Shelf: Knit Simma-
Tritically right shelf.
Sleeves: On spokes N24, 5 yarn in
Two threads dial 40 p., Knit 2 p.
Rubber Band, then continue
Persons. Through 24 cm of total
Honeycomb 58 p.) Add on the sides by
1 p. In each 10th P. 7 times. In 32
CM from the beginning of additions (= 76 R.),
For the armholes on both sides of the
The range of the P. 2 p. In each 4
P. 2 times, 2 p. In each 6th p. 4
Times, Ggo2 p. In each 2nd P. 2 times.
After 17 cm from the beginning of the armholes (= 40
P.) Close the remaining n.
Pockets edges: On the spokes N93 on-
Take 9 p. and knit 12 cm rubber Band
1x1. Close P. Run 2 parts.
Trims: For the edge of the right shelf on the
Spokes N23 Dial 141 p., Projazit
2 p. Hollow Rubber Band, then continue
Rubber band 1х1. On the right side of the canvas
Add within the first D p. 1 p.
In every 6th P. 4 times. After 6 cm
Close to the left side of the
Lotus 89, then in each 2nd p. b
P. 2 times, 5 p. 8 times. Run Edge
Left shelf symmetrically.
Collar: on spokes N23 dial
131 p., Projazat 2 p. Hollow Rubber Band,
Continue with the rubber band 1х1. On the sides
be added within 9 p. L p. to the
6th R, b time. After 10 cm total
Height close N.
Belt: Dial 9 p. and Knit Rubber Band
1x1. After 80 cm close the p.
Assembling and finishing
Perform shoulder seams. Connect
Between the straps and the neck, the
Edges with increases only on the
Tracks 5 cm. Sew Edges and collar
Front and along the neck of the
Ny. Perform side seams. Collect
and sew sleeves. Unscrew the bottom edges
Sleeves on the faces. Side and attach
Small stitches only on the
of the underarm seam. Sew Edges
Pockets to the top of your pockets and
Fastened on the side. Attach to the
The edge of the inside of the pockets.
For slaps: Use a needle to make
Loops on both sides at a distance
20 cm from the bottom edge and process them
Loop stitch. Put the buckle on
Belt, attach it. Attach One
Part of the buttons to the wrong side of the strap
Shelves: 1-st Button at the level of 17 cm
From the bottom edge, 2-at a distance
12 cm from the first.
P., add L persons. N, out of stretch, 2
Persons. N., 1 persons. P. Skretdennaya, 2 p.
Persons. Perform a reverse row of the
The description from * to continue
work by adding 1 persons.
P. From the stretch in every 4th P. z Times,
Then in each 2nd P., always in the pre-
Cases of 2 p. preceding 1 persons. P.
Crossed, and repeat the killing,
Following persons. Crossed. P.
To tear the knitting thus to the armholes.
After 29 cm from the border (= 68 R.) For mountains-
In the right part of the work
In the limits of 4p, on 1 p, in each 4th p. 7
Times, by 1 p. in each 6th P. 5 times, via
31 cm from the border (= 74 R.) for the Armi-
On the left side of the blade 4 p., then
Decrease within 3 p. to 2 p. through 4
P., 2 p. In each 6th P. 2 times; About
By tying all the persons. Surface.
26 cm from the beginning of the neck 62
P.) Close the remaining 15 shoulder.
Left Shelf: Knit Simma-
Tritically right shelf.
Sleeves: On spokes N24, 5 yarn in
Two threads dial 40 p., Knit 2 p.
Rubber Band, then continue
Persons. Through 24 cm of total
Honeycomb 58 p.) Add on the sides by
1 p. In each 10th P. 7 times. In 32
CM from the beginning of additions (= 76 R.),
For the armholes on both sides of the
The range of the P. 2 p. In each 4
P. 2 times, 2 p. In each 6th p. 4
Times, Ggo2 p. In each 2nd P. 2 times.
After 17 cm from the beginning of the armholes (= 40
P.) Close the remaining n.
Pockets edges: On the spokes N93 on-
Take 9 p. and knit 12 cm rubber Band
1x1. Close P. Run 2 parts.
Trims: For the edge of the right shelf on the
Spokes N23 Dial 141 p., Projazit
2 p. Hollow Rubber Band, then continue
Rubber band 1х1. On the right side of the canvas
Add within the first D p. 1 p.
In every 6th P. 4 times. After 6 cm
Close to the left side of the
Lotus 89, then in each 2nd p. b
P. 2 times, 5 p. 8 times. Run Edge
Left shelf symmetrically.
Collar: on spokes N23 dial
131 p., Projazat 2 p. Hollow Rubber Band,
Continue with the rubber band 1х1. On the sides
be added within 9 p. L p. to the
6th R, b time. After 10 cm total
Height close N.
Belt: Dial 9 p. and Knit Rubber Band
1x1. After 80 cm close the p.
Assembling and finishing
Perform shoulder seams. Connect
Between the straps and the neck, the
Edges with increases only on the
Tracks 5 cm. Sew Edges and collar
Front and along the neck of the
Ny. Perform side seams. Collect
and sew sleeves. Unscrew the bottom edges
Sleeves on the faces. Side and attach
Small stitches only on the
of the underarm seam. Sew Edges
Pockets to the top of your pockets and
Fastened on the side. Attach to the
The edge of the inside of the pockets.
For slaps: Use a needle to make
Loops on both sides at a distance
20 cm from the bottom edge and process them
Loop stitch. Put the buckle on
Belt, attach it. Attach One
Part of the buttons to the wrong side of the strap
Shelves: 1-st Button at the level of 17 cm
From the bottom edge, 2-at a distance
12 cm from the first.