Helena

Knitting Vest Pattern

Click For Crochet Abbreviations List

Dimensions: 36/38, 40-42 and 44/46.

You will need:

500 (550/600) g Garn TAVIRA type yarn from GGH, lilac color No38 (100% cotton, 80 m/50 g);

spokes No.3,5-4 and 4-4.5, as well as 6 buttons with a diameter of 18 mm.

Gum:

Faces. knit alternately 1 persons. scratching., 1 th. P.;

In the sofa. It's a snot. n. knit the inn. scratching, faces. n. - facial.

Persons. Iron: Faces. Persons. P., the snout. R. - out. P.

It's a seain. Iron: Faces. R. - out. P., the snout. Persons. P.

Fantasy pattern:

Knit according to the scheme on which only persons are given. R.; In the sofa. r. loops knit on the pattern, naquisand and bumps - as indicated.

Additional. loops of bumps in these loops are not counted.

For the bar after the 1st and 2nd r. tie 4 x from 3rd to 6th p.

Then for the braid constantly repeat on the outer 7 p. from the 7th to the 10th until the end of the work.

For a pattern with holes on the average 15 p. from the 7th to the 32nd r. to tie for the back and shelves 2 times and for sleeves - 3 times.

Then knit from the 33rd to the 64th, and then on these 15 p.m. continue to sleep. Surface.

Knitting density:

Persons. Strokes on spokes No. 4-4.5: 17 p. and 25 p.

29 p. fantasy pattern is approximately 14 cm wide.

Back:

On spokes No.3.5-4 to score 81 (89/97) p. and in the 1st of the day. R. knit the trail. (crom., 9 (13/17) n. gum (starting with 1 tablets, 1 persons.), 2 persons. p., 3 th. 2 persons. p., 13 p. rubber bands, 2 persons. p., 3 th. 2 persons. n. q, 7 p. rubber bands, repeat from q to z 1 time, 9 (13/17) p. rubber bands, crom.

Now knit a fancy pattern of 27 p. from q to q, the rest of the loops knit as described; After the 1st persons. 85 (93/101) p.

After 19 p. go to spokes No.4-4.5 and continue the trail. : Crom., 9 (13/17) persons. Gladiators, 29 p. fantasy pattern (as before), 7 p. faces. Gladiators, 29 p. fantasy pattern, 9 (13/17) faces. Iron, crom.

At the same time, for lateral slants on both sides in each 12th (10th/10th) p. p. reduce 3 (4/4) x 1 p.

At an altitude of 30 cm for the roll out, the sleeves on both sides close 1 x 8 (9/10) p., then in each 2nd p. close 4 (5/5) x 1 p.

At an altitude of 45 (47/49) cm for cutting the neck in the sofa. R. tie the average 31 (31/ 33) p. and set aside, on either side of them close in each 2nd p. 3 x 1 p.

At an altitude of 48 (50/52) cm close the remaining 15 (18/20) p. shoulder, while interweaving to tie 1 x 2 p. together faces.

Left shelf:

On spokes No.3.5-4 to score 42 (46/50) n.

In the 1st of the year. R. knit the trail. Image: Crom., 1 scratching. 2 persons. p., 1 inn. scratching. (back), 27 p. from q to q as on the back, 9 (13/17) p. gum, crom. P.

Now knit as described on the right half of the back, tie the p. badges on the pattern of 44 (48/52) p. after the 1st row.

After 19 p. spokes No.4-4.5 knit as on the right half of the back, loops of beak knit as before.

At the same time, the side slant and the sleeves run from the right edge, as on the back of 35 (38/41) n.

At an altitude of 40 (42/44) cm to cut the neck from the left edge to set aside 1 x 15 (15/16) p., then in each 2nd p. close 5 x 1 p.

At an altitude of 48 (50/52) see the remaining 15 (18/20) p. shoulder, while interweaving to tie 1 x 2 p. together.

Right shelf:

Knit is similar, i.e. the 1st of the yin. start as described on the back, after 27 p. from q to q, finish 1 in. scratching. 2 persons. p., 1 inn. scratching.

At the same time, perform 6 holes for buttons: 1st - at an altitude of 2 cm, 2 at an altitude of 7 cm, the rest of the holes to perform at an interval of about 8 (8.5/9) cm.

For the button hole in the hole. R. before the last 3 p. perform 1 cape, in persons. the nakid to tie the snare. And in the trail. I'm not. this loop with a trail. to tie the inn together.

Sleeve:

On spokes No.3.5-4 to score 39 (43/47) p. and in the 1st out. R. knit the trail. image: krom., 5 (7/9) p. gum (start with 1 of. crossed), 27 p. from q to q as on the back, 5 (7/9) p. gum, crom. 41 (45/49) p. after the 1st p.

After 19 p. go to spokes No.4-4.5 and knit a trail. : Crom., 5 (7/9) persons. gladiators, 29 p. fantasy pattern, 5 (7/9) faces. Iron, crom.

At the same time, to slant the sleeves on both sides add in each 8th p. 10 (8/2) x 1 p. and in each 6th p. 0 (4/12) x 1 p.

At a height of 45 cm for roll sleeves on both sides close 1 x 8 (9/10) p., then in each 2nd p. reduce 3 x 1 p., in each 4th p. 3 x 1 p. and in each 2nd p. reduce another 6 x 1 p.

For this after the crom. perform 1 stretch (z remove 1 p. as persons., 1 persons. and stretch it through the filmed p.); knit up to 3 p. before the end of the series, then 2 p. together persons., crom.

Then close the remaining 21 (27/33) n.

Assembling parts:

The details straighten and under a damp towel to allow to dry.

Run all the seams, roll up your sleeves.

For the neck of the neck spokes No.3.5-4 to tie the laid loops of the right shelf, with the first 13 p. to perform as before and 2 (2/3) of the living. P.; up to the deferred backs to raise 20 p., tie 31 (31/33) p. backs of the facial (on interweaving to tie on 1 x 2 p. together faces.), then symmetrically finish q 99 (99/103) p.
Continue knitting on both sides by 13 p., as previously, on an average of 73 (73/77) p. to tie 1 inn. facial and 3 p. persons. Surface.

In the trail. I'm not. knit on all hinges face, while on interweaving to tie 1 x 2 p. together faces.

Then close the remaining 97 (97/101) p., snitting the facial.

Sew the buttons.


Source : https://vyazaniye.com/item/korotkij-zhaket-fantazijnym-uzorom.html







Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments