Emma

Body on Ties for Infants

Click For Crochet Abbreviations List

Body is connected by knitting needles.

Age: 6-9 months.

Materials

180 g yarn (100% cotton) white, 80 g yarn blue color and 2 buttons in tone.

Needles № 3.5 and 4.

Fantasy patterns: Diagrams 1 and 2.

Arr: Execute at the beginning of the p. After 1 IPMs. P. And at the end of the R. Before 1 IPMs. P.

UB.: At the beginning of the River Elm. 1 IPMs. P. and 2 VMs. IPMs. For 3 p. To the end of the River Elm. 2 VMs. IPMs. and finish 1 IPMs. P.

Density of Knitting: 10 x 10 cm = 23 p. x 32 R.

Description of the work

Attention: Elm. In 2 strands a single detail, starting with the straps back.

On the Spokes № 4 to dial 8 P. and Elm. Pattern 1, arr. On both sides in each 2 p. 6 times on 1 p. = 20 p. Continue the elm, performing arr. Only on the side of the neckline in each 2-R. 5 times 1 P. = 25 p., and postpone work. Tie the second strap symmetrically first. Combine P. Both straps, typing between them 3 p. = 53 p., tie 8 R. Straight and then arr. On both sides in each 2-th R. 6 times on 1 p. = 65 p., in each p. 17 times on 1 p. = 99 p. and in each 2-th p. 3 times on 1 p. = 105 R.

Link 8 R. Straight and start UB. Trail. Way: In each 2-th p. 3 times on 1 p. = 99 p. and in each p. 36 times on 1 p. = 27 P. Link 14 R. Straight and arr. On both sides in every 2-D. 2 times on 1 p. = 31 P., in each p. 35 times on 1 p. = 101 P. And in each 2-th p. 2 times on 1 p. = 105 P. To tie straight 8 R. and UB. On both sides in each p. 18 times on 1 p. = 69 P. Execute the finishing according to scheme 2, simultaneously UB. On both sides in each 2-th R. 10 times on 1 p. = 49 p.

Continue the elm. Pattern 1, UB. On both sides in each 2-th p. 2 times on 1 p.-45 p. Tie 6 R. Straight, close the central 3 p. and Elm. 21 p. For each strap separately, UB. On both sides in each 4-th R. 3 times on 1 p. = 15 p. continue to UB. Only on the side of the neckline in each 4-th R. 3 times 1 P. And again on both sides in each 2-D 4 times on 1 p. Close the remaining 4 p. and finish the elm. 

Assembly

The filament of blue color to perform bias of 10 p. Length of about 2.6 m trace. In the following way: 1st P.: 1 P. Ch., not tying, 1 nac., 8 persons. P., 2 VMs. Persons.; 2-nd R.: 1 P. Ch., not tying, 9 p. IPMs. Reused. These 2 R. All the product to sew this Beykoy.

Run 4 cords. For each cut 4 threads in length of 1.5 m and twist. Sew the cords. On each straps pass to execute 1 loop for a button (to sweep 2 p.) to sew buttons on straps of a back. Moisten and allow the product to dry.

Scheme of knitting, pattern and symbols:





Source : https://www.liveinternet.ru/users/los-ku-tik/post245097390/







Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments