Click For Crochet Abbreviations List
Dimensions: 48-50 (52-54) 58-60
Short jackets
you will need: 550 (600) 650 g of red yarn Bamboo (70% bamboo, 30% cotton, 75 m / 50 g); straight needles number 5.5; hook number 5.
Knitting Technique:
Scarves: persons. and izn. R. - persons. P.
Facial surface: persons. R. - persons. n., izn. R. - izn. n. Pattern for slats: the number of loops is a multiple of 4 + 1 + 2 chrome. Every p. start and finish 1 chrome.
1st p .: 1 out., 3 persons., * 1 nakid, 2 p. Knit together with a broach (= 1 p. Remove as individuals., 1 p. And stretch it through the removed p.), 2 p., repeat from *, 1 d;
2nd reg .: * 1 person., 3 out., Repeat from *, 1 person .;
3rd b.: * 1 out., 3 persons., Repeat from *, 1 end .;
4th R.: Knit like the 2nd R.;
5th - 8th p .: as the 3rd and 4th p .;
9th b.: * 1 out., 1 nakid, 3 p. Knit together persons., 1 nakid, repeat from *, 1 end .;
10th R.: izn.
The density of knitting, individuals. smooth surface: 15.5 p. and 22 p. = 10 x 10 cm.
The back. Dial 95 (103) 111 points and tie for a strap 1 cm garter stitch. Next, knit the faces. satin stitch. After 20 cm = 44 p. from the plank close on both sides for proym 1 x 5 p. and in each 2nd p. 1 x 2 and 1 x 1 p. = 79 (87) 95 p. After 43 cm = 94 p. (45 cm = 100 p.) 47 cm = 104 p. from the strap all the loops close. According to 17 (21), 25 outer loops fall on the shoulders, the average 45 points - on the neckline.
Left shelf. Dial 48 (52) 56 points and tie for a strap 1 cm garter stitch. Then the loops distribute the trace. way: Krom., 42 (46) 50 p. smoothing, 4 items shawl, chrome. The gap from the right edge should be done as for the back = 40 (44) 48 p. 25 cm = 54 p. (27 cm = 60 p.) 29 cm = 64 p. from the plank, reduce for bevel the neckline 18 x 1 n. in each 2nd p. To do this, knit from the left edge of the penultimate and last n. smooth together with a broach = 22 (26) 30 p. At the height of the back, close the first 17 (21) 25 p. for shoulders, the remaining 5 p. set aside.
Right shelf. Knit symmetrically. To reduce the slant of the neckline, knit the 1st and 2nd paragraphs together with the right edge from the right edge.
Sleeves. Dial 45 (49) 53 p. And tie for a strap 1 cm garter stitch. Then tie 10 p. pattern for slats and then knit faces. satin stitch. For bevels add on both sides, starting from the faces. smoothing, 4 (2) 0 x 1 p. in each 6th p., 8 (11) 14 x 1 p. in every 4th p., including added loops in the faces. smooth surface = 69 (75) 81 p. Through 27 cm = 60 p. from the strap close on both sides for the neck of the sleeve 1 x 5 p., in each 2nd p. 1 x 2, 9 x 1, 1 x 3 and 1 x 5 p. The remaining 21 (27) 33 p. Directly close after 39 cm = 86 p. from the plank.
Assembly. Run shoulder seams. On pending loops of the shelves, tie 11 cm with a garter stitch, then close the loop. Sew on the sleeves. Run side seams and sleeve seams. Sew the short sides of the slats. Sew sew to the neckline back.
TOP
You will need: 450 (450) 500 g of Bamboo red yarn (70% bamboo, 30% cotton, 75 m / 50 g); straight needles number 5.5; hook number 5.
Knitting Technique:
Scarves: persons. and izn. R. - persons. n.
Pattern for slats: the number of loops is a multiple of 4 + 1 + 2 chrome. Each row starts and ends with 1 chrome.
1st b.: 1 out., W. Persons, * 1 nakid, 2 pts. Knit together with a broach (= 1 p. Remove as faces., 1 faces. And stretch it through the removed p.), 2 faces., repeat from *, 1 d;
2nd reg .: * 1 person., 3 out., Repeat from *, 1 person .;
3rd R.: * 1 out., 3 persons., Repeat from *, 1 out .;
4th R.: Knit like the 2nd R.;
5th-16th p .: as the 3rd and 4th p .;
17th river: * 1 out., 1 nakid, 3 p. Knit together persons., 1 nakid, repeat from *, 1 end .;
18th river: * 2 out., 2 persons., Repeat from *, 1 out .;
19th river: 1 person., * 2 out., 2 people., Repeat from *;
20th r .: as the 18th r .;
21st - 36th p .: as the 19th and 20th p .;
37th r .; 1 person., * 1 nakid, 2 p. Knit together persons., Repeat from *;
38th p. from
Border width 57 (61) 65 p.:
1st p.: 1 nakid, 2 p. Knit together persons., 53 (57) 61 p. Persons. smoothing, 2 p. knit together broach, 1 nakid;
2nd p .: iz .;
3rd and 4th p .: izn.
Repeat from 1st to 4th p.
Facial smoothness: persons. R. - persons. n., izn. R. - izn. p.
Gum: alternately 1 persons., 1 out.
The density of knitting, individuals. smooth surface: 15.5 p. and 22 p. = 10 x 10 cm
Back. Dial 91 (99) 107 p. And tie for a strap 1 cm garter stitch. Then tie 17 cm = 38 p. pattern for slats and then knit faces. satin stitch. After 22 cm = 48 p. from the beginning of the faces. smooth the loop to distribute the trace. way: chrome., 19 p. gum, 24 (28) 32 p. persons. smoothing, 10 p. gum, starting from 1 out., 1 average p. persons. smoothing, 10 p. gum, 24 (28) 32 p. persons. smoothing, 10 p. gum, starting with 1 out., Chrome. Simultaneously with the beginning of the gum, turn down on both sides for 6 x 1 armholes in each 2nd p. To do this, from the right edge of the last paragraph gum and trace. p., c left edge - 1st p. gum and previous p. knit together izn. Simultaneously with the beginning of the gum, close the middle section for the V-shaped neckline and finish both sides separately. For the bevel, subtract 16 x 1 section from the inner edge in each 2nd p. To do this, knit the 1st p. From the right edge. gum and the previous item., from the left edge - the last item. gum and the next item. Through 44 cm = 96 p. (46 cm = 102 p.) 48 cm = 106 p. from the slat close the remaining 23 (27) 31 p. shoulder.
Before. Knit the same, only after the strap and 2 p. individuals. smooth the loop to distribute the trace. way: Krom., 16 (18) 20 p. smoothing, 57 (61) 65 p. border, 16 (18) 20 p. smooth Through 17 cm = 38 p. from strap on all loops to knit faces. satin stitch.
Assembly. Run shoulder and side seams. Tie all edges with 1 circular p. Art. b / n