Maria

Two-tone pullover with openwork patterns and oblique

Click For Crochet Abbreviations List

Sizes: 46/48 (50/52) 54/56 

You will need: 200 (250) 300 g each of bright pink and purple My Silk yarn (34% silk, 33% cotton, 33 % polyacryl, 175 m / 50 g); Needles number 3.5. 

Knitting technique: 
Facial surface: persons. R. - persons. n., izn. R. - izn. p. 
Wrong surface: persons. R. - izn. n., izn. R. - persons. p. 
Gum: alternately 2 persons., 2 izn. 

Openwork pattern 1 and 2: the number of loops is a multiple of 7 + 2 chrome. Knit under the scheme 1 and 2, which are only individuals. r., in izn. R. loops and nakida knit izn. Repeat from the 1st to the 18th p. 

Pattern with a scythe (width 8 p.): 
1st, 3rd, 5th, 7th, 9th, 11th, 13th and 15th p.: Persons. n. 
2 nd and all izn. p: izn. P.
17th p.: Leave 4 p. On the auxiliary spoke at work, 4 persons. and knit loops with auxiliary needles spokes. 
Repeat from the 1st to the 18th p. 

Knitting density: 21 p. And 34 p. = 10 x 10 cm. 

DESCRIPTION OF WORK

Back. Bright pink thread dial 61 (68) 75 p. And 61 (68) 75 p. Lilac thread = 122 (136) 150 p. And tie for a strap between the chrome. 2 cm = 8 p. rubber band. When changing colors, cross the threads on the wrong side of the work so that no holes appear. Then knit as follows: bright pink thread 1 chrome., 55 (62) 69 p. Openwork pattern 1.1 p. Purl, 4 p. Of the pattern with a scythe, lilac thread 4 p. Of the pattern with a scythe, 1 p. smooth surface, 55 (62) 69 p. openwork pattern 2.1 chrome. Through 42 cm = 142 p. (42 cm = 142 p.) 46 cm = 156 p. from the strap close for armholes on both sides of 6 p. and in each 2nd p. 1 x 3, 1 (2) 3 x 2 and 4x1 p. = 92 (102) 112 p. Through 18 cm = 62 p. (20 cm = 68 p.) 22 cm = 74 p. from the beginning of the armhole, close the middle 48 (54) 60 section for the neckline cut and finish both sides separately. For rounding up close from the inside edge in every 2nd p.

Before. Knit like a back, but start with a purple thread and with a V-neck. To do this through 45 cm = 154 p. (45 cm = 154 p.) 49 cm = 168 p. from the plank, close the middle 8 s. (= pattern with a scythe) and finish both sides separately. For the bevel of the notch, subtract from the inner edge 25 (28) 31 x 1 p., For this after chrome. or before chrome. do not perform 1 nakid.

Left sleeve. Lilac thread dial 52 (56) 60 p. And tie for the strap between the chrome. 2 cm = 8 p. rubber band. Then knit openwork pattern 1, while adding for the bevel sleeves in the 1st p. 1 n. And in every 10th p. 10 x 1 p., Including the added loops in the pattern = 76 (80) 84 p. Through 37 cm = 126 p. (39 cm = 132 p.) 40 cm = 136 p. from the slat, close the sleeves for sleeves on both sides of 6 p., then in each 2nd p. 1 x 3.1 x 2 and 1 x 1 p., In each 4th p. 12 (13) 14 x 1 p., In each 2nd p. 1 x 2.1 x 3 p. Through 17 cm = 58 p. (18 cm = 64 p.) 20 cm = 70 p. from the beginning of the neck, close the remaining loops, tying 2 pt together. 

Right sleeve. Knit as the left sleeve, but with a bright pink thread and openwork pattern 2. 

Assembly. Run shoulder seams; insert sleeves, perform side seams and sleeve seams.











Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments