Kathie

Great long white knit sweater free pattern

Click For Crochet Abbreviations List

For work we will need: 

thick yarn (100% wool, 50 meters per 50 grams) - 18-20-22-24-27-29 hardships; 
Circles. cn No. 8, 80 cm; 
stockings cp No. 8; 
circles. cn No. 7, 60 cm. 
Ready can be: SML-XL-XXL-XXXL. 

The density of the binder is 11 p. X 15 p. = 10 x 10 cm. 

Patterns and equipment used at work. 

Main pattern (see diagram M.1). 
Platter circle binding: 1 p. people. p. 1 p. worn out. n. The 
addition of loops is carried out by adding 1 n. by using nakida. Sled R. we tie up the back lobule, so as not to form a hole. 

How to tie a sweater with your own hands: description The 
front and rear part 
Knit in round rows.
We recruit circles. cn No. 8 97 (106, 117, 128, 143, 152) p. And tie 6 pp. garter-bed viscera, equally appealing in the wake. p. 17 (20, 21, 22, 25, 28) p. = 114 (126, 138, 150, 168, 180) p. 

Mark 1 and 57th (63rd, 69th, 75th, 84th, 90th) markers by the markers - this is the side of the p. 
We knit with a look (frame M. 1) with circular rows. Reaching a height of 62 cm, closing. 5 loops on both sides (marked with loop markers in the middle of these 5 points). The front and back parts are now knit separately. 

The back 
Here we have 52 (58, 64, 70, 79, 85) paragraphs. Continue to knit on the pattern (scheme M. 1), closing the loops in the start. every p. for armholes: 2 part numbers x 1 (2, 2, 4, 5, 7) and 1 part x 1 (2, 2, 2, 1, 2, 1) = 46 (46, 52, 52, 55, 55 ) P.

Reaching the height of the product in 79 (80, 81, 82, 83, 84) cm, closed. central 20 (20, 22, 22, 23, 23) items for the head. 
In the new p. closing on the side of the mouthpiece, esche 2 p. = 12 (12, 14, 14, 15, 15) p. on each shoulder. We tie the shoulders to a length of 82 (83, 84, 85, 86, 87) cm and close. loops 

Front end 
Here we also have 52 (58, 64, 70, 79, 85) sections. , 52, 55, 55) Section. 

Having reached the height of 79 cm, we remove the central 18 (18, 18, 18, 19, 19) section on the holder (this will be hollow) and finish the halves separately.

Cover the loop of the mouth of the mouthpiece in each. p. in this way: 2 subsections x 1 and 1 subsection x 0 (0, 1, 1, 1, 1) = 12 (12, 14, 14, 15, 15) n for shoulders. We tie them up to 82 (83, 84, 85, 86, 87) cm and close all of the Section of the Sleeve . 

The 
sleeves knit straight. 
We recruit 27 (28, 29, 30, 31, 32) n. n. on sp. No. 8 and tie 6 pp. plateau viscous, uniformly adding in the last. R. 2 (4, 6, 8, 7, 9) p. = 29 (32, 35, 38, 38, 41) p. 

Thereafter, we continue the knitting by drawing with the scheme M. 1 (we knit the crochet stitch with a knit). He was tied up to a height of about 7 cm, adding 1 p. Along the edges (after the 1 st and the next of the last. P.). Repeat increments through each 4.5 (4.5; 4; 4; 3; 3) cm x 8 (8, 8, 8, 11, 11) = 47 (50, 53, 56, 62, 65) p.

Reaching a height of 48 (47, 45, 45, 43, 43) cm, pribryvaem on 3 p. With kraev. After this we cover the heels in the beginning. every R. On either side in this way: 2 items x 2 (2, 3, 3, 4, 4) and 1 items x 0 (0, 0, 1, 1, 0). Next, we accept 2 items at the beginning. every R. until the arm is connected to a length of 55 (56, 54, 55, 55, 56), see. Now cover 3 s on each side, after which we cover all p. Sleeve length should be 57 (58, 56, 57, 57, 58) see. 

We 
assemble the seams along the shoulders, stitching in and sewing the arms. 

Gorlovina 
Krugovaya knitting needles № 7.
It is uniformly typed from 40 to 60 points (including and from the holder) along the neck. Knit 1 p. worn out. p. 1 p. Lyceum p. and again 1 p. worn out. pb pos. R. Apply or diminish the loops in such a way so that 50 (56, 62, 68, 74, 76) paragraphs 

remain in you . After this knitting, 1 p. Lyceum p. and proceed to the binding of rubber 1 x 1 at a height of 4 cm, after which we add after each o. p. 1 p. due to nakida (read description of uzorov). In the new row we tie up this backing behind the back part = 75 (84, 93, 102, 111, 114) p. 
We continue the knitting by drawing M. 1 along all the loops. Knit the mouth at a height of 24-26 cm and close all the eyelets. A long warm sweater for the winter is ready!








Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments