Click For Crochet Abbreviations List
Size: 46-48
JUMPER
You will need: 400 g of Alpina Silvina lilac (55% polyamide, 45% cotton) 50 g / 100 m. Knitting needles No. 4 and No. 5, hook No. 3.
The model is knitted from above, starting with a round coquette with lousy, separately connected sleeves, openwork patterns according to schemes 1, 2, 3.
Density: 15 p. X 21 p. = 10 cm x 10 cm
Front and back: Type 110 p. On the needles number 4 and knit 6 rows of garter stitch in a circle. Then go to the needles No. 5 and knit 11 openwork rhombuses according to the scheme 1, expanding the canvas with nakidov in the drawing itself up to 14 p. X 11 = 154 p. After 15 cm, having finished the drawing with rhombuses, knit 4 rows garter stitch, then distribute the loop as follows: on the back - 55 p .; for sleeves, close by 22 p. and leave the other loops on the front.
Transfer the loops to the working spokes and knit 5 rapports according to scheme 2 (repeating the 1-8th rows). Check that the design is symmetrical about the center. For an armhole with a length of 14 cm, add 1 p. On both sides every 6 rows, introducing additional loops into the pattern. Knit stitches for the back 4 cm longer, connect it with the loops on the front, add loops between them to save the design, and knit further with a single cloth in a circle of 10 cm.
Evening set
For a curl, gradually sew 2 sections in each repeat, as shown in row A of scheme 2. After knitting to the waistline, reduce 2 pts (see row B of scheme 2) and knit 4 rows of garter stitch (on the needles 112 p.), then go on to the drawing according to scheme 3, making 8 diamonds but 14 Finishing the pattern, knit 4 rows of garter stitch and close all the loops.
Sleeves: Dial 32 points, knit 4 rows of garter stitch, and then 2 openwork rhombus according to scheme 3, knitting between them for 1 person. After 12 cm, after finishing the design of rhombuses, knit 4 rows of garter stitch and switch to the openwork stripes according to scheme 2. To expand the sleeve, add 1 s on each side after 6 rows, inserting additional loops into the pattern. After 34 cm for dummy, subtract from 3 sides by 3 points, then by 2 points, and then by 1 point, until 22 points remain on the needles. Close them one by one.
Assembly: Sew the sleeves and sew them. Tie the bottom of the sweater with a crochet hook.
SKIRT
You will need: 250 g of lilac cotton and silk thread with lurex, combined into one thread, and a slightly darker melange silk thread with lurex. Spokes number 5 and hook number 3.
The model is knitted with a solid openwork pattern from the hip line down with 6 wedges according to scheme 1. Attention! Start the first rapport and finish the last one by proving 2 pp in 1 pp, not 3 pp in 1 pp, knit the rest of the rapport according to the scheme. [Cut]
Density: 15 p. X 21 p. = 10 cm x 10 cm
Dial auxiliary thread on the needles 140 p. = 6 wedges, 23 p. + 2 kr. and knit each wedge in accordance with scheme 1, expanding it by means of single-stitches in the drawing itself. After finishing the whole drawing, close the hinges. Sew a skirt. Cut the thread of the initial row, dial the open loops on the working needles and tie 15-20 cm to the waistline. Tie the top edge of the S1H for the belt and stretch the thin rubber band between the posts. Crochet the bottom edge with a dark thread according to Scheme 2, where the corner trimming is given.
JACKET
You will need: 200 g of lilac cotton and silk thread with lurex, joined together in one thread, and a slightly darker melange silk thread with lurex. Spokes number 5 and hook number 3.
The model is knitted from the neck with an openwork pattern in one detail according to scheme 1. Attention! Start the first rapport and finish the last one by tying 2 p. To 1 p., And not from 3 to 1 p., Knit the other rapports according to the scheme. The finishing pattern is connected according to scheme 2.
Density: 15 p. X 21 p. = 10 cm x 10 cm
Type on the needles 104 p. = 6 rapports of 17 p. + 2 cr. and knit each rapport according to scheme 1, expanding it with the help of single-stitches in the drawing itself. After 23 cm (in 41 rows) for sleeves, drop the loops of the 2nd and 5th rapport into the spokes-pins. To move the neck on the front, transfer the backrest loops to the working needles and knit 4 rows of backs only, continuing the drawing. Then add 3 points between the back and the shelves, connect the shelves and the back and continue to knit 4 rapport according to the pattern to the desired length with one web. After completing the pattern according to scheme 1, knit 8-10 rows with the front satin stitch and finish with the pattern according to scheme 2, so that the centers of the patterns coincide. Remove the loops of the sleeves from the pins to the working knitting needles and tie each sleeve, continuing the drawing according to the scheme 1, and then - according to the scheme 2. Crochet the neckline with the crochet yarn according to the scheme 3,