Click For Crochet Abbreviations List
Size
36/38 (40/42) 44/46
You will need to
Yarn (100% Flax; 110 m/50 g)-500 (550) 600 g emerald and 50 g silver; Spokes № 4; Circular Spokes № 4; 5 buttons (size 40 mm).
Patterns and diagrams
Gum
Even number of loops. Facial and Purls rows: The crown, alternately 1 facial, 1 purl, and the crown.
At an odd number of loops purls rows: kromosknom, alternately 1 purl, 1 obverse, to finish 1 reverse, kromoskno. Facial rows: Loops to tie on the figure.
A Pattern of rhombuses A
1 raport = 26 p. = Knit SOGL. Scheme, the highlighted gray loops here do not matter. On the scheme are the facial rows. In purl rows all loops to tie on a drawing, a scale to tie off obverse. Loops to distribute Sogl. How to. Constantly repeating the ranks given in height.
Attention
Rapport does not always coincide with the number of loops. Therefore, at the beginning and at the end of the pattern do not perform incomplete overlap, and tie loops facial or purl sogl. Pattern. Also Make sure that the number of the scale and the loops inside the pattern coincide.
Diamond B Pattern
1 raport = 20 p. = Knit as pattern A, but only perform the highlighted gray loops (= 6-25 loops of the circuit). Constantly repeating the 1st-32nd series.
Density of Knitting
22 p. x 28 R. = 10 x 10 cm, is associated with a pattern of rhombs A;
21 p. x 28 R. = 10 x 10 cm, is associated with a pattern of rhombs B.
Doing the work
Back
A Silver thread to dial on Spokes 92 (102) 110 loops and for a lath, from 1 Iznanochnogo of a row, to tie 4 SM = 12 rows An elastic band and 1 seamy a row purl an emerald thread.
Continue the work with a pattern of diamonds A emerald thread, with the loops distributed as follows: Start with the crown and the last 17 (22) 0 loops of rapport, perform rapport 2 (3) 4 times, finish first 21 (0) 4 loops raport and cromous.
After 44.5 cm = 124 series from the bar close to the armholes on both sides of 1 x 5 p., then in each 2nd row close 2 x 2 p. and 1 (2) 2 x 1 P. = 72 (80) 88 p.
Through 65 cm = 182 Series (67 cm = 188 rows) 69 cm = 194 series from the strap to close all loops, with the average 46 (48) 50 p. form the neck, external to 13 (16) 19 p.-Shoulders.
Left Shelf
Silver thread dial on the Spokes 45 (50) 54 loops and tie the bar with the transition of colors, as on the backrest.
Continue work with a pattern of rhombuses A Emerald Thread, with the loops distributed as follows: Start with the crown and the last 17 (22) 0 loops Raport, perform rapport 1 (1) 2 times, finish the crown.
After 36.5 cm = 102 Series (37 cm = 104 series) 37.5 cm = 106 rows from the bar to reduce the neck bevel on the left edge of 1 x 1 p., then alternately in each 2nd and 4th row to reduce 16 x 1 p. and in each 4th row 5 (6) 7 x 1 p.
At the Same time, perform a walk on the right side, as on the back. At the height of the backrest, close the remaining 13 (16) 19 shoulder.
Right Shelf
Knit the same as the left shelf, but in the mirror display, with the pattern A distributed as follows: Start with the crown and the last 22 loops of rapport, perform rapport 0 (1) Once, finish the first 21 (0) 4 loops of rapport and cutting.
Sleeves
Silver thread dial on the spokes for each sleeve to 46 (50) 54 loops and tie the bar with the transition of colors, as on the back.
Continue work with a pattern of diamonds In the emerald Thread, with the start of the crown and the last 2 (4) 6 loops of rapport, to perform the Rapport 2 times, Finish first 2 (4) 6 loops Raport and Kromosnoy.
At the Same time to add for bevel sleeves on both sides in each 14th row from the lath 7 x 1 P. (alternately in each 10th and 12th row 9 x 1 p.) alternately in each 8th and 10th row 11 x 1 p. sogl. To the pattern = 60 (68) 76 p.
After 40 cm = 112 rows from the strap close to the sleeve of the sleeves on both sides 1 x 4 p., then in each 2nd row close 1 x 2 p., 14 x 1 P., 1 x 2 p. and 1 x 3 p.
After 53 cm = 148 rows from the plank close the remaining 10 (18) 26 p.
Assembly
Perform shoulder seams.
For a lath a silvery thread to dial on circular spokes on boards of shelves on 133 (137) 141 a loop, between them to dial on edge of a neck of a backrest 49 (51) 53 loops and on all 315 (325) 335 loops to knit a rubber band, since 1 Iznanochnogo of a row. In 3 rows from a set of loops to execute in the next Lyceum row on the right shelf 5 apertures for buttons, for this purpose to close on 2 loops and in a Vixen row again to dial. The Bottom hole for the button to execute after the crown and 25 p., the following 4 holes for buttons to execute at intervals of 12 p. At width of a lath 3.5 sm = 10 rows to close all loops on drawing.
Sew sleeves. Carry out side seams and seams of sleeves. Sew the buttons.