Click For Crochet Abbreviations List
Dimensions: 36/38 (40/42) 44/46
You will need:
300 (350) 400 g of Arioso type yarn from LANA GROSSA (48% pure wool, 30% Merino wool, 22% polyamide, 240 m / 50 g); Knitting needles number 5 and 5.5.
Out smooth surface: individuals. R. - ex. n., izn. R. - persons. P.
Persons smooth surface: individuals. R. - persons. n., izn. R. - ex. P.
The pattern for the strap: 5 rows - out. smooth surface, 2 rows - persons. smooth = 7 rows.
Spit A (30 p.):
Knit according to the scheme, which shows only persons. R.
In izn. R. all loops knit purl.
Link 1 x from the 1st to the 18th p., Then constantly repeat from the 3rd to the 18th p.
Scythe B (30 p.): Knit like a Scythe A, just start from the 9th row of the pattern.
Knitting density:
from + persons. smooth on the needles № 5,5: 18 p. and 24 p. = 10 x 10 cm;
pattern for the bar on the needles number 5: 7 p. = 2.5 cm;
Spit A and B on the needles No. 5,5: 30 p. = 7 cm in width.
Back:
On needles No. 5, dial 87 (94) 101 points and knit 2.5 cm = 7 p. For the slat. pattern for the strap, while starting with 1 out. row.
Then continue on the needles No. 5, 5 b. satin stitch.
For armhole sleeves through 43 cm = 104 p. (44 cm = 106 p.) 45 cm = 108 p. from the strip on both sides close 1 x 4 p., then in each 2nd p. close 1 x 3, 1 x 2 and 2 x 1 p. = 65 (72) 79 p.
Through 61.5 cm = 148 p. (64 cm = 154 p.) 66.5 cm = 160 p. from the bar to close all the items as ex., with the average 47 (48) 51 points forming the neck, the external 9 (12) 14 points refer to the shoulders.
Before:
On the needles number 5 dial 121 (129) 135 p. And first tie the bar, as on the back.
Go to the needles number 5, 5 and continue to the next. distribution: chrome., 28 (32) 35 p. stitch, 30 p. satin stitch, 3 p. stitch, 30 p. satin stitch, 28 (32) 35 p. stitch, chrome.
Through 27.5 cm = 66 p. (29 cm = 70 p.) 31 cm = 74 p. continue from the plank to the next. distribution: chrome., 28 (32) 35 p. stitch, 30 p. braid A, 3 p. stitch, 30 p. braid B, 28 (32) 35 p. stitch, chrome.
For the V-shaped neckline through 30 cm = 72 p. (31.5 cm = 76 p.) 33.5 cm = 80 p. from the strap, close the middle loop and finish each side separately, while knitting the inner loops as knotted chrome. (= constantly knit facial).
At the same time, for the bevel of the neckline, tie the last 2 points before the oblique A or the first 2 points after the braid B to knit together the inside out.
These reductions should be repeated 7 (8) 9 times in each 6th p.
Subtractings for armhole sleeves through 43 cm = 104 p. (44 cm = 106 p.) 45 cm = 108 p. from the strap on both sides to perform as on the back.
At the height of the back, close the outer 9 (12) 14 p. Shoulders and on the remaining 32 p. (= 30 p. Spit A or Spit B + 2 krom.) For the rear bar, continue another 13.5 cm = 32 r. (14 cm = 34 p.) 15 cm = 36 p. in accordance with the pattern, while in the last row between the chrome. p. knit on 2 p. together purl.
Then postpone the remaining 17 p.
Sleeves:
On the needles number 5 dial 42 (47) 52 p. And tie the bar as on the back.
Then continue on the needles No. 5, 5 b. satin stitch.
At the same time, for bevels from the strip on both sides, add 8 x in each 10-m p. and 2 x in every 8th p. 1 p. = 62 (67) 72 p.
For Okat sleeves through 43 cm = 104 p. from the strip on both sides close 1 x 2 p. and in each of the 2nd p. 3 x for 2, 5 x for 1, 2 x for 2, 1 x 3 and 1 x 4 p.
Through 54 cm = 130 p. from the bar to close the remaining 14 (19) 24 p.
Assembly:
Run shoulder seams.
Carry out the back seam of the neckline with a knitted seam and sew the rail over the neck of the back.
Sew in sleeves, complete side seams and sleeve seams.