Emma

Striped Pullover Free Pattern

Click For Crochet Abbreviations List

Striped pullover 
Size: 38/40 (42144 in) 46/48 
You will need: 100 (150) 150 g Color powder, mint, color Eckyu, 
Yellow-pink, blue and coral- (100% of the organic Cotton. 125 m/50 g): Straight and Circular Spokes 3.5, 
Gum. Direct and Inverse R.: 
Number of Loops multiple 5 + 3 + 2 chrome. 
Persons. R.: Krom., 3 persons.. 2. 
To finish the faces, Krom. 
IPMs. P.: Loops knit on the figure. 
Circular p.: Number of loops multiple 5. 
Knit alternately W faces. , 2. 

Main pattern: Number of loops multiple 
5 + 3 + 2 "rum. Knit PS Scheme. 
On which the persons are listed. and N. R. 
Start with 1 chrome. and loops before 
Raport, repeating rapport. Žakan 
to the chrome. Repeat from 1st to 
6th p. 
Sequence of alternation 
Stripes: Start with 2 p. Color powder. 
Then 6 p. • Mint, color of the grains. 
Yellow-pink, blue, coral 
and color powder. Repeat from • 
The platiness of Knitting: 21.5, 25.5 p. 
Backrest: Thread of color powder dial 
100 (110) 120 p, and link z cm 
Coy. Then knit the main knot 
In the specified sequence. 
Through 44.5 cm: 114 R. (47 cm: 120, 2) 
49.5 cm = 526 p. From Gum Close 
For neck cut average 28 p. 
And both sides to finish separately. 
For rounding, close the inner 
Its edge in every 2nd Ј x 3. X 2 
and 1x1 p. Through 47.5 cm: 522 p. (50 cm 
= 128 R.) 52.5 cm = 134 p, from gum 
Close on each side of the remaining 
30 (35) 40 p. Shoulder, 
Before: Knit the same, but for more 
Deep Neck cut Close 
40 cm: 102 (42.5 cm = P.) 
45 cm = 114 p. From Gum Medium 
12 p. And from the inner edge of 2 x 3, 3x 22х1l. 

Sleeves: Thread Color powder dial 
50 (55) 60 G. and connect 3 cm of rubber 
Coy. Then knit the main pattern 
In the specified sequence. 
At the same time from gum add 
For bevel sleeves appropriate 
Color on both sides in each 
6th 2. 10x and 3 each 8th p. 4 x (in 
Each 4th P. 2 x and in each 6th P, 
14 x) Alternately in each 4th and 
6th p, 18х1 p. = 78 (87) 96 p... Including 
Tea is added to the pattern. Neez 
38.5 cm = 98 p. From Gum all loops 
Close. 
Assembly: Perform shoulder seams, by 
Cut the neck to dial on the steep 
Knitting needles Thread Color powder 100 p., 
To connect the circular p. z cm to the 
And all loops close on the picture. 
Let's get the sleeves. Perform side 
Seams and seams of sleeves. 








Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments

Related Posts