Bertie

TWO COLOR BOOTIES CROCHET SCHEME DESCRIPTION

Click For Crochet Abbreviations List

Pretty booties for your crumbs. They knit simply, they look beautiful. 

Recruiting 12 vp 3 vp (total 15 vp), we enter the hook into the 4th loop of the chain from the hook and we knit 3 rows according to this scheme.


4 row: white thread in each loop knit art. b / n, introducing the hook behind the rear wall of the loop we end the row connection. st. in the first column b / n of this series. (there should be 56 items in this row in total. b / n) 
5 row: in each loop we knit art. b / n (56 Art. b / n), closes the row connection. st. blue thread, introducing the hook in the first article. b / n this series. 
6 row: knit "knob" of 2 vppp 2 unfinished Art. s / n, then knit 1 ce, * skip 1 ce foundations and knit "knob" of 3 unfinished art. s / n then knit 1 v. repeat from * to the end of the series. Closing a number of connections. Art., introducing the hook into the top of the "bump" 
7 row: knit as well as the 6th row. "knob of 3 st. s / n" knit in the top of the bump "before rally row. st. and break the thread.

We make an initial loop with a thread of white color. I knitted my booties for a 10 cm leg, noting the middle I started knitting a toe, insert a hook behind the back wall of the "nub" and pull out the initial loop, then knit a "nub" from 2 in. . and 2 unfinished art. s / n, to the next vertex of the "cone" before. row for the back wall of the loop knit "knob" of 3 unfinished art. With / N. Knit to the middle of the booties, I got 14 "knobs", then knit 2 ce., turn over knitting and knit "knob" from 2 unfinished art. s / n and 2 ce.p. * skip 1 loop and knit a "knob" of 3 unfinished art. s / n * repeat from * to the end of the row (in this row we have 7 "cones") knit the compound. Art., connecting the vertices of the "cones", here so knit "cone" of 2 vp. and 2 unfinished art. s / n knit 1 v.p. and "lump" of 3 unfinished art. s / n (we insert the hook into the leg of the outermost column of "nubs"), crochet the booties again, we knit 1 vp and a "cone" (we insert the hook into the leg of the outermost station of the next "cone"), we knit 1 item belt and the "cone" at the top of the "cone" 7 rows.

Next, we knit like the 7th row, then we end up knitting the row by analogy with how we crocheted the booties at the very beginning. Art., introducing the hook into the top of the "bumps". Similarly, we knit in a circle 2 more rows. We close a row connection. st. blue thread. Knit art. b / n in each loop and 3 v.p. between them. Shutting down a row of connections. st, carefully hide the ends of the threads. And our booties are almost ready. It remains to tie the lace from v.p.120 vp

We will link the second bootie in the same way! Now your baby's legs will be warm.

Source : http://petelki.com.ua/1826-dvuhcvetnye-pinetochki-kryuchkom.html







Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments