Desire

Cardigan with Openwork Patterns and Deep Cut

Click For Crochet Abbreviations List

This model will immediately make a strong impression. An elongated cardigan with openwork patterns and a deep neckline on the back looks very tempting.

DIMENSIONS
36/38 

YOU WILL NEED
Sectional dyeing yarn (38% cotton, 30% polyester, 26% viscose, 6% polyamide, 160 m / 50 g) - 300 g in lilac tones; spokes number 4,5.

PATTERNS AND PATTERNS

ELASTIC
Alternately 1 front, 1 purl.

MAIN PATTERN
Knit by the above scheme. Width after chrome. repeat the rapport between the arrows from the 12th point, finish 1 st after the 2nd arrow and chrome. In height, repeat from the 1st to the 8th row. When performing increments and deductions, make sure that the number of crochets and the loops in each row are the same.


DECORATIVE DECREASE
From the right edge = chrome., 2 stitches together with the slope to the left (= 1 st., Remove, as in the face knitting, the next loop to tie the facial and removed the loop to stretch through the knitted). 
From the left edge = 2 n. Tie together face, chrome.

DOUBLE LOOP
At the beginning of the row (after turning), lay the thread before work, insert the needle on the right in the 1st stitch and remove the loop with the thread. Then the thread is strongly pulled back, as a result, the loop is put on the spoke and a double loop is obtained. In the next row, both parts of the double loop are tied together according to the drawing.

DENSITY OF KNITTING
21 p. X 30 p. = 10 x 10 cm, is connected by the main pattern with knitting needles No. 4,5.

PATTERN




COMPLETING OF THE WORK

BEFORE
Collect 99 items and knit the main pattern, distributing the loops as follows: chrome., Repeat 8 times from 12 points, 1 step after the 2nd arrow, chrome. In the 7th r. from the set of rows to reduce (see Decorative reduction) on both sides for the bevels first by 1 st, then in each 6th p. 9 more times in 1 n. = on spokes 79 n. 

After 9 cm = 28 r. from the last reduction add on both sides first to 1 point, then add alternately * in each 2-nd and 4-th р. 1 pt., from * repeat 3 times, then after the next 2 p. add one more time to 1 item = 99 p. 

After 42 cm = 128 p. from the set series to close on both sides for the armhole first 1 time for 4 points, then in every 2-rd river. 2 times on 2 points and 5 times on 1 item = 73 p.

After 6.5 cm = 20 r. from the beginning of the formation of the armhole, close the middle loop for the V-notch and first finish the left side. 

For the bevel cut cut (see Decorative Decrements) from the inner edge in each 2-nd r. 19 times 1 st. 

After 14 cm = 42 p. from the beginning of the bevel, close the remaining 17 st of the shoulder.

LEFT BACK
Dial 64 points and, starting with the rel. row (= 1-st row), knit shortened rows: chrome., 1 person. (= last loop of the main pattern after the 2nd arrow), turn, double loop, faces. a series according to the pattern of knotting through. 

Continue to work in shorter rows, while in each of them. row 26 times 2 pcs more and distribute the hinges from left to right according to the pattern. 

Then knit in shorter rows and in each of them. row 10 times per 1 pt more according to the pattern = 64 p. After 25 cm = 76 p. from the set of rows from the right edge to knit straight. 

Simultaneously with the left edge in the 11th r. from the set number to reduce (see Decorative adjustments) for the bevel first 1 time 1 st, then in each 6th p. 21 more times in 1 item = 42 p.

After 50 cm = 150 r. from the typing series from the left edge, reduce for a bevel 1 time 1 st, then in each 4th r. another 7 times 1 p. = 34 p. 

Now for the armhole close off the left edge in every 2-rd river. 2 times 3 p. And 1 time 2 p., Then reduce (see Decorative Decrements) in each 4th p. 9 times in 1 p. = 17 p. 

At the same time, after 50 cm = 150 r. from the set of rows (measure on the right side), close for the shoulder chamfer from the right edge 1 time 3 points and in each 2 nd r. 4 times 3 points and 1 time 2 points.

RIGHT SIDE OF BACKREST
Knit symmetrically to the left.

SLEEVES
Collect 50 items and knit 7 cm = 20 p. eraser, while in the last izn. add 51 pips. 

Work continue with the main pattern, distributing the loops as follows: chrome., repeat 4 times from 12 points, 4 steps after the 2nd arrow, chrome. 

After 4 cm = 12 p. from the rubber band, add on both sides for the bevels first 1 time in 1 pt, then in each 12th p. 8 more times in 1 pt = 69 p. 

After 38 cm = 114 p. from the rubber band, close on both sides for the pellet first once in 2 pts, then in each 2 rd p. 1 time for 2 points, 11 times 1 pt, 3 times 2 pts and 2 times 3 pips. 

After 12 cm = 36 p. from the beginning of the formation of the pellet, close the remaining 15 loops in one row.

ASSEMBLY
Carry out shoulder and side seams, while crossing the back portions, precisely aligning the marks a and e. 

Starting from the mark c, tie a crochet 1 p. "Crochet step" (item b / n knit from left to right), first the upper edge of the right side of the back, then the cutout is passed and then the upper edge of the left side of the back. At the same time on the backrest at a distance of 18 cm from the shoulder seam when strapping, perform one hinged loop from the intersection. 

Next, starting from the mark b, similarly tie the lower edge of the right side of the back first, then the lower edge of the transfer and then the lower edge of the left side of the back.

Crochet from art. b / n 2 strings 25 cm long, the ends sewn to the back at a distance of 8 cm from the shoulder seam, then cross the cords, the ends pass through the hanging loops, cross the cords again and sew the ends 8 cm below the cross. 

Stitch the sleeves. Sew up sleeves. 







Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments