Click For Crochet Abbreviations List
DIMENSIONS 36/38 (40 / 42-44 / 46- 48/50 )
YOU NEED yarn 1 (100% wool; 162 m / z 50) - 250 (250-300-300) g of camel hair color;
Hand-dyed yarn 2 (70% mohair, 30% silk; 450 m / 50 g) - 50 (50-50-50) g in caramel tones; Knitting needles number 3.5 and 4; hook number 3.5.
PATTERNS AND
SCHEMES Openwork PATTERN
Knit the following scheme. In width, repeat rapport = 6 points, in height - from the 1st to the 4th row.
PEARL PATTERN
1st row: alternately 1 persons., 1 out.
2nd and 4th rows: knit loops according to the pattern.
3rd row: alternately 1 out., 1 persons.
In height, these rows are repeated.
KNITTING DENSITY
22 p. X 29 p. = 10 x 10 cm, knitted with pearl pattern with needles No. 3.5 with yarn 1;
20 p. X 24 p. = 10 x 10 cm, connected with an openwork pattern with needles No. 4 yarn 2.
PERFORMANCE OF THE
BACK
The needles No. 3.5 with yarn 1 dial 105 (113-121-135) n. And knit with a pearl pattern.
After the 34th p. reduce on both sides for fitting first, 1 p., then in each 6th p. 4 more times for 1 p.
Through 78 p. From the dial-up row, add on both sides, first 1 times in 1 p., then in each 6th p.
After 36 cm = 104 p. from the dial-up row, turn down on both sides for armholes in each 2nd p. 1 time for 3 p., 1 time for 2 p. And 2 times for 1 p. = 91 (99-107-121) p.
Through 18.5 (19.5-21-22) cm = 54 (56 60-64) p. from the beginning of the armhole to close for the neck average 35 (37-41-49) p. and both sides finish separately.
For rounding the neck, close it from the inner edge at the beginning of the row 1 time 2 points and 1 time 1 point.
Through 8 p. from the beginning of the neck all 25 (28-30-33) p. close.
The second side finish symmetrically.
BEFORE
Knit, like a back, but the average 25 (27-31-39) for the neckline close after 15 (16-17-18,5) cm = 44 (46-50-54) p. from the beginning of the armhole and both sides finish separately.
To round the neck, close it from the inner edge at the beginning of the row 1 time 3 p., 1 time 2 p. And 3 times 1 p.
Through 18 p. from the beginning of the neck close the remaining 25 (28-30-33) p. shoulder.
The second side finish symmetrically.
SLEEVES
In needles No. 4 with yarn 2, dial 58 (64-70-76) n. And 1st p. (= izn. row) to knit the purl. Work to continue the openwork pattern.
After 50 (48.5-47.5-46) cm = 120 (116-114-110) p. close on both sides for okat in each 2nd p. 3 (0-1-2) times 3 points and 2 (5-5-5) times 4 points.
After 10 (10-12-12) p. from the beginning of the okat, freely close the remaining 24 loops.
ASSEMBLY
Run shoulder seams. To sew, slightly prisoshivaya on okat, sleeves. Run the seams of the sleeves and side seams.
Crochet the edge of the neckline with yarn 2 in “stride step” (= 1 r. Art. B / n, made from left to right), starting from the left shoulder seam.