Helena

The openwork dress is made from bulk cotton yarn

Click For Crochet Abbreviations List

Dimensions: 36/38 (44/46), 

you will need: 1000 (1100) g of vanilla Camie yarn (100% hlop¬ka, 30 m / 50 g); straight and 100 cm long circular needles number 10; circular needles 80 cm long number 4.5 and number 5.5. 

Openwork pattern, circular rows: the number of loops is a multiple of 11. Knit according to scheme 1, on which only odd circular rows are shown, in even circular rows all the loops are knit according to a pattern, nakida knit faces. Repeat rapport and from the 1st to the 8th circular p.

Openwork pattern, straight and reverse rows: the number of loops is a multiple of 11 2 chrome. Knit under the scheme 1, which shows only persons. r., in izn. R. all the loops knit on the pattern, knit knit izn. Repeat between chrome. rapport and from the 1st to the 8th p. 

Wavy pattern, circular rows: the number of loops is a multiple of 11. Knit according to scheme 2, on which only odd circular rows are shown, in even circular rows all the loops and nakida knit faces. Repeat rapport. Connect 3 times from the 1st to the 4th circular p., Finish with the 1st and 2nd circular p. = 14 circular p. 

Wavy pattern, straight and reverse rows: the number of loops is a multiple of 11 2 chrome. Knit under the scheme 2, which shows only persons. r., in izn. R. all loops and nakida knit izn. Repeat between chrome. rapport Link 3 times from 1st to 4th p., Finish 1st and 2nd p. = 14 p.

Sequence of alternation of patterns A: * 24 circular p. tracery pattern, 14 circular p. wavy pattern, repeat from * 1 more time = 76 circular p. 

The sequence of alternating patterns in: 14 p. wavy pattern, 24 (32) p. openwork pattern = 38 (46) p. 

The density of knitting, the sequence A and B, the needles number 10: 10 p. And 14.5 circular p. / P. = 10 x 10 cm. 

Attention! Before armholes in front and back fit in circular rows, then the parts finish separately.

Before and back: on the circular needles number 10 dial a cruciform dial 88 (110) p., Conclude the work in a circle and instead of belonging to the cruciform dial wear. R. tie 1 circular r. individuals. Mark the beginning of the circle row = actually the right side line. Then knit in sequence A. Through 52.5 cm = 76 circular p. from the typesetting edge, divide the work for armholes and first continue to knit in the first 44 (55) sections with a straight and inverse rows with an openwork pattern on the back, at the same time in the 1st p. add on both sides of the transverse thread for chrome. 1 cross p. = 46 (57) p. Through 16.5 cm = 24 p. (22 cm = 32 p.) From the separation to stretch on both sides through chrome. next or, respectively, the previous loop and postpone the remaining 44 (55) p. Link to the remaining 44 (55) p. before the same.

Sleeves: on the needles No. 10, dial with a cross-shaped dialing 35 (46) section and after the wear belonging to the cruciform dialing. R. start to knit in sequence B. After 26 cm = 38 p. (31.5 cm = 46 p.) From the dial edge to stretch on both sides through the chrome. following or previous loop and postpone the remaining 33 (44) p.

Assembly: on circular needles No. 5.5, transfer the set back loops of the back, 1st sleeve, front, 2nd sleeve and tie in all 154 (198) sections in circular rows as follows the notch bar. 1st circular p.: Persons. p., while knit 14 (18) times 2 life. the last row of openwork patterns together; The 1st subtraction is performed on top of the beginning of a circular row = 140 (180) p. 2nd circular p.: Knit loops according to the pattern. 3rd circular p.: Persons. p., while knitting 14. (18) times over the previous decreases of 3 p. together with a broach (= remove 1 p. as a person., knit 2 p. together with a person. and stretch the resulting loop through the removed one) = 112 (144) p .4th Circular: all loops knit faces. For size 36/38, switch to circular needles No. 4.5 and tie the 3rd and 4th circular rivers one more time, then close the remaining 84 p. For size 44/46, tie 1 more times the 3rd and 4th circular p. = 108 point, then move to the circular needles No. 4.5 and tie up 1 circular p. persons., while performing 18 times over the previous reductions 1 broach (= see the legend). On the remaining 90 points bind another 1 circular p. individuals. and all loops close faces. Plank height: 5 cm = 6 circular r. (6 cm = 8 circular p.). Run raglan seams and remaining sleeve seams.














Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments