Click For Crochet Abbreviations List
Dimensions
38/40 (46/48 in)
You will need to
Yarn (100% cotton, 75 m/50 g)-700 (800) G lilac; Spokes № 5; Circular spokes № 4.5; 6 Lilac buttons (size 23).
Patterns and diagrams
Purl surface
Facial rows-purls loops, purls rows-facial loops.
Gum
Even pure loops.
Facial rows: The crown, alternately 1 obverse, 1 purl, and the crown.
Purls rows: Tie loops on the figure.
Main pattern
Number of Loops multiple 6 + 2 + 2 Kromovyi = Knit SOGL. Schema. On it are given facial rows and 1 seamy row. In the unquoted purl rows, all loops and capes tie purl. To Start with 1 crown and loops before rapport, the rapport is constantly repeated, to finish loops after rapport and 1 crown. Execute 3 times 1 – 14th Series = 42 Series, then perform 1 times 43 – 48th series. Constantly repeating these 48 series.
Underlined Ubcaps
Left edge = Both the last loops before cutting the front.
Right margin = edge, 2 loops touch together the front with a tilt to the Left (= 1 loop to remove as a face, 1 obverse, then stretch it through the removed loop).
Density of Knitting
16.5 22.5 p. = 10 x 10 cm.
Doing the work
Back
Dial on the Spokes 82 (94) loops cross-shaped set and for the strap to tie 9 cm = 20 rows of rubber band and two rows of reverse stitch.
Continue with the main pattern.
After 54 cm = 122 series from the strap to close all the loops, with the average 30 (34) p. form the neck, external to 26 (30) p.-Shoulders.
Left Shelf
Dial on the Spokes 40 (46) loops cross-shaped set and tie the bar as on the backrest.
Continue with the main pattern.
After 42.5 cm = 96 rows from the bar close to the neck on the left edge of 1 x 6 (8) p., then emphasized to reduce in each 2nd row 7 x 1 p. and the next 4th row 1 x 1 p. At the height of The backrest close the remaining 26 (30) shoulder.
Right Shelf
Knit the same as the left shelf, but in the mirror display.
Sleeves
To Dial on spokes for each sleeve on 44 (50) loops a cross-shaped set and to tie a lath, as on a backrest.
Continue the work of the main pattern, while in the 1st row, evenly distributed, add 8 p. = 52 (58) p.
At the Same time to add to the bevel sleeves in each 8-th row from the Lath 9 x 1 P. (In each 6th row 12 x 1 P.) Sogl. to the pattern = 70 (82) p.
After 34 cm = 76 rows from the strap close all loops.
Assembly
Perform shoulder seams.
For a lath to dial on spokes on straight boards of shelves on 92 loops, on an edge of a corner at the beginning of a neck of a shelf on 2 loops, on edge of a neck of shelves and a backrest 79 (87) loops and on all 267 (275) loops, since 1 Iznanochnogo of a row, to knit as follows: Edge , 91 p. Rubber Band, with the start and finish 1 reverse, 2 purls (note these loops), 79 (87) p. Rubber Band, with this start and finish 1 reverse, 2 purls (note these loops), 91 p. Elastic band, thus start and finish 1 reverse, the edge. In all the following series of loops to tie the figure.
At the Same time to shape the form of the transverse thread in each 2nd row (= In each front row) on both sides of the 2 marked loops respectively 7 x 1 crossed loop Sogl. Elastic band.
At the Same time in the 8th row of the right shelf to perform 6 holes for the buttons as follows: 1 scale and 2 loops to touch together the front. The First button hole to execute through 3 loops from the bottom edge, the following 5 holes for buttons to perform at intervals of 16 p.
After 16 rows from the beginning of knitting planks close all loops on the figure.
Sew sleeves, carry out lateral seams and seams of sleeves. Sew the buttons.