Helena

Tunic with an open back and bolero free pattern

Click For Crochet Abbreviations List

Size: 36/38 

You will need: for a tunic 400 g of Artemis blue yarn (55% silk, 45% cotton, 145 m / 50 g); for the bolero 75 g of the blue yarn Mohair Luxe (77% royal mohair, 23% silk, 175 m / 25 g); Straight needles number 4.5 and number 5; circular needles number 4 and number 5; stocking needles number 4; hook number 3.5. 

TUNIC 

Wavy pattern: the number of loops is a multiple of 18 + 1 +2 chrome. Knit under the scheme 1, which shows individuals. and izn. R. Start with 1 chrome., Repeat rapport, finish loop after rapport and 1 chrome. Repeat from 1st to 4th p. 

Openwork pattern A: the number of loops is a multiple of 9 + 1 + 2 chrome. Knit under the scheme 2, which shows the persons. and izn. R. Start with 1 chrome., Repeat rapport, finish loop after rapport and 1 chrome. Repeat the 1st and 2nd p. 

Openwork pattern B: the number of loops is a multiple of 8 + 1 + 2 chrome. Knit as an openwork pattern A, but without the gray-colored loops.

Pattern of rhombuses: the number of loops is a multiple of 12 + 1 + 2 chrome. Knit under the scheme 3, which shows only persons. r., in izn. R. all loops and nakida knit izn. or as indicated. Start with 1 chrome, and loops before rapport, repeat rapport, end with loops after rapport and 1 chrome. Link 1 time from 1st to 24th p. 

Small pearl pattern: an even number of loops. Each row starts and ends with 1 chrome. Persons, R.: alternately 1 persons., 1 out. Iz, r .: alternately 1 izn., 1 persons. 

Gum: an even number of loops. In the faces. and izn. R. knit 1 person., 1 izn. alternately. 

Knitting density Wavy pattern: 26 p. And 31.5 p. = 10 x 10 cm; openwork patterns A and B: 22 p. and 29.5 p. = 10 x 10 cm; rhombic pattern: 21 paragraphs and 30 p. = 10 x 10 cm; pearl pattern: 21 p. and 41 p. = 10 x 10 cm

Attention! Due to the different number of loops and different knitting density, the width gradually decreases. On the pattern, this is indicated by a bevel. 

The back: on the spokes number 4.5 dial 147 p. And knit in the following sequence of patterns, with the last worn. R. add or subtract the loops evenly, as indicated:
9.5 cm = 30 p. wavy pattern, while in the last izn. R. subtract 36 p. = 111 p .; 9.5 cm = 28 p. openwork pattern A, while in the last izn. R. add 18 p. = 129 p .; 7 cm = 22 p. wavy pattern, while in the last izn. R. subtract 30 p. = 99 p .; 9.5 cm = 28 p. openwork pattern B, while in the last izn. R. add 12 p. = 111 p .; 7 cm = 22 p. wavy pattern, while in the last izn. R. subtract 24 p. = 87 p .; 8 cm = 24 p. pattern of rhombuses, with the last izn. R. subtract 1 p. = 86 p. Then knit a small pearl pattern. After 8 cm = 32 p. from the change of pattern, tie for the finishing strip on the needles No. 4 another 2 cm with an elastic band and close all the loops according to the drawing.

Before: on the spokes number 4.5, dial 147 p. And knit in a sequence of patterns, as on the back = 86 p. Then knit with a small pearl pattern. At the same time, from the change of pattern, add for side bevels on both sides in each 8th p. 4 x 1 p., Including the added loops in the pattern. At the same time through 7.5 cm = 30 p. from the change of the pattern, the work for the neckline is divided in the middle and both sides finish separately. For a bevel cut, subtract from the inside edge in each 2nd p. 8 x 1 p. And in every 4th p. 13 x 1 n. To do this, on the left side, tie both last loops to chrome, with faces., On the right side, tie both loops after chrome, with faces. At the same time after 10 cm = 42 p. from the change of the pattern, close for armholes from the outer edge of 2 s., in each 2nd p. 1 x 2, 2 x 1 p. And in each 4th p. 13 x 1 p. After 24 cm = 100 p. from the change of pattern to bind for the straps on the remaining 7 p. on each side straight another 22 cm = 90 p. Then for the cape to close on both sides 1 p., In the next 2 p. 1 x 1 p. And after the next 2 p. knit the remaining 3 pp together persons. Finish at a height of 23 cm straps = 94 p.

Assembly: tie the armholes, straps and neckline 1 p. "Rach'ogo pitch" (= Art. B / n from left to right). Run side seams. 

BOLERO 

Facial surface: persons. R. - persons. n., izn. R. - ex. n. In circular rows knit faces. 

Knitting density: 15.5 p. And 24 p. = 10 x 10 cm. 

Attention! Bolero fit entirely over the shoulders. 

Performance of work: on needles No. 5 dial 108 points and knit persons. satin stitch. Through 44 cm = 106 p. from the edge of the dial all the loops close.

Assembly: for sleeve slats, dial on the stocking knitting needles with double thread along the side edges of 57 paragraphs (= 1st — 3rd needles of 14 paragraph, 4th needle 15th paragraph), enclose in a circle and knit persons. stitch, while in the 1st circular p. evenly subtract 6 s. = 51 s. At the height of the slats 5 cm close all loops. Screw the strap in half inwards and sew. For the bottom slat dial on the circular needles No. 4 on the dial and closed edge of 216 n. And knit in circular rows of faces. satin stitch. At a height of 5 cm, go over the needles No. 5 and at a height of 10 cm, all loops are free to close the faces.








Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments