Click For Crochet Abbreviations List
Jacket
Size: 3/6/12/18/24 months
You will need: 3/3/4/5/5 skein
Ro-Blue yarn phii Soft (63 96 Wool, 27% Alpaca, 10% polyamide, 88 m/25 g),
Spokes NQ Z and N2 3.5; 6/6/6/7/7 buttons.
Elastic band 2/1: Alternately 2 persons., 1 H.
Elastic band 1/1: Alternately 1 persons., 1 H.
Facial Surface: persons, p. Persons. P., N. P.-N. P.
Density of knitting. Persons. Surface, Spokes 3.5:24 p. and 33 R. = 10 x 10 cm. Backrest: On the spokes N2 Z dial 62/68/71/77/80 of the P. and link for the plan 3.5 cm = 16 R. Rubber band 2/1, starting
and ending with the 1st P. 2 persons. Go to Spokes NQ 3.5 and knit faces. The smooth, This in the 1st p. For dimensions on Z and 6
1 p., for the size of 24 Month Add 1 p. = 61/67/71/77/ 81 P.
Through 9.5 cm = 32 R./11.5 cm = 38 R./ 13.5 cm = 44 r./14.5 cm = 48 r.! 15.5 cm = 52. From the strap for the Armi close Sides 1х3 P., then in each 2nd P.: 1x 2 p. and 2х 1 p. = 47/53/57/63/67 p.
Through 20.5 cm = 68 R./23.5 cm = 78 R./
26.5 cm = 88 R./28.5 cm = 94 r./30.5 cm =
100 p. From the strap for the bevel of the shoulders close
On both sides: 1x P/1x4 p./1x4 P./
1 x 5 p./1 x 5 p., then in each 2nd P.: 2
Each 6th p. 7 x 1 P. and in each 4th p. 4
X 1 P. = 53/57/63/67/71 p.
Through 10.5 cm = 34 R./12.5 cm = 42 R./
15.5 cm = 52 R./17.5 cm = 58 r./18.5 cm =
62 p. From the strap for the sleeve of the sleeves close
On both sides: 1x P/1x4 p./1 x 4 p./
1x4 p./1х5 P., then in each 2nd R.: 1
x H p., 3x2 p. and 2x3 p./1х3 P., Zх2 P., 1x
P. and 1x4 p./1x4 P., 1х3 p., 1x2 p., 2х
P. and 1x4 p./1x4 P., 3x3 P. and 2x4 p./1
х4p., zkhz p., 1x4 p. and 1х5 p.
After 15 cm = 48 R./17 cm = 56 R./20 cm
= 66 R./22 cm = 72 R.! 23 cm = 76 R. From
Planks close the remaining 17 p.
Neck strap: On the spokes of the Gsy? C-
Take 67/71/77/81/85 p., tie 2 cm =
8 p. Rubber band 1/1, starting and ending
1st P. With 2 persons., 1 p. Persons. P. by persons. Side
and a few p. Gladnoy contrasting thread.
To iron out these p. to assemble them
To dissolve to the p. of the working thread.
h4p./1х4p. and 1х5 1x5 p. and
1х6 p./2х6p.
At the same time to cut the neck
Cover the average 7/9/9/11/11 p. and knit
Separately, closing the edges of the
Cut through 2 p.: 1x 9 p./1х9 P./1 x 10 p./
1x 10 p./1x 11 P.
Right shelf: On the spokes N2 Z dial
30/33/33/36/39 p. and tie for strap
3.5 cm = 16 R. Rubber Band 2/1 Starting 1st
P. C persons. and ending with 2 persons. Go
On the spokes NQ 3.5 and knit faces. The smooth,
This in the 1st p. For sizes on Z and 6 months.
Reduce 1 P., for sizes on 12 and 18 months.
Add 1 P. = 29/32/34/37/39 p.
Through 9.5 cm = 32 p.! 11.5 cm = 38 R.!
13.5 cm = 44 r./14.5 cm = 48 r.! 15.5 cm =
52. From the strap close to the
The first side of the 1x Z p., then in each 2nd
P.: 1x2 P. and 1 P. = 22/25/27/30/32, 5 p.
Through 17.5 cm = 58 p.! 20.5 cm = 68 R.!
22.5 cm = 74 R.! 24.5 cm = 80 R./26.5 cm
= 88 P. From the bar close with the right
For the neck cut 1 x 4 p., then in the
Each 2nd R.: 1х3 p., 1x2 p. and 2x1 p./1
HSN., 2х2p. i1х1p./2хz p., 1x2 p. and 1
X 1 P./2хz P., 1x2 p. and 2x1 p./2хz P., 2
x 2 p. and 1x1 p.
Through 20.5 cm = 68 R./23.5 cm = 78 R./
26.5 cm = 88 R./28.5 cm = 94 r./30.5 cm =
100 p. From the strap close for shoulder bevel
On the left side: 1x W P/1x 4 p./1x 4 p./
1х5 p./1x 5 p., then in each 2nd P.: 2
P./2х5 P./1х5p. and
1х6p./2х6p.
Left shelf: knit symmetrically.
Sleeves: On the spokes of Gar Z dial
41/44/44747/50 of the P. and link for the plan
3.5 cm = 16 R. Rubber band 2/1, starting
and ending with the 1st P. with 2 persons. Go to
Spokes NQ 3.5 and knit faces. The smooth,
This in 1st p. For sizes on z and 24 months.
Reduce 1 p., for the size of 12 months. When
DD 1 P. = 41/43/45/47/49 p.
For the bevel sleeves to add to both hundred-
Ron: In every 6th p. H x 1 P. and in each
4th R. 3x1 p./in each 6th p. 5х1 p. and in
Every 4th p. 2 x 1 P.! In every 6th p. 6
X 1 P. and in each 4th p. 3х 1 P./In each
6th p. 7x 1 P. and in each 4th p. z x 1 p./In
Each 6th p. 7 x 1 P. and in each 4th p. 4
X 1 P. = 53/57/63/67/71 p.
Through 10.5 cm = 34 R./12.5 cm = 42 R./
15.5 cm = 52 R./17.5 cm = 58 r./18.5 cm =
62 p. From the strap for the sleeve of the sleeves close
On both sides: 1x P/1x4 p./1 x 4 p./
1x4 p./1х5 P., then in each 2nd R.: 1
x H p., 3x2 p. and 2x3 p./1х3 P., Zх2 P., 1x
P. and 1x4 p./1x4 P., 1х3 p., 1x2 p., 2х
P. and 1x4 p./1x4 P., 3x3 P. and 2x4 p./1
х4p., zkhz p., 1x4 p. and 1х5 p.
After 15 cm = 48 R./17 cm = 56 R./20 cm
= 66 R./22 cm = 72 R.! 23 cm = 76 R. From
Planks close the remaining 17 p.
Neck strap: On the spokes of the Gsy? C-
Take 67/71/77/81/85 p., tie 2 cm =
8 p. Rubber band 1/1, starting and ending
1st P. With 2 persons., 1 p. Persons. P. by persons. Side
and a few p. Gladnoy contrasting thread.
To iron out these p. to assemble them
To dissolve to the p. of the working thread.
Strap for fastening: on spokes NQ Z on-
Take 9 p. and knit 23 cm = 72 R./26 cm
= 82 R./28 cm = 88 R./Zo cm = 94 R./32
CM = 100 Rubber Band 1/1, starting and
The 1st P. With 2 faces., then all the loops
Close. The second bar to tie the same,
At the same time perform on it on the 5th loop from
Edge 6/6/6/7/7 Vertical Holes
For buttons, height Z r.: 1-St Hole-
5 p. From the lower edge, Oselnier
At intervals of 9/11/12/10/12 p.
Assembly: Perform shoulder, lateral
Seams and seams of sleeves. Let's get the sleeves.
The open loops of the neck strap are
Kspit on the faces. Side of the work to the
Neck cut. Sew Straps for
Fastening. Loop Buttons and
Sew the buttons.