Annie

Winter Sweater Free Pattern

Click For Crochet Abbreviations List

Sweater Size: 38-40/42-44/46-48
You will need: Yarn Lanas stop "YORK MERINO" (100% Wool, 50 g/125 m): Color № 702:15/16/17 skein. Spokes № 6.
Twisted Elastic band 1/1 (each p. Proshtie crossed).
Braids and Rhompods: see Diagrams 1, 2, 3.
Persons. Surface: * 1 p. Persons. P., 1 P. izn. P. *
Double Thread Knitting 
Backrest: Dial 79/85/91 p. and knit Twisted Elastic band 1/1. After 6 cm from HP, knit track. Way: 10/13/16 persons. Ch., 15 p. braids (see diagram 1), 29 p. Rhomba (see diagram 2), 12 p. braids (see diagram 1), starting with 2. P., 3 p. braids (see diagram 3), and 10/13/16 p. Persons. Surface. You will get 86/92/98 p. Through 40/42/43 cm from HP, perform for the armholes on each side in each 2 p. 1 x 4 P., 1 x 3 p., 2 x 2 p., 1 x 1 P./1 x 4 p., 1 x 3 p. , 2 x 2 p., 2 x 1 P./1 x 4 p., 1 x 3 p., 3 x 2 p., 1 x 1 p. get 62/66/70 P. Continue straight and through 58/60/62 cm from HP, run the neck, kill 12 Center, p. And on each side 1 x 3 p. , 1 x 2 p./2 x 3 p./1 x 3 p., 1 x 4 p. will be 20/21/22 p. For the shoulder and through 60/62/64 cm from HP, close all the p. At the same time.
Before: Perform the same work as for the backrest, but after 52/54/56 cm from the HP to execute the neck, kill 8 Center. N. and finish each side separately. Continue, diminishing in each 2 p. 7 x 1 P./8 x 1 P./9 x 1 P. will remain 20/21/22 p. For the shoulder and through 60/62/64 cm from HP, close all the p. At the same time. The second part is mirrored first.
Sleeve: Dial 35/39/39 p. and knit Twisted Elastic band 1/1. After 7 cm from HP, knit track. Way: 3 p. braids (see diagram 1), (2 persons. P. and 3 p. braids (see diagram 1), 29 p. Rhomba (see diagram 2), 3 p. braids (see diagram 3), (3 p. braids (see diagram 3) and 2 persons. P.). Add on each side in each 4 p. 10 x 1 P./12 x 1 P./ 12 x 1 P. Get 55/59/63 p. Knit faces. Gradually distributing the addition. After 43/45/46 cm from HP, reduce from each side in each 2 p. 1 x 3 p., 10 x 1 P., 5 x 2 p./1 x 3 p., 1 x 2 p., 11 x 1 P., 5 x 2 p./2 x 3 p. , 11 x 1 P., 5 x 2 p. will remain 9 p. and after 59/61/63 cm from the HP close all the p. At the same time.
Collar: Dial 73/75/77 p. and knit Twisted Elastic band 1/1. After 10 cm from the HP finish the job.
Sweater assembly: Lightly iron the Parts of the product. Perform shoulder seams. Sew the collar on the perimeter of the neck. Seam. Carry out seams of sleeves, sew them in a product. Lightly iron the seams with the Side.











Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments