Click For Crochet Abbreviations List
Bolero jacket
Size: 36/38
You will need: 250 g white yarn Venezia (50% mohair, 50% Polyacryl, 130 m/50 g); Straight Spokes № 4 and № 4.5; Circular Spokes № 4; Hook № 3.5.
Attention! Run stacked Edge and 1st Izn. P. On the Spokes № 4, then knit on the spokes № 4.5.
Platelka Mating: persons. and N. P. – Persons. P.
Facial surface: Faces. P. – Persons. P., N. P.-N. P.
NET pattern: Number of Loops multiple 4 + 3 + 2 chrome. Knit according to scheme 1, which contains only persons. P., in P. All loops and scum knit Start with chrome. and loops before raport, repeating rapport, finishing loops after rapport and chrome. Repeat from 1st to 4th p.
Pattern for laths: 2 p. Persons. Gladi, 8 p. Mesh pattern, 2 p. Platelki, 2 p. Persons. Gladi = 14 p.
Pattern of rhombuses: number of Loops multiple 14 + 7 + 2 chrome. Knit as a net pattern, but according to the scheme 2. Repeat 1 time from 1st to 70th P., then 1 time from 51 to 70th p.
Density of knitting. Mesh pattern and pattern of rhombuses: 16 p. and 25 p. = 10x10 sm; Pattern for laths: 14 p. = 4 sm in height.
Backrest: Dial 65 p. and connect 1. P. Facial. (This series is not considered in the future account.) Then tie the 4 cm (= 14 p.) Pattern to the planks and then knit the pattern from the rhombuses. Execute on both sides of the addition for the bevel, as indicated = 75 p. After 15 cm (= 38 p.) from the bar to perform on both sides of the decrease for armholes, as indicated = 59 p. Through 34.5 cm (= 86 R.) from the strap close for shoulder bevel on both sides 5 p. and in each 2nd P. 2 x 6 P. At the same time with the 1st decrease of the shoulder to close for the neckline of the middle 17 p. and both sides to finish separately. For rounding close from the inner edge in the next 2nd p. 1 x 4 p. through 36 cm (= 90 p.) of the strap all loops should be used.
Left shelf: Dial 69 p. and tie 1. P. Facial. Then to link 4 sm (= 14 р.) A pattern for laths, thus in the last row to close on the Left Party for a tie 35 p. = 34, 5 p. After that to knit a pattern from rhombuses, ending loops to arrows a and krom. After 1.5 cm (= 4 p.) from the lath to close for bevel cut on the left side of 1 p. and in each 6th p. 13 x 1 P. (The first 11 Ubaviv marked with a color line). On the closed edge number of the scale should correspond to number of the executed together loops and on the contrary (if it is already impossible to tie loops together, the scum do not carry out). Run on the right side of the bevel, Armi and shoulder bevel, as on the backrest. At the height of the backrest all loops should be used.
Right shelf: knit symmetrically, to close loops of faces. In 1st persons. P. After the end of the pattern for the planks. Start the pattern from the rhombuses with Chrome. and loops from Arrow B.
Sleeves: Dial 107 p. and tie 1 N. P. Facial. Then tie for the final edge of another 2 p. Platelkoj binding, Projazazat in the 2nd p. Between Chrome. 3 p. Persons together. = 37 p. Total height of the final and inlaid edges = 1 cm. Then knit the mesh cuff pattern. At the height of the net pattern of 18.5 cm (= 46 p.) to tie another 1 cm (= 2 p.) of the Platelkoj and 2 p. Persons. And then knit a pattern of rhombuses (37 p. Diagrams). For Skosov sleeves to add from a cuff on both parties in each 8-th p. 2 х 1 P., in each 6-th p. 4 x 1 P. and in each 4-th p. 5 x 1 P. = 59, 3 p., including the added loops in a pattern. Through 25.5 cm (= 64 R.) from the cuff close to the sleeve of the sleeves on both sides of the 3 p., in each 2nd p. 1 x 2 and 5 x 1 P., in each 4th p. 2 x 1 P. and in each 2nd p. 5 x 1 and 2 x 2 p. After 40 cm (= 100 p.) From the cuff close the remaining 17 p.
Assembly: Perform shoulder seams. On circular spokes dial on the edge of the right shelf 68 p., cut the neck of the backrest 28 p. And on the edge of the left shelf 68 p. and tie for the final edge on all 164 p. 1. P. Facial. In the next RV all the loops close the faces. Fit the sleeves, carry out side seams and seams of sleeves.