Click For Crochet Abbreviations List
Size: 46/48.
You will need:
700 g of Vita “HARMONY” yarn (45% wool, 55% acrylic; 110 m / 100 g) beige (6303); Knitting needles number 4.5; circular needles number 4.
Persons smooth surface: individuals. R. - persons. n., izn. R. - ex. P.
Gum 1: alternately 1 person. n., 1 out. P.
Gum 2: 2 persons alternately. n. 2 under. P.
Large pearl pattern:
1st row: 1 persons. n., 1 out. P.;
2nd row: by drawing;
3rd row: 1 out. p., 1 person. P.;
4th row: according to the picture.
Repeat from 1st to 4th p.
Pattern "braid" on 8 p .:
knit according to the scheme, which shows only individuals. R.
In izn. R. knit loops on the pattern.
Repeat from the 1st to the 10th p.
Knitting density:
pearl pattern: 15 p. x 17 p. = 10 x 10 cm;
spit pattern: 14 p. x 23 p. = 10 x 10 cm
Back:
Type 60 points and knit 19 rows with an elastic band 2, while in the last row evenly add 8 points = 68 points.
Then distribute the loops as follows: 8 persons. n., 3 out. n., 16 n. pattern "braid", 3 izn. p., 8 persons. n., 3 out. n., 16 n. pattern "braid", 3 izn. p., 8 persons. P.
Next, knit 68 rows of pattern "spit".
For expansion on both sides in each 10th row, add 4 x 1 p. = 76 p.
From the 69th row of gum knit pearl pattern.
For an armhole sleeve in the 69th row from the rubber band on both sides close on 5 p., Then in every 2nd row 3 x on 1 p. = 60 p.
For neckline in the 105th p. from the gum close the middle 28 p. and on both sides of them in each row 2 x 1 p.
In the 107th row close the remaining 14 p. Shoulder.
Before:
Knit as back, only with a deeper neckline.
For this in the 89th p. close the middle 20 points and on both sides of them in each 2nd row 3 times 2 points.
In the 107th row close the remaining 14 p. Shoulder.
Sleeves:
Dial 30 p. And knit 19 p. rubber band 1, while in the last row evenly add 8 p. = 38 p.
Next, knit a pearl pattern.
To expand the sleeve on both sides in each 6th row, add 9 x 1 p. = 56 p.
For okat sleeves in the 65th row from the gum on both sides to close on 5 p., Then in each 2 nd row 1 x 2 p., 7 x on 1 p. 2 x on 2 p., 2 x on 3 p. .
In the 93rd row close the remaining 8 p.
Assembly of pullover parts:
Run shoulder seams.
Run side seams and sleeve seams. Sleeves sew in the armhole.
On circular needles, at the neckline, raise 70 points and knit 4 rows with an elastic band 1, then 6 rows with the front satin stitch.
Source