Emma

Pullover with Contrasting Stripes Pattern

Click For Crochet Abbreviations List

Dimensions
56/62 (68/74) 80/86



You will need
Yarn (100% Wool; 160 m/50 g)-150 (150) 200 g turquoise, 50 (50) 50 g emerald; Spokes № 3.5; Short circular spokes № 3.5.



Patterns and diagrams

Facial surface
Facial Rows-facial loops, purls rows-purls loops.



Purl surface
Facial Rows-purls loops, purls rows-facial loops.



Gum
Knit alternately 1 facial, 2 purls.



Density of knitting
22 p. x 34 of the R. = 10 x 10 cm, connected by the facial smoothness.



Pattern


Work execution

Back
Dial on the Spokes 48 (58) 66 p. Emerald Thread. Between the edge tie 2.5 cm elastic band. 

Then the turquoise thread knit the facial smoothness. 

After 21 (24) 26 cm from the gum close to the neck medium 24 (24) 26 p. 

Both shoulders to end separately. At the same time in each 2nd p. Close the edge of the neck 2 x to 1 p. 

The remaining loops of the shoulder close straight through 22 (25) 27 cm from the initial row.



Before
Knit like a backrest, but with a slit and a deeper neck. 

To cut through 13 (16) 18 cm from the gum loop split in the middle and first perform the right side. For this purpose on 5 p. To knit a rubber band Emerald thread, further the basic pattern. 

Knit from individual balls and when changing colors crossed threads on the reverse side. 

For a neck to close through 6 SM from the beginning of a cut 1 x 7 (7) 8 p. and in each 2nd P. Close on edge of a neck 2 x 2 p. and 1 x 1 p. 

The remaining loops of the shoulder close directly at the height of the neck 3 cm.



Sleeves
The emerald thread to dial on the spokes for each sleeve to 32 (36) 40 loops. Between the edge-knit rubber band. 

After 6.5 cm from the beginning of the gum knit with a turquoise thread of facial smoothness. 

For bevel sleeves Add on both sides in each 10th p. 5 x 1 P. (5 x 1 P.) 6 x 1 p. 

Through 15.5 (16.5) 17.5 cm from the initial row close all the loops.



Assembly
The parts are slightly moistened, stretch according to the size specified on the pattern and allow to dry. 

Perform shoulder seams. 

On edge of a neck to dial on circular spokes an emerald thread of 56 p., not capturing thus loops of laths. Tie 1.5 cm Rubber Band, 1 front row purl, then 1.5 cm elastic band. All loops close. 

The bar of the neck to turn on the wrong side and sew. Sew the sleeves so that the middle of the sleeve coincides with the humeral seam. 

Carry out side seams and seams of sleeves. When finished, lightly steam off all the seams.


Source : https://verena.ru/vyazanie-spicami/pulover-s-kontrastnymi-plankami-4584/







Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments

Related Posts