Annie

TIED ACROSS THE TOP

Click For Crochet Abbreviations List

Dimensions: 38/40 (42) 44/46

You will need: 100 (150) 150 g of sand, natural color and white Goby yarn (65% cotton, 35% viscose, 85 m / 50 g) and 100 (100) 150 g gray Bandola yarn (78% cotton, 22% polyamide, 150 m / 50 g); hook number 4.

The main pattern: the number of typesetting multiples of 3 + 1 + 3 air. to lift Knit under the scheme 1. Each p. start with 3 or 1 rev. to lift up instead of 1st st. s / n or 1st st. b / n and with loops before rapport, repeat rapport, finish loops after rapport. Link 1 time from the 1st to the 4th p., Then repeat the 3rd + 4th p.

Attention! From the 3rd p. pattern knit art. s / n for vozd. n previous p. From the 4th p. knit art. b / n between groups of art. s / n previous p. In the instructions, the initial and final points are calculated on 1 rapport.

The sequence of alternation of bands A: 0 (0) 2 p. sand, 0 (2) 2 p. natural, 2 p. * sand, natural, gray, repeat from * another 7 times, finish 2 p. sand, 0 (2) 2 p. natural, 0 (0) 2 p. sand = just 50 (54) 58 p.

Sequence of alternation of B bands: 0 (0) 2 p. sand, 0 (2) 2 p. natural, 2 p. sand, 2 p. * sand, natural, gray, repeat from * 1 more time = total 14 (16) 18 p.

The sequence of alternation of C bands: 2 p. * gray, natural, sand, repeat from * 3 more times, finish 0 (2) 2 p. natural and 0 (0) 2 p. sand = a total of 24 (26) 28 p.

Central pattern: knit as the main pattern, but according to scheme 2 on the last p. the main pattern, while in the 1st p. run between chrome. Art. from / n to 3 tbsp. s / n in 1 arch. Link 1 time from the 1st to the 4th p., Then 3 times the 3rd + 4th p., Finish the 11th + 12th p.

Pattern for slats: the number of initial points is a multiple of 3. Knit with circular p. under the scheme 3. Each circular river. start with 1 or 3 rev. n. instead of 1 st. b / n or 1st st. With / N and with loops before rapport, repeat rapport, finish loops before starting a circular p. and 1 con. Art. or 1 tbsp. b / n in the 1st or 3rd air. n beginning. Link 1 time from the 1st to the 6th circular river, then 2 times the 5th + 6th circular river, with the beginning of the circular river. each time it is shifted 1/2 rapport to the right, finish with the 3rd circular p. = total 11 circular p.

Knitting density The main and central pattern (measured in a slightly stretched state in height): 14.5 dialed sets and 10.5 p. = 10 x 10 cm; pattern for slats: 11 circular r. = 8.5 cm

Attention! The back and front knit across, each time to start with the actual right side seam, tie the bar later. Arrows on the pattern = knitting direction.

Back: sand (natural color) sand thread to tie a chain of 73 (79) 85 vozd. Clause + 1 rev. n rise and knit the main pattern in the sequence A = 24 (26) 28 rapports. Finish work after 48 cm = 50 p. (51.5 cm = 54 p.) 55 cm = 58 p. from the dial edge.

Before: sand (natural color) sand thread to tie a chain of 73 (79) 85 vozd. Clause + 1 rev. of lifting and knitting with the main pattern in the sequence B = 24 (26) 28 rapports. Through 13.5 cm = 14 p. (15.5 cm = 16 p.) 17 cm = 18 p. From the typesetting edge, start knitting with white thread with a central pattern. At the height of the central pattern 11.5 cm = 12 p. to tie up for the asymmetric splines of the neckline + slats of the 12th p. also over the left side edge of the central pattern (= the top edge of the neckline), here perform 7 arches, finish 1 tbsp. b / n in 1st vozd. to lift the 1st p. central pattern, immediately turn from 3 air. p. and tie for a slat in 7 arches of the lateral edge, as well as in the next 11 arches of the edge of the slots on the pattern of 3 tbsp. s / n, finish 1 connection Art. in the next article b / n Work to turn.

Attach the gray thread to the same article. b / n from the front side of the work, for virtually the left bevel of the neckline to tie a chain of 6 vozd. n., turn with 3 vozd. n and, starting with the next out. p., continue to knit the main pattern in the sequence C, and at the same time, first include this chain of 6. n. in the pattern as follows: link 3 tbsp. s / n in the 4th rev. n. from the hook, skip 2 type-setting n, link 3 tbsp. s / n in the next composing air. p., skip 2 vozd. p., then continue the main pattern from the 3rd p. schemes on the remaining 13th (15th) 17th arch and, respectively, the rapport of the central pattern.

For further bevel cut additionally bind at the end of each of the following persons. R. 3 x 6 and 1 x 9 up. n, including each time next izn. R. these airs n. in the main pattern, as described = 24 (26) 28 rapports. Bevel height = 7.5 cm = 8 p. Finish work at the height of the sequence C 23 cm = 24 p. (24.5 cm = 26 p.) 26.5 cm = 28 p. or, respectively, after 48 cm = 50 p. (51.5 cm = 54 p.) 55 cm = 58 p. from the dial edge.

Assembly: perform actually left shoulder seam 15.5 cm = 16 p. (17 cm = 18 p.) 19 cm = 20 p., Right shoulder seam 13.5 cm = 14 p. (15.5 cm = 16 p.) 17 cm = 18 p. Run the side seams at 30.5 (32.5) 34.5 cm from the bottom edge, the top 20 (22) 24 cm remain open for armholes.

For the strap, attach a white thread to one side seam and tie the bottom edge with a pattern for the slats, in the 1st circular p. perform a total of 126 (138) 150 Art. b / n = 42 (46) 50 rapports. Finish work at a height of 8.5 cm = 11 circular p. For the neckline notch, attach a gray thread to the actually right shoulder seam, tie the neckline of the backrest along with the left bevel of the neckline st. s / n, at the same time * carry out 3 tbsp. s / n in 1 separate chrome. Art. s / n the main pattern, the next chrome. Art. s / n skip, repeat from *, on bevel cut knit 3 tbsp. s / n in the open air. n additionally related vozd. n., finish 1 connection Art. to the end point of the white notch plate. When worn, unscrew the top edge of the central pattern outwards.

The scheme of knitting, pattern and legend:








Source : http://vovkyse.ru/post431696148/







Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments