Pattern knitting openwork pattern
Decorative decrements: From the right edge = chrome., 2 points. Knit together the front one with an inclination to the left (= 1 point. Remove, as in the case of face knitting, tie the next loop of the front one, then stretch the removed loop through the knitted one).
From the right edge = 2 n. Knit together the front, chrome.
Knitting density: 16.5 p. X 23 p. = 10 x 10 cm, connected by an openwork pattern.
Completing of the work:
Back: Dial 71 (83–95–107) n. And knit with an openwork pattern, starting with wear. row.
After 20 cm = 47 p. from the dial-up row, first close on both sides for the armholes 1 time in 2 points, then subtract (see Decorative additions) in each 2nd p. 5 times 1 p., In each 4th p. 3 times 1 p. And in every 6th p. 3 times for 1 p. = 45 (57–69–81) p.
When executing the openwork pattern, make sure that the number of nakida and knitted loops in external rapport was the same and the middle loop (= double arrow in the diagram) corresponded to the middle of the part.
After 15 (17–19–21) cm = 34 (40–44–48) p. from the beginning of the formation, close the armholes for the neckline of the middle 15 points and first finish the left side.
For rounding the neck close from the inside edge in each 2nd p. 1 time 3 p., 1 time 2 p. And 1 time 1 p. = 8 (14–20–26) p.
Through 4.5 cm = 10 p. from the beginning of the neck formation, close the remaining 9 (15–21–27) section of the shoulder.
The second side finish symmetrically.
Before: Knit like a back, but for a deeper neck, the average 15 points. Close after 11.5 (13.5–15.5–17.5) cm = 26 (32–36–40) p. from the beginning of the formation of the armhole and first finish the left side.
For rounding the neck close from the inside edge in each 2nd p. 1 time 3 p., 1 time 2 p. And 1 time 1 p. = 9 (15–21–27) p.
After 8 cm = 18 p. from the beginning of the neck formation, close the remaining 9 (15–21–27) section of the shoulder.
Assembly: Run shoulder seams.
Crochet the neck in a circle 1 p. Art. b / n and "pitch step" (= 1 p. Art. b / n, performed from left to right).
Run side seams.
Arms tie the same as 1 p. Art. b / n and "stride step". To each nakidu 1st p. attach fringe (= 6 threads 22 cm long attach at the fold, the length of the fringe in the finished form should be 10 cm).