Click For Crochet Abbreviations List
At the age of 3.5-4 years (growth of about 100 cm)
Materials: 650 g Candy from Vita, spokes № 3.5.
Patterns: See. Below.
Pearl mating. 1 p.-1 persons. P., 1 P.
2 p. – 1 persons. P., 1, N. P.
Density of faces. Gladi: 25 p. x 37 R. = 10 x 10 cm.
Shelves and a backrest knit a uniform cloth.
Dial 334 p., Projazit 8 rows of a binding (all P. izn. In all P.) Next knit trail. Way: 7 persons. N., 1 N. P., 6 persons. N. (Fantasy harness), 1 N. P., 2 p. beads. Knitting, 1 H. N., 9 persons. P. (large spit), 1 N. P., 2 p. beads. Mating, 37 p. According to the scheme of the central Aral Sea, 2 p. beads. Knitting, 1 N. P., 9 persons. (large braid), 1 N. P., 2 p. beads. Knitting, 1 H. P., 14 p. Under the scheme "Diamond", 1 N. P., 5 p. beads. Knitting, 1 H. P., 6 persons. P. (harness), 1 H. P., 8 p. beads. Knitting, 1 H. P., 6 persons. P. (harness), 1 H. P., 8 p. beads. Knitting, 1 H. P., 6 persons. N. (spit), 1 N. P., 8 p. beads. Knitting, 1 H. P., 6 persons. N. (Fantasy harness), 1 N. P., 8 p. beads. Knitting, 1 H. P., 14 p. Under the scheme "Diamond", 1 N. P., 8 p. beads. Knitting, 1 H. P., 6 persons. N. (Fantasy harness), 1 N. P., 8 p. beads. Knitting, 1 H. P., 6 persons. N. (spit), 1 N. P., 8 p. beads. Knitting, 1 H. P., 6 persons. P. (harness), 1 H. P., 8 p. beads. Knitting, 1 H. P., 6 persons. P. (harness), 1 H. P., 4 p. beads. Knitting, 1 H. P., 14 p. Under the scheme "Diamond", 1 N. P., 2 p. beads. Knitting, 1 N. P., 9 persons. (large braid), 1 N. P., 7 p. beads. Knitting, 1 H. P., 26 persons. (persons. Surface), 1 H. P., 5 p. beads. Knitting, 1 N. P., 6 persons. (spit), 1 H. P., 6 persons.
Further knit according to schemes. After 20 p. Sites of pearl mating, which contain more than 2 p., cut from each side on 1 p. Repeat every 14 p., bringing all the sites of pearl mating to 2 p. (The last 2 plots, framing the persons. Surface, bring up to 3 p.) at the same time on the section of the facial surface Cut by 1 p. On each side through 30 p., further reduce through every 18 p. to the yoke.
After 28 cm from the beginning of the work to formalize the trail. Way: Close 4 p. Between the first two harnesses, then close 4 p. Between the second two harnesses. Knit each shelf and backrest separately.
Upper part of Backrest:
Continue knitting on the pattern, closing on each side in each second row 2 times 2 p., 2 times 1 p. At an altitude of 44 cm from the beginning for the design of the neck close the central 22 p. Next on each side to close in each second row 2 times 1 p. Knit Straight , at an altitude of 46 cm from the beginning close the remaining loops.
The upper part of the right shelf:
Continue knitting on a pattern, closing on each side in each second row 2 times on 2 p., 2 times on 1 p. After 4 rows from the beginning of the Armi begin to design the yoke of the trail. Way: 7 persons. N., 1 N. The following 71 of the p. should be reduced by by 2 and 3 p., bringing their number to 27 p. Other p. Knit on the pattern. Then the yoke is knitted beads. Viscous. After 10 p. From the beginning of the yoke make 2 holes for buttons at a distance of 6.5 cm (15 p.) from each other. After 24 p. From the beginning of the yoke to repeat the holes. Even after 6 p. To formalize the neck, closing at the beginning of the P. 27п., then in each 2nd p. Alternately 3 p, 2 p., 2 P., 1 P., knit directly and at an altitude of 46 cm from the beginning of mating close the remaining n.
The upper part of the left shelf:
Knit is similar to the right shelf, but without making holes for buttons. Plot under the yoke (42 p.) as to bring to 27 p.
Sleeves:
Dial 87 p., Projazit 8 rows of a binding (all P. izn. In all P.) Next knit trail. Way: 6 p. beads. Knitting, 1 H. P., 6 persons. N. (spit), 1 N. P., 6 p. beads. Knitting, 1 H. P., 10 p. Under the scheme "small Rhomboas", 1. P., 6 p. beads. Knitting, 1 H. N., 9 persons. N. (large spit), 1 N. P., 6 p. beads. Knitting, 1 H. P., 10 p. Under the scheme "small Rhomboas", 1. P., 6 p. beads. Knitting, 1 H. P., 6 persons. N. (spit), 1 N. P., 6 p. beads. Mating. To knit on schemes, thus through 16 р. From the beginning of schemes to cut on 1 p. On each side of plots of beads. Mating (except the first and last), repeat the reduction in 16 p. After 17 cm from the beginning of the mating to add in each 8th P. 4 times 1 p. On each side of the sleeves, projazviem their beads. Viscous.
After 27 cm from the beginning to formalize the armholes, closing on each side in each 2п p. successively 3 p., 2п., 1п., 1п., 1п. Knit 10 p. Straight. Next close on each side in each 2nd p. successively 3 p., 4п., 5п., 6п, 7 p. Close the remaining loops.
The second sleeve is similar.
Assembly:
Perform shoulder seams. Sew the sleeves and sewn them into the armholes. Sew the buttons. Sections of the obverse surface on the edges of the coat to bend on the wrong side and to sew from the underside. If you want to sew the butt.
Neck and collar Design:
On the edge of a neck to dial loops and projazit a front smooth 8 p. To bend on a wrong party and to sew up from a wrong side. On the inside of the neck raise the loops without reaching 6 cm to the edge on each side and knit the collar beads. Viscous. Through 14 rows to close on each side in each 2п p. consecutively 1 P., 2п., 3п., 4п. To raise loops with each closed rounded part of a collar and, having connected with the left loops of a collar, to knit obzakku persons. Surface. After four rows change the spokes on № 6 and one row. Back to the spokes of № 3.5 and to bring in another 4 rows of persons. Surface. Bend the harness in half along the central row and sew it from the wrong collar.
Bow.
In the waist area on the back raise 11 p. (see photo) and knit on them the tape trail. Way: 2 persons. P., 7 p. beads. Mating, 2 persons. P. Continue up to a length of about 36 cm, close. On the other hand, link a similar tape. Tie 2 ribbons with a bow and quietly fasten it with several stitches.
Central pattern
Diamond