Bertie

Knitting Summer Top for Women

Click For Crochet Abbreviations List

The lower part of this top is collected from separate motifs, made in the form of diamonds and triangles. Simple, but painstaking work.

THE SIZE
38/40

YOU WILL NEED
Yarn (40% viscose, 30% cotton, 20% linen, 10% polyamide, 125 m / 50 g) - 200 grams of platinum, and also 150 g of turquoise and beige; spokes number 4; hook number 4.

PATTERNS AND PATTERNS

RHOMBUS
Put on the needles the thread of the color indicated for the 1st row, 33 stems and knit according to. scheme 1. With the exception of the first and last purl rows, only the front rows are given in the diagram. In the unproducted purlless rows, loops are bound according to a pattern or according to the rules. instructions. 

Start with 1 purl. scheme, then perform 1 times the 1-26th rows (= a total of 27 rows), and then knit with the threads of the colors indicated for rhombuses A-F. After the 26th row, stretch the thread through the hinges and finish the work.


Diamond Diamond (9 items)
7 rows of platinum, 8 rows of beige, 12 rows of turquoise thread.

Diamond B (9 pieces)
7 rows of beige, 8 rows of platinum, 12 rows of turquoise thread.

Diamond C (10 pieces)
7 rows of turquoise, 8 rows of platinum, 12 rows of beige thread.

Diamond D (9 pieces)
7 rows of platinum, 8 rows of turquoise, 12 rows of beige thread.

Rhombus E (10 pieces)
7 rows of turquoise, 8 rows of beige, 12 rows of platinum thread.

Rhombus F (9 pieces)
7 rows of beige, 8 rows of turquoise, 12 rows of platinum thread.

UPPER TRIANGLE
Put on the needles the thread of the color indicated for the 1st row, 5 sts and knit according to. scheme 2. With the exception of the first purl series, only the front rows are given in the diagram. In the unproducted purlless rows, loops are bound according to a pattern or according to the rules. instructions. 

Start with 1 purl. scheme, then perform 1-st time 1-14 rows (= 15 rows in total), then close the loops with a thread of the appropriate color. 

Knit the threads of the colors indicated for triangles 1-6.




Triangle 1 (2 pieces)
7 rows of beige, 8 rows of turquoise thread.

Triangle 2 (2 pieces)
7 rows of platinum, 8 rows of turquoise thread.

Triangle 3 (1 piece)
7 rows of turquoise, 8 rows of platinum thread.

Triangle 4 (1 piece)
7 rows of turquoise, 8 rows of beige thread.

Triangle 5 (1 piece)
7 rows of beige, 8 rows of platinum thread.

Triangle 6 (1 piece)
7 rows of platinum, 8 rows of beige thread.

LOWER TRIANGLE
Knit as the upper triangle, but after the back of the row, perform only 1-12 rows (= 13 rows in total), then close the loops with a thread of the appropriate color. Knit the threads of the colors indicated for the triangles 7-12.

Triangle 7 (1 piece)
7 rows of turquoise, 6 rows of beige thread.

Triangle 8 (2 pieces)
7 rows of platinum, 6 rows of turquoise thread.

Triangle 9 (1 piece)
7 rows of platinum, 6 rows of beige thread.

Triangle 10 (1 piece)
7 rows of beige, 6 rows of platinum thread.

Triangle 11 (1 piece)
7 rows of turquoise, 6 rows of platinum thread.

THE SCHEME OF CONNECTING TRIANGLES AND RHOMBUSES
Run according to the scheme.




riangle 12 (2 pieces)
7 rows of beige, 6 rows of turquoise thread.

GROOMING
Face and purl rows - facial loops.

DENSITY OF KNITTING
1 rhombus = width 11.5 cm and height 11.5 cm; 
19 p. X 35 r. = 10 x 10 cm, is connected by paid knitting.

PATTERN




COMPLETING OF THE WORK

BOTTOM PART
Perform a total of 56 diamonds of the specified color combinations. 

The diamonds are joined according to. a schematic drawing from the wrong side with a platinum thread with the help of a connector. Combining the same icons in the figure. Ensure that the diamonds are located in the direction of knitting up. 

Run on the 8 upper and lower triangles of the specified color combinations. Place the lower triangles in the direction of the knitting up, the upper triangles - the direction of knitting down and attach them to the hook according to. schematic drawing. 

Mark the side edges in accordance with. a schematic drawing (= arrows above the picture).

UPPER BACK
On the upper edge of the lower part of the back between the marks of a turquoise thread, dial 87 knitting needles and knit with garter stitch. 

After 1 cm = 4 rows from the set of loops, close for the armhole on both sides 1 x 4 p., Then in each 2nd row, close 2 x 2 p and 2 x 1 p = 67 p. 

After 16 cm = 56 rows from the set of loops to close for the middle of the middle 27 p. and both sides to finish separately. 

To round the inner edge, close in each 2nd row 1 x 3 p., 1 x 2 p. And 2 x 1 p. 

After 19 cm = 66 rows from the loop set, close the remaining 13 pips of the shoulders.

THE UPPER PART OF THE TRANSMISSION
On the upper edge of the lower part of the transmission, also typing on the spokes with a turquoise thread of 87 p. And knit with garter stitching, but for a deeper throat, after 8 cm = 28 rows from the set of loops, close the middle 17 pts, then close in each 2nd row 1 x 3 points, 1 x 2 points and 7 x 1 n.

ASSEMBLY
Carry out shoulder and side seams of the upper part. The edges of the neck and the armhole are tied with a turquoise thread 1 round the st. б / н and "рачьего a step" (= item б / н to execute in a direction from left to right). 

Photo: magazine "Sabrina" №7 / 2018

Source : https://verena.ru/vyazanie-spicami/top-s-rombami-13252/







Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments