Click For Crochet Abbreviations List
You will need: 550 (600, 650) g yarn SAMINA (75% wool, 25% nylon, 50 g / 150 m) № 04344 coral color. Spokes Nos. 3,5, 4 and 4,5. Circular knitting needles № 3,5. Remember the spin. Detachable zipper length of 30 cm per tone.
Size: 44 (50; 54).
Patterns and types of loops:
Res. 2x2, persons. Ch., out. Ch.
Striped pattern: 3 r. persons. Ch., 3 r. out. Ch.
Twisted Pattern: Elm. According to the scheme, where only people are shown. р .: изн. R. elm. according to the figure. Elm. 1-2-rd river. with a mushroom., then a rept. 3-14-th р.
Arr. п .: лв. with a spoke to grasp the broach between the 2 spokes in front and under it, to tie the received additional n. persons. reception for the back wall.
The density of knitting: 10 x 10 cm = 23 p. X 36 r. striped pattern with knitting needles No. 4,5. 8 cm = 30 p. Of twisted pattern with knitting needles No. 4,5.
Back: on the spokes number 4 dial 126 (142; 158) n. Start. with no. R. and elm. first point after chrome. etc., as individuals., Further elm. 3 cm cut. 2 x 2. In the room. R. Res. arr. 1 point from the broach from each edge (after and before the edge) = 128 (144, 160) n. Go to spokes No. 4,5 and Prod. track. way: chrome. n., 50 (58, 66), with a striped pattern, 26 p. (30 p., after arriving in the 1 st river) with a twisted pattern, 50 (58; 66) with a striped pattern, chrome. n = 132 (148; 164) n. At the height of the backrest 18 (16; 12) cm, perform the job. from the sides: close 1 point at the beginning. track. 2 r. * Elm. 16 (12; 10) p. without a job, close 1 item in the beginning. track. 2 r. *, rep. from * to * 5 (7, 10) times = 118 (130, 140) n. To form an armhole at the height of the backrest 60 (58; 56) cm, close 2 (3; 4) points at the beginning. track. 2 rubles, 1 item in the beginning. track. 6 (8; 10) p. = 108 (116, 122) n. To form a cutout of the neck and shoulders at the height of the backrest 78 cm elm. up to 22 (26; 26) central points, the thread from the other skein close 22 (26; 26) central points, elm. to end. Elm. both sides. at the same time, close 2 times on 6 points each edge of the neckline, then 4 sts, 2 n. Simultaneously with the removal of the first p. cut neckline to form the shoulders of the footprint. way: close 7 (5; 8) n. of each shoulder and 4 times in 6 (7; 7) n. l., shelf: on the spokes No. 4, dial 67 (77; 85) n. R. and elm. The first two points after the edge. etc., as individuals. (2 rel., 2 rel.), Elm. 3 cm cut. 2x2. Go to spokes number 4,5 and Prod .: chrome. n., 33 (41, 49), with a striped pattern, 26 p. (30 p. after the arrival in the 1 st river) with a twisted pattern, 6 (8; 8) with a striped pattern, and chrome. n. = 71 (81; 89) n. Do the job. on the other edge, as on the back = 64 (72; 77) n. Having tied the backrest to the height, form the armholes along the right edge of the track. way: close 3 (5; 6) p., 3 (5; 5) times in 1 n. = 58 (62; 66) n. To form a neck cut at the height of the lv. shelves 72 cm close 6 (8; 8) n., 4 p., 3 p., 2 p. 2 times 1 pt. and 4 times 1 pt. up to the height of the shoulder of the backrest, we unfasten the shoulder, making ub. on the right: close 7 (5; 8) p., 2 times 6 and 9 p. (2 times 7 and 10 pts, 2 times 7 pts, 1 time 10 and 11 p.). Etc. shelf: elm. symmetrically lv. shelf.
Assembling and processing: Pile the details onto a pattern, moisten and allow them to dry. Perform shoulder seams. On the spokes number 4, dial 98 (110; 118) persons. along the edge of the armhole and elm. round. Elm. 3 cm cut. 2x2. Close all. Sew the side seams. Collar-stand: on the circular knitting needles, type on the edge of the cutout of the throat 105 (115, 115) l. and elm. persons. reception. Then the elm. 10 cm striped pattern, then 10 cm face. Ch. Close all items. Fold the collar in half. stop. and sew. Kant pr. Shelves: on the circular knitting needles 200 pcs along the edge of the shelf and the edge of the collar, elm. persons. Ch. Ext. R. elm. out. etc., then the elm. 3 r. persons. Ch. Track. r .: elm. 24 people. Ch. = 10 cm. Close 74 items under the "lightning" (30 cm), elm. persons. Ch. to end. Track. r .: elm. persons. Ch. To close n .., to collect over them 74 items and elm. persons. Ch. to end. Bind another 4 p. persons. Ch., then close all the p.
Kant lion. shelves: elm, like the edge of the shelf. Fold the edges into faces. stop. and sew. Sew a zipper.