Click For Crochet Abbreviations List
Current mood is excellent.
Sizes: 36/38 (42) 46/48
You will need: 225 (275) 325 g of Colima white yarn (80% royal mohair, 20% polyester, 100 m / 25 g); Straight needles No. 4 and No. 4,5; circular knitting needles No. 3,5 and No. 4.
Rubber, knitting needles No. 3,5 / No. 4: alternately 2 persons., 2 str.
Grooming: persons. and out. R. - persons. etc.
Face: faces. R. - persons. etc., of. R. - rel. The
pattern of holes: an odd number of loops. Persons. r .: crom., * tie 2 p. together persons., 1 cape, repeat from *, end 1 person., chrome. Ext. r .: between the crome. knit all the hinges and outfits.
Border: 3 r. garter stitch, to start with a. p., 2 p. persons. smooth, 2 p. pattern of holes, 4 p. garter stitch, 2 p. persons. smooth = 13 p.
Openwork pattern: the number of loops is a multiple of 10 + 1 +2 chrome. Knit by the scheme, which lists only the faces. p., in the no. R. knit all hinges and nacs. Start with chrome. and loops before rapport, repeat rapport, finish with loops after rapport and chrome. Repeat from the 1st to the 24th r.
Knitting density: 17.5 p. And 28 p. = 10x10 cm.
Back: Dial 83 (93) 103 p. And tie 4 cm (= 13 r.) With the border. Then knit an openwork pattern. After 36 cm = 102 r. (34 cm = 96 r.) 32 cm = 90 r. from the rim close for the armhole on both sides of 3 points and in each 2-rd river. 1 x 2 and 5 x 1 n. = 63 (73) 83 n. After 53 cm (= 148 r.) From the rim, close the middle 19 (21) 23 pips for the cutout of the neck and finish separately on both sides. For rounding, close the inner edge in each 2-rd river. 1 x 3.1 x 2 and 1 x 1 n. After 56 cm (= 158 r.) From the rim, cover the remaining 16 (20) 24 pts of the shoulder on each side.
Before: knit the same, but with a deeper neckline. To do this, through 26 cm (= 72 p.) From the rim, close the average 7 (9) 11 p., In each 2-rd river. 2 x 2 and 2 x 1 p., In each 4th p. 4x1 p. And in each 6th p. 2 x 1 st.
Hoses: 43 (53) 63 sts and tie 4 cm (= 13 r.) With the hem. Then knit an openwork pattern. Simultaneously from the rim, add hoses for the bevels on both sides in each 10th river. 10 x 1 p. (Alternately in each 10th and 12th rivers, 9 x 1 p.) In each 14th river. 7 x 1 n. = 63 (71) 77 items, including added loops in the pattern. After 38 cm (= 106 r.) From the rim, close the sleeves on both sides of the 2 (3) 3 pcs. For each 2-rd r. 1 x 2 and 6 x 1 p., In each 4th p. 2 x 1 p. And in every 2-rd p. 6 x 1 and 1 x 2 (3) 4 p. After 51.5 cm (= 144 r.) From the rim, close the remaining 23 (27) 31 p.
Assembly: perform shoulder seams. On the circular knitting needles No. 3.5, dial 180 (184) 188 sts along the neckline and knit with an elastic band so that in the middle of the transfer there are 2 rel. At the height of the collar 3 cm in front, on both sides of the middle 2 p., 1 p. And then in each 2-m circular p. another 7 x 1 in. from the transverse thread = 196 (200) 204 sts, including the added loops in the elastic band. At the height of the collar 6 cm, continue working on the circular knitting needles No. 4 and at an altitude of 13 cm, loosen all the loops freely according to the drawing. Stitch the sleeves, make side seams and seam the sleeves.