Click For Crochet Abbreviations List
DIMENSIONS 36/38 (40/42 - 44/46) 48/50
YOU NEED melange yarn (92% merino wool, cashmere wool 8%; 230 m / z 50) - 250 (250 - 300) 350 g of wine-red and 250 (250 - 300) 350 g of plum; circular needles number 3 with a length of 40 and 80 cm.
FACIAL SEE Front faces
- front loops, back rows - back loops.
In the circular rows of all loops knit facial.
PLATED VYAZKA
Facial and purl rows - facial loops.
When circular knitting knit alternately 1 row of facial, 1 row of purl.
HEATING HINGES
The first and last loops of each row to knit facial = knotted edge.
PATTERN FROM THE REMOVED LOOP The
1st row: the thread of the primary color - chrome., * 2 persons., 2 points. Remove with the thread at work, from * repeat, finish: 2 faces., Chrome.
2nd row: the main color thread - chrome., 2 w., * 2 p. Remove together with the thread before work, 2 w., From * repeat, chrome.
3rd + 4th rows: the thread of the primary color - the front surface.
5th row: thread of finishing color - chrome., * 2 points. Remove with the thread work, 2 persons., From * repeat, finish: 2 points. Remove together with the thread before work, chrome.
6th row: thread of finishing color - chrome., * 2 p. Remove together with the thread before work, 2 w., From * repeat, finish: 2 p. Remove together with the thread before work, chrome.
In height, repeat from the 1st to the 6th rows.
PATTERN "RUBCHIK"
From the 1st to the 4th p.: The thread of the primary color - the front surface.
5th + 6th p.: Thread of finishing color - shawl knit.
In height, repeat from the 1st to the 6th rows.
KNITTING DENSITY
31 p. X 38 p. = 10 x 10 cm, connected by the front surface;
32 p. X 60 p. = 10 x 10 cm, connected by a pattern of removed loops;
29 p. X 46 p. = 10 x 10 cm, connected by the “Hem” pattern.
All samples are made on the needles No. 3.
ATTENTION!
Front and back fit in the transverse direction from the left side edge as one piece. First, plum is the main color, and wine-red - finishing. In the middle of the front and in the middle of the back color swap = on the right side of the front and left side of the back the same color distribution, on the left side of the front and right side of the back also the same color distribution, but the main and finishing colors swap.
PERFORMANCE OF WORK
BEFORE AND BACK With a
wine-red thread, dial 216 p. On long circular needles and knit 1 p. facial.
In the next w. a number of knit: 167 persons., then 48 external., chrome.
Further on 48 items, to carry out a pattern from the removed loops, on the others to knit the “Hem” pattern (for both patterns: plum is the main color, wine-red is the finishing one).
After 3 (3.5 - 4) 4.5 cm = 18 (20 - 24) 26 p. add from the right edge for the armhole in every 2nd p. 6 times 1 p. = 222 p., Then additionally dial 57 (61 - 65) 73 p. = 279 (283 - 287) 295 p. And attach the pattern loops from the removed hinges.
For a humeral bevel in 14, 30 and 44th r. after additionally recruited loops, add 1 p. = 282 (286 - 290) 298 p.
through 8 (9 - 10) 11 cm = 48 (54 - 60) 66 p. from the beginning of the shoulder bevel from the right edge to close for the neck in each 2nd p. 1 time 15 p., 1 time 10 p., 1 time 5 p., 3 times 3 p., 1 time 2 p. And 3 times 1 p. = 238 (242 - 246) 254 p.
23 ( 24.5 - 26.5) 28.5 cm = 136 (148 - 160) 172 p. from the dial-up row (after the 4th p. pattern with the loops removed) the middle of the front was reached.
Now change the colors of the threads, for this 1 p. Perform as follows: on 71 (75 - 79) 87 sections after edge knitting with a plum thread on the bodice of the dress: alternately 2 faces., 2 sidelines, finish 2 faces., on the remaining 167 section skirts, knit back. Cut the thread, move the loop back to the left needle and continue from the 1st p. a pattern of filmed loops with a wine-red thread as the main color and a plum thread as a finishing.
Through 6 cm = 36 p. from the change of color for the second half of the front anterior to the right edge in every 2nd p. first add 3 times 1 p., then dial 1 time 2 p., 3 times 3 p., 1 time 5 p., 1 time 10 p. and 1 time 15 p. = 282 (286 - 290) 298 p. .
After 0.5 (1.5 - 2.5) 3.5 cm = 4 (10 - 16) 22 p. from the end of the neck formation for the humeral bevel, perform a reduction in the mirror image, as on the left shoulder = 279 (283 - 287) 295 p.
Through 8 (9 - 10) 11 cm = 48 (54 - 60) 66 р. from the beginning of the formation of the neck, in the mirror image (with respect to the left armhole), right armhole = 222 points.
Through 3 (3.5 - 4) 4.5 cm = 18 (20 - 24) 26 p. from the end of the armhole, the product is connected to the line of the 2nd side seam. Mark the line of the side seam and knit the back symmetrically to the front, while in the middle swap the main and finishing colors.
For the neck through 8 (9 - 10) 11 cm = 48 (54 - 60) 66 p. from the beginning of the shoulder bevel in each 2nd p. close 1 time 8 p., 1 time 4 p., 1 time 2 p. and 1 time 1 p., then knit straight. After 23 (24.5 - 26.5) 28.5 cm = 136 (148 - 160) 172 r. from the marked line of the side seam (= after a row with 4 rapports of the pattern of the removed loops) again change the colors in the row of the transition, as in the front.
Now plum is again the main color, and wine-red - finishing.
Through 8.5 cm = 52 p. from changing the color, start forming the neck of the left side of the back and execute it symmetrically with the right side = 282 (286 - 290) 298 p.
RIGHT SLEEVE With a plum
thread dial 68 (71 - 74) 79 p. and knit for a slat 13 p. garter viscous.
Work to continue with the front satin stitch, while in the next row uniformly add 10 (11-12) 13 s. = 78 (82 - 86) 92 s.
For bevels, add on both sides in each 6th p. 9 times 1 p. And in each 8th p. 9 more times for 1 p. (in every 6th p. 11 times for 1 p. and in every 8th p. 8 more times for 1 p. - in every 6th p. 21 times for 1 p. ) in every 4th p. 12 times 1 p. And in every 6th p. 13 times on 1 p. = 114 (120 - 128) 142 p.
For the formation of okat through 35 cm = 134 p. from the strap close on both sides in each 2nd p. 1 time for 8 p., 5 (6 - 7) 8 times for 2 p., 18 (19 - 20) 22 times for 1 p., 5 times for 2 p. And 1 (1 - 1) 2 times for 3 n. = 16 (16 - 18) 18 p. The remaining loops close in the same row.
LEFT SLEEVE
Knit, as the right, but the wine-red thread.
ASSEMBLY
Run the side seam “loop in loop” (see p. A3), while ensuring correct alignment of the patterns.
Along the edge of the neckline, dial the wine-red thread on the short circular knitting needles 143 p. And knit for bei circle 5 p. front stitch, then knit a plum thread 1 p. facial, 1 p. purl = fold and another 5 p. front, then close the loop. Bake the fold in the fold on the wrong side and sew.
Run the seams of the sleeves. Sew the sleeves.