Cathy

Pullover and vest

Click For Crochet Abbreviations List

Sizes: 36/38 (40/42) 

You will need: for a pullover 500 (550) g ​​of sand and for a vest 300 (350) g ​​of Amalfi gray-brown yarn (70% cotton, 30% polyamide, 90 m / 50 g) ; straight and circular needles number 4,5; for a vest 7 pearl buttons with a diameter of 18 mm. 

Facial smoothness: persons. R. - persons. n., izn. R.-izn. n. 

Openwork pattern: the number of loops is a multiple of 10 + 1 +2 chrome. Knit under the scheme, which shows only persons. R. In izn. R. knit and nakida knit izn. Start with 1 chrome. and loops before the rapport, then repeat the loops of the rapport, end with the loops after the rapport and 1 chrome. Repeat from the 1st to the 8th p. Make sure that the number of nakidov balances the number of knitted together or pulled (= 1 p. Remove as persons., 1 person. And stretch it through the looped) loops.

Special reductions: from the right edge: Krom., Knit 2 paragraphs together of persons .; from the left edge in front of chrome. knit 2 p. together broach. 

Knitting density Persons smooth surface: 18.5 p. and 27.5 p. = 10 x 10 cm; openwork pattern: 19 p. and 25 p. = 10 x 10 cm. 

Pullover

Back: dial 81 (100) n. And associate 1 out. R. individuals. (this p. is not taken into account in further calculations). Next, knit the faces. satin stitch. For pristalivaniya close in the 35th (39th) p. from the typesetting edge 1x1 p., then 1 x 1 p. to the next. 20th p. and 2 x 1 p. in each 10th p., performing special decreases = 73 (92) p. After that add on both sides 4x1 p. in each 10th p. = 81 (100) p. Through 46.5 cm = 128 p. from the edge of the dial close on both sides for proym 1 x 3 p., then in each 2nd p. 1 x 2 and 4 (6) x 1 p. = 63 (78) p. Through 60.5 cm = 166 p. (64 cm = 176 p.) Close the cutout for the neckline, average 23 (26) section and finish both sides separately. For rounding the neckline close with the inner edge in each 2nd p. 1 x 5.1 x 3 and 1 x 2 p. Through 63.5 cm = 174 p. (67 cm = 184 p.) From the dial edge close the remaining 10 (16) p. Shoulder.

Before: knit like a back, only with a deeper neckline. For this through 55.5 cm = 152 p. (59 cm = 162 p.) From the dial edge close the average 21 (24) n. And in each of the 2nd p. 1 x 3, 2 x 2 and 3 x 1 p., Then the next. 4th p. 1 x 1 p.

Sleeves: dial 43 (53) p. And tie 1 res. R. individuals. Then knit openwork pattern. For bevels add on both sides through 9.5 cm = 24 p. from the dial edge 1 x 1 p., then 1 (0) x 1 p. to the next. 12th p., 2 x 1 p. In each 10th p., 3 (1) x 1 p. In each 8th p. and 3 x 1 p. in every 6th p. and 0 (5) x 1 p. in every 4 r. p., including added loops to the pattern = 63 (77) p. Through 42.5 cm = 106 p. (38.5 cm = 96 p.) From the edge of the dial close on both sides for wrap the sleeves 1 x 3 n., Then in each 2nd p. 1 x 2 and 6 (7) x 1 p., In each 4th p. 2 x 1 p. And again in every 2nd p. 6 x 1 and 1 x (2) 3 p. Through 57.5 cm = 144 p. (54.5 cm = 136 p.) From the dial edge close the remaining 21 (31) p.

Assembly: perform shoulder seams. On the front neckline cut dial on the circular knitting needles 56 (59) p., On the neckline cut of the backrest 47 (50) p. = 103 (109) p., Tie 1 circle. R. from and all loops close faces. Sew on the sleeves. Run side seams and sleeve seams. 

VEST

Back: dial 83 (103) n. And associate 1 out. R. individuals. (this p. is not taken into account in further calculations). Then knit openwork pattern. For bending close on both sides in the 31st (35th) p. 1 x 1 p., Performing special reductions. Such reductions are repeated in the 41st (45th) p., 49th (the 53rd) p. and the 55th (59th) p. = 75 (95) p., Then again add 4 x 1 p. In each 10-m p. (4 x 1 p. Alternately in every 8th and 10th p.), Including added loops in the pattern = 83 (103) p. Through 41.5 cm = 104 p. from the edge of the dial close on both sides for proym 1 x 3 p., then in each 2nd p. 1 x 2 and 4 (6) x 1 n. And in each 4th p. another 2 x 1 p. = 61 (77) p. Through 58.5 cm = 146 p. (61.5 cm = 154 p.) From the dial edge close the middle 29 (33) n. And finish both sides separately. For rounding the neckline close with the inner edge in each 2nd p. 1 x 3 and 1 x 2 p. Through 61 cm = 152 p. (64 cm = 160 p.) From the edge of the dial close the remaining 11 (17) p. Shoulder.

Left shelf: dial 43 (53) p. And tie 1 out. R. individuals. Then knit openwork pattern. Tightening and armhole from the right edge to perform as for the back. Through 41.5 cm = 104 p. (44.5 cm = 112 p.) From the edge of the dial close from the left edge for the neckline cutout 1x6 (8) p., Then in each 2nd p. 1 x 3.3 x 2 and 3 x 1 p., In each 4th p. 3 x 1 p. The remaining 11 (17) p. Shoulder close at the height of the backrest. 

Right shelf: knit symmetrically and make 7 holes for buttons trace, as follows: for the 1st hole in the 7th (15th) p. From the typesetting edge, tie up 1 chrome., 1 person., 2 items. close, without knitting, and dial 2 items instead. The remaining 6 holes should be made in each 16th p.

Assembly: perform shoulder seams. On armholes dial for slats of 74 (88) p., Tie 1 w. R. individuals. and all loops close faces. Along the front edges of the shelves, dial 70 (76) points, around the neckline roundings 44 (46) points and on the neckline of the backrest 45 (47) points = 273 (291) points. Link 1 w. R. individuals. and all loops close faces. Run side seams.








Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments