Click For Crochet Abbreviations List
Sizes: S (M) L (XL) XXL
The width of the product on the chest girth: 88 (95) 103 (110) 118 cm.
Product length: 64 (66) 68 (70) 72 cm.
You will need: 10 (11) 12 (13) 14 skeins of gray-blue yarn (85% alpaca, 15% silk; 50g / 270 m); Spokes number 3 and 3.5; circular needles number 3 with a length of 60 cm.
Attention: the product is knitted in 2 threads.
Knitting technique.
The front smooth surface: front rows - front loops, purl rows - purl loops.
Wrong surface: front rows - back loops, purl rows - front loops.
Gum 1x1: alternately 1 person. n., 1 out. p.
The main part of the back and front, sleeves: knit according to the appropriate schemes.
Kant with knobs: the number of loops is a multiple of 4 + 3 + 2 chrome. Dial loops and knit purl row as follows: 1 chrome. (in all rows to knit the face), * 3 persons., from the next loop, tie 7 items (= 1 faces., 1 nakid, 1 persons., 1 nakid, 1 persons., 1 nakid, 1 persons., turn and knit all 7 p. faces., turn, 7 out., turn, 3 p. knit together the front crossed (= 2 p. remove, 1 p., removed loops stretch through the tied), 1 p., 3 p. fasten together . (= 1 person. And stretch it through the 2 following loops), turn, 3 sections, knit together faces. * Repeat from * to * finish 3 faces., Faces. Chrome.
Structural pattern.
1st reg.: All loops knit facial.
2nd b.: 1 person., * 1 out., 1 person. * repeat from * to *.
3rd R.: in se loops knit facial.
4th b.: 1 out., * 1 person., 1 out. * repeat from * to *.
Repeat these 4 rows.
Path of elongated loops (= 6 rows):
1, 3 and 5th p. (= izn. r.): 1 izn., * 1 p. to remove, the thread at work (on the front side), 1 izn. * repeat from * to *.
2, 4 and 6th b.: 1 person., * 1 point. To remove, the thread before work (on the front side), 1 person. * repeat from * to *.
2 points together with the front one tilted to the left: 1 point to remove the front one, like the front one, knit the next stitch on the front one and stretch it through the removed loop.
Increase 1 point: broach between 2 points of the previous row, catch the left needle and knit the faces. crossed.
Knitting density, purl in two threads with needles No. 3.5: 22 items and 30 p. = 10 x 10 cm.
DESCRIPTION OF WORK
The back: on the needles number 3.5 dial 101 (109) 117 (125) 133 p. And knit piping with knobs. Continue with the structural pattern. After 15 (16) 17 (18) 19 cm, make a path of elongated loops (= 6 p.). Next, knit on the scheme of the corresponding arrow. At a height of 40 (41 42 (43) 44 cm, make a mark in the middle of the row and close it at the beginning of each row on both sides at 5, 3, 2, 1, 1, 1 (5, 3, 2, 2, 1, 1, 1) 4, 3, 3, 2, 1, 1, 1, 1 (5, 4, 3, 2, 1, 1, 1, 1) 6, 4, 3, 2, 2, 1, 1, 1 p . = 75 (79) 85 (89) 93 p. After 19 (20) 21 (22) 23 cm from the mark close the neckline average 31 (33) 35 (37) 39 p. And finish both sides separately. At the beginning of each close the rows from the inner edge once more 3 times and 1 times 2 points. At the same time for the shoulder bevel at the beginning of each row close from the outer edge 5, 6, 6 (6, 6, 6) 6, 7, 7 (7, 7 , 7) 7, 7, 8 p.
Before: knit like a back, but with a deeper neck. To do this, attach it to the back and, when it remains to tie 10 cm to the upper point of the shoulder bevel, close the middle 15 (17) 19 (21) 23 points and finish both sides separately. At the beginning of each row from the inner edge close 4, 3, 2, 1, 1, 1, 1 p. Run the shoulder bevels at the same height and in the same way as on the back.
Sleeve: on needles No. 3 dial 45 (51 57 (63) 69 p. And knit 3 rows with 1x1 elastic band. Continue work with needles No. 3.5 according to the scheme for hoses. At a height of 12 cm for side bevels add on both sides 1 p Repeat these additions 9 more times in each 8th row = 65 (71) 77 (83) 89 p. Through 42 (43) 43 (44) 44 cm from the dial, close on both sides at the beginning of each row 3, 2 p. Then knit as follows: 1 person., 2 p. Knit together the front, add up to the last 3 p. Rows, 2 p., Knit together the front with an inclination to the left, 1 face. in the front row then in each front row, until 29 (31 33 (35) 37 p. remain on the needles). After that, close 2, 3, 4 p. on each side of the row. Close the remaining loops in the same row.
Assembly: perform all stitches, sew the sleeves.
Bake the neckline: on the circular needles No. 3, loop around the edge of the neckline, starting from the right shoulder seam, and knit around 6 rows with an elastic band = alternately 1 person., 1 wear, then 8 rows to knit with the front ones. Hinges close.
Big leaflet: on the needles number 3.5 dial 3 p. And knit 3 rows of the front satin stitch. Then carry out 12 rows as follows: tie up the row to the middle loop, 1 nakid, knit the middle loop, 1 nakid, tie up the row to the end. From the 13th to the 15th row, knit the front satin stitching without nakida, then perform 12 rows as follows: 2 sts. Knit the face together with a tilt to the left, tie up the last 2 sts of the series, 2 sts. Knit together the front. When in the row there will be 3 p., 1 p. Remove, 2 p. Knit together the front one and stretch the knit loop through the removed one. Similarly, bind the second big leaf. In the same way, perform one medium and one small leaf (increments and increments to perform, respectively, in 6 and 3 rows). Sew the leaves to pullover, as in the photo.