Click For Crochet Abbreviations List
Sizes: 36/38 (40/42) 44/46
You will need: 350 (400) 400 g turquoise and 300 (350) 350 g white Laguna yarn (80% viscose, 20% silk, 77 m / 50 g); straight and circular needles No. 4, 5.
Facial smoothness: persons. R. - persons. n., izn. R. - ex. p.
Gum: start with 1 person. R. and knit chrome., * 1 persons., 2 out., 1 persons., repeat from *, chrome. In izn. R. peppy knit by pattern.
Gum: start with 1 int. R. and knit chrome., * 1 out., 2 persons., 1 out., repeat from *, chrome. In the pizza. R. peppy knit by pattern.
Hole pattern: number of loops is a multiple of 4 + 2 chrome. individuals. P .: chrome., * 1 broach (= remove 1 item. as persons., 1 person. and stretch it through the removed loop), 2 nakida, knit 2 n, together faces., repeat from *, chrome. Out p .: izn. n., 1st nakid persons., 2nd nakid izn. Holes lie above the bands from the inside. n previous gum.
The main pattern: the number of loops is a multiple of 4 + 2 chrome.
1st and 2nd b.: Persons. n.
3rd and 4th R.: izn. n.
5th b.: persons. p.
6th - 20th gum, start and finish 1 out. R.
21st and 22nd paragraph: hole pattern. Repeat from 1st to 22nd p. The sequence of alternation of bands: 22 p. whites and turquoise alternately.
Knitting density Persons smooth surface: 16.5 p. and 24 p. = 10 x 10 cm; gum and hole pattern: 22 p. and 27 p. = 10 x 10 cm; main pattern: 22 p. and 29 p. = 10 x 10 cm.
We knit a turquoise-white pullover with knitting needles .
Back: Use turquoise
thread to dial 114 (124) 134 p. And tie 9 cm for a shuttlecock = 22 p. individuals. stitch, then knit gum, while starting with 1 persons. R. and to give shape to subtract in the 1st p. as follows 24 (26) 28 p.: Krom., knit 2 p. together persons., * 1 w., knit 2 p. together w., 2 persons., repeat from * another 20 (22) 24 times, end of 1 izn., knit 2 pp. together izn., knit 2 ip together persons., chrome. = 90 (98) 106 p.
At the height of gum 6 p. finish shuttlecock 2 p. hole pattern; total height of the shuttlecock 11 cm = 28 p. Then knit the main pattern in the specified sequence. Through 27 cm = 78 p. from the shuttlecock close for armholes on both sides of 3 p. and in each 2nd p. 4 x 1 p. = 76 (84) 92 p.
Through 47 cm = 136 p. (49 cm = 142 p.) 51 cm = 148 p. from the question to close for the neckline averages 46 (48) 50 p. and to finish both sides separately. For rounding up close from the inside edge in every 2nd p. 1 x 2 and 1 x 1 p. Through 49 cm = 142 p. (51 cm = 148 p.) 53 cm = 154 p. from the shuttlecock close on each side the remaining 12 (15) 18 p. shoulder.
Before:
Knit the same, but for a deeper neckline close after 42 cm = 122 p. (44 cm = 128 p.) 46 cm = 134 p. from the shuttlecock, the average 34 (36) 38 points and, for rounding, close from the inside edge in each 2nd p. 1 x 2 and 7 x 1 n,
Sleeves:
Use turquoise thread to dial 59 (64) 69 p. And tie 9 cm = 22 p. For the shuttle. individuals. stitch, then knit gum, while starting with 1 persons. R. and to give shape to subtract in the 1st p. as follows 11 (12) 13 n.: chrome., 2 persons., * 1 wear,, knit 2 items together, 2 faces., repeat from * another 10 (11) 12 times, chrome. = 48 (52) 56 g. All following persons. R. also start and finish between chrome. 2 persons. At the height of gum 6 p. finish shuttlecock 2 p. pattern of holes, while in the 1st p. at the beginning after chrome. and at the end to chrome. execute 1 add. individuals. P.; total height of the shuttlecock 11 cm = 28 p. Then knit the main pattern in the specified sequence.
For bevel sleeves add from the shuttle with the corresponding color on both sides in each 6th p. 12 x 1 p. (Alternately in each 4th and 6th p. 14 x 1 p.) In each 6th p. 5 x 1 p. And in every 4th p. 11 x 1 p. = 72 (80) 88 p., Including the added loops in the pattern. Through 27 cm = 78 p. from the shuttlecock close for douche sleeves on both sides of 3 sts and in each 2nd p. 2 x 2, 19 (20) 20 x 1 and 2 x 2 (2) 3 p.
Through 43.5 cm = 126 p. (44 cm = 128 p.) 44 cm = 128 p. from the shuttlecock close the remaining 12 (18) 22 p. with the turquoise thread.
Build:
Run the shoulder seams. For the neckline, dial 116 (120) 124 p. With circular needles with a turquoise thread, tie 1 circular p. individuals. and izn., then close all loops izn. Sew in sleeves, complete side seams and sleeve seams.