Click For Crochet Abbreviations List
DIMENSIONS
36/38 (40 / 42-44 / 46-48 / 50)
YOU WILL
Yarn (71% mohair, 14% silk, 8% polyester, 7% nylon; 210 m / 25 g) - 100 (150-150-200) g beige;
yarn (70% alpaca wool, 30% silk; 250 m / 50 g) - 100 (150-150-150) g golden yellow; circular needles No. 4, 5 and 7 with a length of 60 cm; 1 auxiliary needle for knitting "braid" №2,5.
PATTERNS AND CIRCUITS PATTERNS
WITH PROTECTION A AT 54 (58-62-62) P. 1-9th
river: to knit with a golden-yellow thread on the face of the satin-stitch.
10th p. (= izn. row): knit with a golden yellow thread. 17 (18-19-19) p. 1 p. Remove to the auxiliary needle, put the auxiliary needle before work and knit together purl 1 item from the working needle and 1 item from the auxiliary needle, next 20 (22-24-24) item from the working needle to knit with the wrong side, then again remove to auxiliary needle 17 (18-19-19) p. 1 p. and knit together purses 1 p. from the working needles and 1 p. from the auxiliary needles.
11-18th p.: Knit beige thread facial satin. 19th p. (= individual. row): knit beige thread. 17 (18-19-19) p. Knit facial, on the seamy side the next 20 (22-24-24) p.
12th p. = 2nd pp., Connected by a beige thread, remove to the auxiliary needle, put the auxiliary needle at work and knit together with the front 1 pp from the working knitting needle and 1 p. 19-19) n. Knit facial.
20th p.: Knit beige thread purl.
In height, repeat from the 1st to the 20th row.
PATTERN WITH PROTECTION IN AT 54 (56-58-60) P. 1-9th
river: to knit with a golden-yellow thread on the facial surface.
10th p. (= izn. row): knit with a golden yellow thread. 17 (18-19-20) p. Of the 1st p. remove the auxiliary needle, auxiliary needle to place in front of the working needle and knit together purl 1 item from the working needle and 1 item from the auxiliary needle, knit the following 20 points from the work needle with purl, then 17 again (18-19-20) n. 1st p. remove to the auxiliary knitting needle and knit together purl 1 item from the working needle and 1 item from the auxiliary needle.
11-18th p.: Knit beige thread facial satin. 19th p. (= person. row): knit beige thread: 17 (18-19-20) p. knit facial, on the wrong side the next 20 p.
12th p. (= 2nd p., Connected with a beige thread) to remove to the auxiliary needle, to put the auxiliary needle at work and to knit together the front one at 1 point from the working needle and 1 point from the auxiliary needle, next 17 (18-19-20) P. knit facial.
20th p.: Knit beige thread purl.
In height, repeat from the 1st to the 20th row.
DECORATIVE REGULATED BUTTERFLY
From the right edge = chrome., 2 n. Knit together the front.
From the left edge: = 2 p. Knit together the front one with a tilt to the left (= 1 p. Remove, as with the front knitting, knit the next loop face and stretch it through the removed loop), chrome.
PERSONAL SMOOTH
Facial rows - facial hinges, purl rows - purl loops. In the circular rows of all loops knit facial.
KNITTING DENSITY
19 p. X 30 p. = 10 x 10 cm, connected by the front surface of a mohair thread;
19 p. X 40 p. = 10 x 10 cm, connected by patterns with tucks A and B.
Samples are made on the needles No. 4, 5.
ATTENTION The
details connected by patterns with nibs A and B are stretched in height, narrow areas of the same details connected by the front satin finish are also stretched, therefore the measurements on the pattern are calculated by the patterns with tucks according to the knitting density.
PERFORMANCE WORK
BACKBACK
Double thread (1 thread beige and 1 thread golden yellow) on the needles No. 7 dial crossed 86 (94-102-110) p.
Next knit 1 beige thread on the needles No. 4,5 with the front satin stitch, while starting with seamy row.
After 3 cm = 9 p. from the dial-up series of knit patterns in the following sequence: chrome., 15 (17-19-23) p. face trim, 54 (58-62-62) p. pattern with tucks A, 15 (17-19-23) p. front satin-stitch, chrome., while changing the color of the thread on the seamy side of the work, cross each other so that small holes do not appear on the finished product.
Through 55 cm = 220 p. from the beginning of the pattern with tucks A knit on all the loops with a beige thread on the front satin stitch.
At the same time in 37.5 (36-34.5-33) cm = 150 (144-138-132) p. from the beginning of the pattern with tucks A, close on both sides for the armholes 1 time 4 times (5-6-8) paragraph, then run in each 6th p. 13 (14-15-16) times for 1 decorative raglina subtraction.
Through 20.5 (22-23.5-25) cm = 80 (86-92-98) p. from the start of the armhole, temporarily postpone the remaining 52 (56-60-62) p.
BEFORE
Knit as back.
SLEEVE
4-fold
beige thread on needles No. 7 dial with crossed 54 (56-58-60) p. Next, knit with 1 beige thread on needles No. 4.5 with a front satin stitch, while starting from the wrong side.
Through 3.5 cm = 11 p. From the dial-up row, add 1 times for both bevels on both sides, 1 point, then in each 20 (18-14-10th) p. 7 (8-10-13) times 1 p. = 70 (74-80-88) p.
Simultaneously through 3.5 cm = 11 p. from the dial-up row, continue to knit on the middle 54 (56-58-60) section with a pattern with tucks B, on both sides of the pattern to knit with a beige thread on the face of the satin-stitch.
Through 42.5 (41-39.5-38) cm = 170 (164-158-152) p. from the beginning of the pattern with tucks In, close on both sides 1 time 4 (5-6-7) p., then run in each 4th p. 19 (20-22-24) times 1 decorative raglina subtraction.
Attention
When performing raglary reductions, it is also necessary to reduce the width of the pattern with pinches B, so that it remains framed by the front satin stitch, tied with a beige thread. For this, the 10th golden yellow tuck from the beginning of the pattern with the pinches B on both sides of the middle 20 p. Knit only 14 p., The 11th golden yellow pint on both sides of the middle 20 p. Knit only 9 p. and the 12th golden yellow tuck on both sides of the middle 20 s. knit only 4 s.
Through 17.5 (19-20.5-22) cm = 70 (76-82-88) p. from the start of ragland bevels, or after 60 cm = 240 p. from the beginning of the pintment pattern B, continue to knit on all the loops with the front satin stitch of a beige thread.
Through 20.5 (22-23.5-25) cm = 80 (86-92-98) p. from the beginning of the raglan bevels, temporarily postpone the remaining 24 (24-24-26) p.
ASSEMBLY
Run the seamed seams.
Postponed 152 (160-168-176) p. Reshoot on the circular needles No. 4, 5 and knit 1 krug.r. front beige thread, while knitting the edge loop with the next loop of the front and the penultimate loop together with the edge of the front loop with a tilt to the left = 144 (152-160-168) on each part. Then close all the loops with a beige thread in 4 additions.
Run side seams and sleeve seams.