Click For Crochet Abbreviations List
Dimensions
S/M (M/L) L/XL
Width of the product on the grasp of the breast: 106 (114) 122 cm
Product Length: 76 in (77 in) 78 cm
You will need to
Yarn 1 (100% Wool; 50 g/155 m) – 3 (4) 4 winder Beige, 5 (6) 7 Motks Black, 4 (5) 5 rolls of sulphur;
Yarn 2 (70% kid mohair, 30% polyamide; 25 g/225 m) – 3 (4) 4 winder Beige, 4 (4) 4 Motka Black, 4 (4) 4 skein grey; Spokes № 4; Hook № 2; 3 buttons with a diameter of 25 mm; Loop markers.
Patterns and diagrams
Gum
Alternately 2 Izn, 2 persons.
Embossed pattern
Knit by scheme.
Sequence of Strips
21 cm Black,
21 cm Grey,
21 cm Beige thread,
Then knit the black thread until the end of the work.
Density of Knitting
20 p. x 34 P. = 10 x 10 cm, is associated with a relief pattern double thread (= 1 thread from each type of yarn) on the spokes № 4.
Attention!
The Product is knitted by a double thread (= 1 thread per yarn).
Important!
To get a product of the appropriate size, your sample on the density of knitting should correspond to the given, and first of all-on width. Therefore, before proceeding to work, it is necessary to associate a sample of a pattern: to dial 34 p. and to Knit 14 sm a face smooth. Then to count loops on the average site of the made sample in length 10 SM: If on this segment more than 20 p., to change spokes on thicker, if less-on more thin. If only one number is specified in the statement, it applies to all dimensions. 2 p. Touch together the front with a slope to the left: 1 p. Take off as a face, the next loop to touch the front, then stretch it through the removed loop.
Doing the work
Back
On the spokes № 4 black thread Dial 106 (114) 122 p. and knit the bottom bar elastic band (1st P. = n. Row); At the beginning and the end of the series to tie 2.
Tie the 2 p. Rubber Band and continue the work with a relief pattern on the diagram, performing the strips in the specified sequence.
After 45 cm mark the middle of the backrest with a marker and close it on both sides for the armholes at the beginning of each row of 2 p.
Then for rounding Armi to execute Ubavki: 1 persons., 2 p. Projazat together the obverse (according to a pattern), further to knit up to the last 3 p. On a spoke, then 2 p. Projazat together a front with a slope to the left (according to a pattern), 1 persons. These Ubavki repeat in each 2nd p. (= in each lyceum row)-only to perform 8 p. with Ubavkami = on the spokes 86 (94) 102 p.
Continue knitting straight without decreases.
When the height of the marker will be 28 (29) 30 cm, from the outer edge at the beginning of each row close for the shoulder bevel of 5, 5, 6, 6, 6 (6, 6, 6, 6, 7) 6, 7, 7, 7, 7 p.
Then Close the Middle 22 (24) 26 p. For the neck and both sides to finish separately.
At the Same time to continue the shoulder bevel from the inside at the beginning of each row close 2, 2 p.
Right Shelf
On the spokes № 4 black thread Dial 69 (73) 77 p. and Knit Rubber Band (1st P. = n. Row); At the beginning and the end of the series to tie 2. + 1 persons. To Chrome. (To knit according to the pattern or elastic band).
Tie the 2 p. Rubber Band and continue the work with a relief pattern on the diagram, performing the strips in the specified sequence.
Attention!
Through 45 cm close loops for armholes as described for the backrest = on the Spokes 59 (63) 67 P.
After Tying up to the 1st Ubavka for the shoulder bevel (to be checked on the back), shoulder bevel to perform as on the backrest, and on the remaining 31 (32) 33 p. Tie 12 cm for the collar.
Left Shelf
Knit as the right shelf, but in a mirror display.
Sleeves
On Spokes № 4 a black thread to dial 50 (54) 58 p. And to knit a lath a rubber band, as on a back (1st p. = a series).
Tie the 2 p. Rubber Band and continue the work with a relief pattern on the diagram, performing the strips in the specified sequence.
At the length of the sleeve 12 (13) 14 cm in each 4th p. On both sides after/before Chrome. Add 1 P. = On the Spokes 108 (112) 116 p.
At length of a sleeve 45 sm (the pattern on a sleeve should coincide on length with a pattern on a back and forward) from both parties at the beginning of each row to close for Okata on 2 p.
Then to execute Ubavki for a rounding okata, as it is described for armholes on a backrest = number of rows with Ubavkami should be the same, as on a back.
Close the remaining loops.
Assembly
To Connect the details from the front side of the mattress and knitted seams = mattress-longitudinal edges of details (= 1 p. One part with 1 p. of another part), knitted seam-edges with closed loops.
Perform shoulder seams (the seam should not stretch), lateral seams and seams of sleeves.
Sew sleeves so that on okatu not formed folds or waves (to start in the middle of a sleeve near to a humeral seam and to carry out a seam in a direction downwards on both sides).
The Bottom parts of sleeves to sew in armholes.
Run the collar seam from the back of the middle and sew the collar into the neck.
Hinged Hinges, crochet
On the front edge of the right shelf on the site with a gray stripe crochet № 2 gray thread to perform 3 hinged loops: 1 art. b/N, 10 v. P., 1 art. b/n by 2 cm below the previous one, work turn by using 1 nozzle. Art. In 1 art. b/N, then in the opposite direction to link 1 coed. Art. In each VP, and close the row with the help of 1 coed. Art. In 1 art. b/N.
Sew the buttons to the left shelf at a distance of 5 cm from the front edge of the shelf.