Annie

Baby Striped Cardigan Free Pattern

Click For Crochet Abbreviations List

Dimensions: 0 (3) 6 (12) 18 months 
You will need: Yarn Phil Merinos 6 (100% merino wool; 78 m/50 g)-1 (2) 2 (2) 3 Motka Beige (Craie), 2 (3) 3 (3) 4 Motka dark blue (MARINE); Spokes № 5 and 6; 4 (4) 4 (5) 5 buttons with a diameter of 14 mm. 
Elastic: Knit alternately 1 p. Persons. Surface. 1 p. N. Surface. 
Facial Surface: Facial loops, purls rows – purls loops. Front surface in the lane: 2 p. dark Blue Thread, * 6 p. Beige Thread, 8 p. Dark Blue Thread *, from * to * repeat. 
Density of viscous: the obverse surface in a stripe (spokes № 6) – 16 p. x 21 р. = 10 x 10 sm. 
Back: 
Dark blue Thread on the Spokes № 5 Dial 41 (43) 45 (49) 53 p. and tie 2 cm elastic band, thus start and finish 1st p. 1 persons. Go to the Spokes № 6 and continue the work of the front Stitch in stripes. After 13 (15) 17 (19) 20 cm from the initial row close for armholes on both sides 1 x 2 p., then in each of the next 2 p. 1 x 2 P. and 1 x 1 P. = 31 (33) 35 (39) 43 p. Through 23 (26) 29 (32) 34 cm from the initial row to close for the Skosov on both sides 1 x 4 p., then through 2 p. 1 x 5 p. (1 x 4 p., then through 2 p. 1 x 5 p.) 1 x 4 p., then through 2 p. 1 x 5 p. (1х5 p., then through 2 p. 1 x 5 p.) 1 x 5 p. , then in 2 p. 1 х 6 p. At the same time with the 1st Ubka for the shoulder bevel close for neck cut Middle 13 (15) 17 (19) 21 p. 
Right Shelf: 
Dark blue Thread on the Spokes № 5 dial 19 (21) 21 (23) 25 p. and tie 2 cm elastic band, thus start a series with two faces. and finish 1 H. Go to the Spokes № 6 and continue the work of the front stitch in the strip, adding 1 (0) 1 (1) 1 p. At the beginning of the series = 20 (21) 22 (24) 26 p. Through 13 (15) 17 (19) 20 cm from the initial row to close to the armholes from the left working edge 1 x 2 p. , then in each of the next 2nd p. 1 х 2 p. and 1 х 1 P. = 15 (16) 17 (19) 21 p. Through 21 (24) 27 (29) 31 cm from the initial row close to the neckline from the right working edge of 1 x 3 p., then in each of the next 2 p. 1 x 2 p. and 1 x 1 P. (1 x4 p., then in each of the next 2nd p. 1 x 2 P. and 1 x 1 P.) 1 x 5 p., then in each of the next 2 p. 1 x 2 P. and 1 x 1 P. (1 x 5 p. , then in each next 2nd p. 1 x 2 P. and 2 x 1 p.) 1 x 5 p., then in each of the next 2nd p. 2 x 2 P. and 1 x 1 P. through 23 (26) 29 (32) 34 cm from the initial row to close the shoulder bevel from the outer edge of the 1x4 p., then through 2 p. 1 x 5 p. (1 x 4 p. , then 2 p. 1 x 5 p.) 1 x 4 p., then through 2 p. 1 x 5 p. (1 x 5 p., then through 2 p. 1 x 5 p.) 1 x 5 p., then through 2 p. 1 x 6 p. 
Left Shelf: 
Knit symmetrically right shelf. 
Sleeves: Dark blue thread on the Spokes № 5 Dial 25 (27) 29 (31) 33 p. and tie 2 cm elastic band, thus start and finish 1st p. 1 persons. Go to the Spokes № 6 and continue the work of the front Stitch in stripes. For Skosov add on both sides in each of the next 4th p. 2 x 1 P. and further in each of the next 2 p. 2 x 1 P. (in each of the next 6th P 2 x 1 p. and further in each of the next 4th p. 2 x 1 P.) in each of the next 6th P. 2 x 1 P. and further in each of the next 4th p. 3 x 1 P. (in each of the next 6th p. 3 x 1 P. and further in each of the next 4th p. 3 x 1 P.) in each of the next 6th p. 5 x 1 P. and further through 4 p. 1 X 1 P. = 33 (35) 39 (43) 45 p. Through 9 (13,5) 15,5 (18,5) 20,5 cm from the initial row close for Okata on both sides 1 x 3 p., then in each of the next 2 p. 1 x 2 P., 1 x 1 P., 1 x 2 p. and 1 x 3 p. (1 x 3 p., then in each of the next 2nd p. 3 x 2 P. and 1 x 3 p.) 1 x 3 p., then in each of the next 2nd p. 1 x 3 P., 1 x 2 p. and 2 x 3 p. (1 x 4 p., then in each of the next 2 p. 1 x 3 P., 1 x 2 p., 1 x 3p. and 1 x 4 p.) 1 x 4 p. , then in each of the next 2nd p. 3 x 3 p. and 1 x 4 p. Close the remaining 11 p.

Hood: 
Dark blue Thread on the spokes № 5 to dial 61 (65) 69 (71) 71 p. and tie 1.5 cm elastic band, thus start and finish 1st P. 2 persons. Go to the Spokes № 6 and continue the work of the front stitch in the strip, adding at the beginning of the series 1 P. = 62 (66) 70 (72) 72 p. Through 13.5 (14.5) 15,5 (17) 18 cm from the initial row to divide the work in the middle and both sides to finish separately. For rounding close on both sides in each next 2nd p. 1 x 1 P., 1 x 2 p. and 2 x 3 p. via 17,5 (18,5) 19,5 (21) 22 cm from the initial row close the remaining 13 (15) 17 (18) 18 p. Second side finish similarly. 
Fastener Straps: 
Dark blue Thread on the Spokes № 5 Dial 41 (47) 53 (57) 61 p. and tie 1.5 cm elastic band, at the same time start and finish the 1st P. 2 persons., then tie 1 p. Obverse on the front side and several rows of front smooth thread of contrasting color. The second bar to knit is similar. 
Assembly: 
Perform shoulder seams, side seams and sleeve seams. Sew Sleeves. Run the back seam of the hood from point A to point B, then sew it into the neck. Point B is located in the middle of the neckline of the backrest, and points c in the upper corners of the shelves. Sew the straps of the fastener on the front edges of the shelves with a kettface seam on the front side of the work. Run 4 (4) 4 (5) 5 button holes by sliding the loops: 1st hole at 1 cm from the edge, the rest at intervals of 6 (7) 8 (6.5) 7 cm from each other. Sew the buttons symmetrically to the holes for them.








Source : https://vk.com/public170390569?w=wall-170390569_452







Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments