Click For Crochet Abbreviations List
Sizes (Russian): 42-46.
You will need: 1050 g of brown melange (color 5) yarn Lana Grossa FIORE (70% wool, 30% alpaca, 60 m / 50 g); straight needles number 7 and number 8; long circular needles number 7.
Knitting technique.
Gum: alternately 2 persons., 2 out.
Wrong surface: persons. R. - ex. n., izn. R. - persons. p.
Pattern of braids: knit 28 p. under the scheme. In izn. R. knit loops on the pattern.
The main pattern: the number of loops is a multiple of 4 2 2 chrome.
1st and 3rd R.: Krom., * 2 persons., 2 out., Repeat from *, 2 persons., Chrome.
2nd p .: knit loops on the pattern.
4th r.: Persons. n.
Repeat 1st - 4th p.
Knitting density
The main pattern, the needles number 8: 14 p. And 18 p. = 10 x 10 cm;
Wrong surface, the needles number 8: 12.5 p. And 18 p. = 10 x 10 cm;
28 n. Pattern of braids = 15 cm wide.
DESCRIPTION OF WORK
Back: dial 80 points on the needles number 7 and tie between chrome. 10 cm rubber band. Then translate the loop on the needles number 8 and knit the main pattern. After 68 cm from the start of work, close on both sides for the armholes 2 sec., Then in each 2nd p. 1 x 2 p. And 4 x 1 p. After 20 cm from the beginning of the armhole, close on both sides for shoulder bevels 7 p., Then in each 2nd p. 2 x 8 p. Simultaneously with the beginning of the shoulder bevels, close the 14 pt for the neckline cut and both sides to knit separately. For rounding the cut close from the inside in the next 2nd p. 1 x 2 p.
Left shelf: dial 34 p. On the needles number 7 and tie between chrome. 10 cm rubber band, starting from 2 out. In the last life. R. uniformly add 6 s. = 40 s. Translate loops on the needles number 8 and knit as follows; Krom., 6 paragraphs. smoothing, 28 p. pattern of braids, 4 p. smooth After 58 cm from the beginning of work, close for neckline cut on the left side of 1 p., Then in each 14th p. 3 x 1 p. At the same time, 68 cm from the start of work, close on the right side for the armhole 2 p., Then in each 2nd p. 2 x 1 p. And in every 4th p. 2 x 1 n. After 20 cm from the beginning of the armhole, close on the right side for the shoulder bevel 1 x 10 n., Before this, knit together persons. 3 x 2 p. Then in every 2nd p. close 2 x 10 p., before this, knit together persons. 2 x 2 p.
Right shelf: knit symmetrically left shelf.
Sleeves: dial 30 points on the spokes number 7 and tie the bar with a rubber band, starting after chrome. from 1 person. and 2 res., ending with 2 ex., 1 persons. before chrome. After 18 cm from the start of work, transfer the loops to the needles No. 8 and knit the main pattern, in the 1st p. type on both sides of the chrome. on 1 persons. = 32 p. For bevel sleeves add on both sides in the 7th p. 1 p., Then 6 x 1 p. In each 6th p. and 2 x 1 p. in every 4th p. = 50 p. After 48 cm from the beginning of work, close on both sides for okat 3 p., Then in each 2nd p. subtract 1 x 2 p., 10 x 1 p., 1 x 2 p. and 1 x 3 p. Then close the remaining 10 p.
Assembly: perform shoulder seams. For the strip and collar, type along the straight edges of the shelves on the needles No. 7 on 94 p. Chrome., On the bevels of the neckline 56 each and on the edge of the neckline of the backrest 30 p. 30 points of the neckline of the back of the neckline and 56 points of the bevel of the neckline of the shelves: start on the loops of the neckline of the back of the neckline, then perform 14 x 4 points on both sides more. After 28 p. in the work all the loops of the neckline cutout and the bevel of the cutout. Then on all the loops tie another 10 cm, close the loop. Run side seams and sleeve seams. Sew on sleeves.
Belt: dial 9 points on the needles number 7 and knit between the chrome. alternately 1 person., 1 out. After 150 cm from the beginning of the loop to close.