Mayra

KNITTING WOMENS SWEATER

Click For Crochet Abbreviations List

Sweater size: 38-40 / 42-44 / 46-48. 

YOU WILL NEED: Lanas stop yarn "YORK MERINO" (100% wool, 50 g / 125 m): color number 702: 15/16/17 skeins. Spokes number 6. 

Twisted elastic band 1/1 (to knit each item crossed). 

Pigtails and rhombuses: see diagrams 1, 2, 3. 

Lits. smooth surface: * 1 p. individuals. p. 1 p. from n. * 

Knit double thread.

BACK: dial 79/85/91 p. And knit twisted elastic band 1/1. 6 cm from HP, knit a trace. way: 10/13/16 p. persons. Ch., 15 p. pigtails (see diagram 1), 29 p. rhombus (see diagram 2), 12 p. pigtails (see diagram 1), starting from 2 out. p., 3 p. pigtails (see diagram 3), and 10/13/16 p. of persons. smooth surface It will turn out to be 86/92/98 p. Through 40/42/43 cm from HP, perform for substitution armholes on each side in each 2 p. 1 x 4 p., 1 x 3 p., 2 x 2 p., 1 x 1 p. / 1 ​​x 4 p., 1 x 3 p., 2 x 2 p., 2 x 1 p. / 1 ​​x 4 p., 1 x 3 p., 3 x 2 p., 1 x 1 p. It turns out 62/66/70 p. Continue straight and after 58/60/62 cm from HP, perform the neck, lowering 12 center, p and on each side 1 x 3 p., 1 x 2 p. / 2 x 3 p. / 1 ​​x 3 p., 1 x 4 p. It turns out 20/21/22 p. for the shoulder and after 60/62 / 64 cm from HP, close all items at once.

BEFORE: do the same work as for the back, but after 52/54/56 cm from the HP perform the neck, diminishing the 8th center. n. and finish each side separately. Continue, diminishing in each 2 p. 7 x 1 n. / 8 x 1 n. / 9 x 1 n. Will remain 20/21/22 n. For the shoulder and 60/62/64 cm from the HP, close all n. At the same time. The second part to perform the mirror first.

SLEEVE: dial 35/39/39 p. And knit twisted elastic band 1/1. 7 cm from HP, knit a trace. as follows: 3 p. braids (see diagram 1), (2 persons and 3 p. braids (see diagram 1), 29 p. rhombus (see diagram 2), 3 p. braids (see diagram 3), (3 p. Pigtails (see diagram 3) and 2 persons. P.) Add on each side in each 4 p. 10 x 1 p. / 12 x 1 p. / 12 x 1 p. It turns out 55 / 59/63 p. Knit the face with a satin stitch, gradually distributing the additions. After 43/45/46 cm from HP, decrease on each side in each 2 p. 1 x 3 p., 10 x 1 p., 5 x 2 p. . / 1 ​​x 3 p., 1 x 2 p., 11 x 1 p., 5 x 2 p. / 2 x 3 p., 11 x 1 p., 5 x 2 p. Remains 9 p. And after 59 / 61/63 cm from the HP close all n simultaneously.. 

COLLAR: dial 73/75/77 n and knit elastic band twisted After 10 1/1 cm from the HP finish slave.. the.

ASSEMBLY OF THE SWEATER: Lightly ironed with izn. side all the details of the product. Run shoulder seams. Sew a collar around the perimeter of the neck out. stitch Run the seams of the sleeves, sew them into the product. Slightly iron seams from the inside. parties.














Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments