Kathie

CROCHET BLOUSE WITH KNITTING NEEDLES FREE PATTERN

Click For Crochet Abbreviations List

Dimensions: 38/40 (46/48) you will need: 650 (700) g of Venice rosewood (90% cotton, 10% cashmere, 75 m / 50 g); straight and circular: pizza number 4; 2 buttons,


Gum: alternately 1 persons., 1 out. 

Openwork pattern: the number of loops is a multiple of 10; 2 chrome. Knit under the scheme 1, which shows only persons. r., in izn. R. all the loops are knit by pattern, nakida - izn. Repeat between chrome. rapport and from the 1st to the 8th p. 

A pattern of rhombuses: first the number of loops; a multiple of 13 + 8 + 2 chrome. Knit as an openwork pattern, but according to scheme 2. 

Start: 1 chrome. and loops before rapport, repeat rapport, finish looped after rapport and 1 chrome. Repeat from 1st to 40th p. 

Knitting density Openwork pattern: 17 I. and 23 p. = 10 x 10 cm; diamond pattern: 7 p. and 26 p. = 10 × 10 cm;

Back: dial 108 (128) n. And tie (for the strap 2 cm with an elastic band, adding evenly in the last wearout. P. 6 n. = 102 122) n .; then knit openwork pattern. 1 15.5 cm = 36 p. (17 cm = 40 p.) From the strap to knit for beading in 11 (13) strips of izn. p. 2 p. together w. = 91 (109) p. (Reducing the width of the beam on the pattern in the form of a bevel). Nerez 27 cm = 62 p. (28.5 cm = 66 p.) From the slat close for raglan bevels: 3 sides of both sides and subtract as follows in each 2nd p. 8 (10) x 1p .: after chrome. perform 1 broach (see Legend) and up to chrome. knit 2 paragraphs together persons. After 35 cm = 80 p. (38.5 cm = 88 p.) From the bar to postpone the remaining 69 (83) p.

Left shelf: dial 54 (64) n. And tie a 2 cm rubber band for the slat, subtracting it evenly in the last wear. R. 2 p. = 52 (62) p .; then knit openwork pattern. Through 15.5 cm = 36 p. (17 cm = 40 p.) From the strap to knit for ¬ talivaniya in 6 (7) bands from izn. p. 2 p. together ex. = 46 (55) p. Run on the right side raglan bevel as on the back. 

At the same time through 29.5 cm = 68 p. (31.5 cm = 72 p.) From the bar to postpone for the neckline cut on the left side of 10 s. And in each 2nd p. 5 x 5 p. (4 x 5 and 3 x 4 p.), While doing the shortened p. turn up to deferred n. with 1 nakida. After 35 cm = 80 p. (38.5 cm = 88 p.) 35 (42) p. 

Are deposited from the plank. Right shelf: knit symmetrically.

Sleeves: dial 44 (54) n. And tie for the strap 2 cm with an elastic band, adding evenly in the last wear. R. 26 p. = 70 (80) p. Then knit with an openwork pattern, while starting after chrome. from the 2nd p. of the scheme and finish the 9th of the p. scheme and chrome. 

Through 19 cm = 44 p. from the strap to knit to shape in 6 (7) bands of izn. p. 2 x 2 p. together ex. = 58 (66) p. Through 20 cm = 46 p. From the slat, add for bevels sleeves on both sides of 1 p. and alternately in each of the 6th and 8th p. 5 x (in each 6th p. 6 x) 1 p. = 70 (80) p., Including the added loops in the pattern. Through 37 cm = 86 p. from the strap to perform raglan bevels as on the back. Through 45 cm = 104 p. (47 cm = 108 p.) From the plank to postpone the remaining 48 (54) p.

Coquette: transfer to the circular needles one after another the deferred sections of the right shelf, sleeves, backs, sleeves, left shelf and tie up on all 235 (275) paragraph 1 of w. R. persons., at the same time, in order to avoid holes, knit crochets shortened p. from the previous or from the next paragraph together persons. and internal neighboring chrome. also knit together persons .; for size 46/48 additionally knit in the middle of the backrest 1 x 2 n. together persons. = 231 (270) p .; then knit a pattern of rhombuses. To give shape, reduce in the initial and final points a total of 3 p., In 16 (19) rapports, subtract a total of 7 p. As indicated = 113 (131) p. defer shortened p. for rounding the neckline of the shelves on both sides, 9 (10) n. and in each 2nd p. 2 x 4, 2 x 2 and 2 x 1 p. At the height of the coquette 15 cm = 40 p. start to knit on all loops with a rubber band and at the same time start and finish between the chrome. 1 out. and in the 1st p. knit shortened nakida p. with the following or with the previous item together izn. and at the same time evenly lower over the average 67 (83) p. 6 (12) p. = 107 (119) p. At the height of the strap 2 cm all loops should be closed according to the figure.

Assembly: seam; on the edges of the shelves and the short sides of the slats, dial on the circular knitting needles of 80 (86) sec. and knit with a rubber band. At the height of 1 cm strip, make 2 holes for buttons on the plate of the right shelf. To do this, close 3 p. And in the next p. dial them again. Make the bottom hole at the beginning of the coquette, make the top hole 8 cm above. At the height of the slats 2 cm all the loops close according to the picture. Sew buttons.





Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments