Click For Crochet Abbreviations List
Wide jumper with bat sleeves. In order to distribute the pattern equally to the sleeves, the model knits from the middle in both directions.
DIMENSIONS
36/40 (42/46)
YOU WILL NEED
Yarn (100% cotton; 100 m / 50 g) - 800 (900) g cream; hook number 6.
ST. B / N
Each row start with 1 v. P. instead of 1 st. b / n and finish 1 connection Art. in ce lifting.
"EASY STEP"
Art. b / n to carry out in the direction from left to right.
PATTERN ON 17 PRIMARY HINGES
Knit acc. outline and rotate rows as indicated. Start with loops before rapport, repeat regularly, repeat loops after rapport. Run the 1–6th row 1 time, the 3–6th row should be constantly repeated.
Openwork bat sweater
KNITTING DENSITY
14.5 p. X 7 p. = 10 x 10 cm
ATTENTION!
Since the number of loops in the pattern varies, we recommend making a paper pattern for all the parts in the original size and performing subtractions and additions in accordance with our data according to. pattern To do this, the workpiece is constantly applied to the pattern.
Pattern
COMPLETING OF THE WORK
RIGHT SHELF AND RIGHT PART OF THE BACK WITH SLEEVE
Run a chain of 86 vp + 1 incl. lifting and knitting according to the scheme.
After 14 (16) cm from the initial row, the work is to be postponed and the 2nd part is connected in the same way.
Now knit on all the loops, while in the 1st row, when connecting the parts, make a pattern according to the pattern.
After 25 (30) cm from the initial row, subtract from both sides according to pattern 65 (60) p.
After 60 (65) cm from the initial row, finish the job.
LEFT SHELF AND LEFT PART OF THE BACK WITH SLEEVE
Knit in the mirror image, but perform the 1st row in the initial loops of the 1st part.
ASSEMBLY
Details moisten slightly, stretch according to the dimensions specified on the pattern and leave to dry completely. Run the seams of the sleeves.
The neckline and detail edges should be tied with 1 circular row of st. b / n and 1 roundabout "crawfish step".
At the end of all the seams slightly otparit