Click For Crochet Abbreviations List
Size: 38
You will need:
550 g of blue MONDIAL ALPACA yarn (55% alpaca, 45% merino wool, 50 m / 50 g), knitting needles No. 4, a needle for knitting.
Double elastic: with a contrast thread, dial half of the required loops.
1st reg.: Working thread knit * 1 persons., 1 nakid, repeat from *.
2nd reg .: * knit nakid persons., Remove 1 p. As out., Thread before work, repeat from *;
3rd and subsequent rows: * 1 persons., Remove 1 item as out, thread before work, repeat from *.
Then dissolve the contrast thread.
Facial smoothness: persons. R. - persons. n., izn. R. - ex. P.
Wrong surface: persons, p, - izn. n., izn. R. - persons. P.
Elastic 1/1: alternately 1 persons., 1 out.
Gum 2/2: 2 persons alternately., 2 out.
Small braid (width 2 p.):
1st p .: leave 1 p. needles at work, 1 person. and knit a loop with a second Knitting needles.
2nd p .: 2 out.
Repeat the 1st and 2nd p.
The main pattern:
1st p .; 4 persons., Knit 2 items together persons, 2 persons., 1 nakid, 1 person., 1 nakid, 2 persons., 1 broach (remove 1 point as persons, 1 person. And stretch it through the removed loop ), 4 persons.
2nd and all even rows: izn. P.
3rd p .: 3 persons., Tie 2 paragraphs together persons., 2 persons., 1 nakid, 3 persons., 1 nakid, 2 persons., 1 broach, 3 persons.
5th b.: 2 persons., Tie 2 paragraphs together persons., 2 persons ,, 1 nakid, 5 persons., 1 nakid, 2 persons., 1 broach, 2 persons.
7th b.: 1 persons., Tie 2 paragraphs together persons., 2 persons., 1 nakid, 7 persons., 1 nakid, 2 persons., 1 broach, 1 persons.
9th p.: Knit 2 p. Together persons., 2 persons., 1 nakid, 9 persons., 1 nakid, 2 persons., 1 broach.
Repeat from the 1st to the 10th p.
Knitting density:
individuals. smooth: 22 n. and 22 p. = 10 x 10 cm
Back:
Dial 101 p. And tie 4 p. double rubber band and 10 p. elastic band 1/1.
Then distribute the loop as follows: 5 p. smoothing, 2 p. braids, 2 p. smoothing, 17 p. of the main pattern, 2 p. smoothing, 2 n. braids, 8 n. smoothing, 2 p. braids, 2 p. smooth, 22 p. persons. smoothing, 2 paragraphs. smoothing, 2 n. braids, 8 n. smoothing, 2 p. braids, 2 p. smoothing, 17 p. of the main pattern, 2 p. smoothing, 2 p. braids, 5 p. smooth
For fitting in every 10th p. in each lane of 5 p. smooth down 4 x 1 p. and in each lane of 8 p. smooth surface 4 x 2 p. = 83 p.
Then from both sides in each 10th r. add 3 x 1 p. = 89 p.
After 50 cm from the armhole set on both sides, close 1 x 4 p., Then in each 2nd p. W x 2 p.
After 53 cm from the elastic on the loops of the braids, knit the main pattern according to the pattern, the rest of the loops are the faces. satin stitch.
After 70 cm from a set of remaining loops to postpone.
Left shelf:
Dial 47 p. And tie 4 p. double rubber band and 10 p. elastic band 1/1.
Then distribute the loop as follows: 5 p. smoothing, 2 p. braids, 2 p. smoothing, 17 p. of the main pattern, 2 p. smoothing, 2 p. braids, 18 p. smoothing, 2 p. braids, 2 p. smoothing, 6 p. smooth
To be fitted on the right side in each 10th p. in the strip of 5 p. smooth down to reduce 3 x 1 p. and in the strip of 8 p. ex. smooth surface 3 x 2 p.
Then from the right edge in every 10th p. add 3 x 1 p.
After 15 cm from the elastic on the loops of the braids, knit the main pattern according to the pattern, the rest of the loops are the faces. satin stitch.
After 32 cm from the kit for neckline from the left edge before the last 3 n. In each 10th p. subtract 6 x 1 p. and in each 6th p. 5 x 1 p.
After 50 cm from the armhole set from the right edge, close 1 x 4 p., Then in each 2nd p. 3 x 1 p.
After 70 cm from a set of remaining loops to postpone.
Right shelf: knit symmetrically.
Sleeves:
Dial 47 p. And tie 4 p. double rubber band and 20 p. elastic band 1/1.
Then knit the faces. at the same time, for bevels of sleeves on both sides in each 10th p. add 9 x 1 p.
After 50 cm from the dummy set on both sides, close 1 x 4 p., Then in each 2nd p. 11 x 1 p. And in each row 8 x 1 p.
After 64 cm from the set, close the remaining 21 p.
Assembly:
Run shoulder seams.
For the collar and central slats on the neckline of the backrest lift 36 p. And knit elastic band 2/2; after the 2nd p. include work in every 2nd p. on both sides of the neckline loop and the loop of both shelves: 12 x 6 p., 1 x 8 p. and 1 x 80 p. = 356 p.
Tie 18 cm with an elastic band 2/2, knitting the extreme 3 on both sides with a double elastic band, then knit 4 r on all the loops. Double elastic and all loops close knit stitch.
Sew the sleeves, complete the seams of the sleeves and side seams.