Click For Crochet Abbreviations List
and again for babies
(425x324, 28Kb)
komplektik for karapuzik :)
Now I knit a future tribe (I will not appear there yet, but I knit a pink yarn)
Dimensions: 68/74 (80/86)
You will need: 300 (400) g of Super Baby pink yarn (70% in lycryl, 30% wool, 107 m / 25 g); straight spokes number 2 and number 2.5; short circular knitting needles No. 2.5; 6 buttons; 13 satin bows.
Facial smoothness: faces. R. - persons. etc., of. R. - rel. etc. In the circular p. knit people.
Grooming: persons. and out. R. - persons. etc. In the circular p. knit alternately on 1 circular river. persons. and out.
Rubber, knitting needles No. 2: alternately 1 persons., 1 str.
Knit all other knitting patterns on knitting needles No. 2.5.
Openwork pattern with a width of 8 p: knit according to scheme 1, which lists only persons. p., in the no. R. knit loops according to the figure, knits to knit out. Repeat rapport.
Openwork motif with a width of 27 p: knit in accordance with scheme 2, which lists only persons. p., in the no. R. knit loops according to the figure, knits to knit out.
Hole for the button: in the face. R. close 2 items and in. R. them again to dial.
Knitting density: 30 p. And 40 p. = 10 x 10cm.
BLOUSE
Back: Dial 90 (98) n., Tie between the chrome. for the strap 16 p. openwork pattern and then knit persons. smooth. After 16 (20) cm from the tying edge, close the armhole on both sides in each 2nd p. 1 x 4.1 x 3 and 1 x 2 n. At the height of the armhole 11 (13) cm, close the mid-20 (26) n. For the neck cutout and finish the two sides separately, while in the 2nd r. close at the edge of the cutout 1 x 5 p. At the height of the armhole 12 (14) cm, close the remaining 21 (22) stems of the shoulder on each side.
Right shelf: dial 46 (50) n., Tie between the chrome. for the strap 16 p. openwork pattern and then knit persons. smooth. After 8 (10) cm from the bar begin to perform on the 5th-31st st. Tracery motif. Run on the left side armhole, both on the back and at the same height. After 24 (30) cm from the set edge, close the cutout of the neck on the right side in each 2nd p. 1 x 5; 1 x 4,
1 (2) x 3 and 2 x 2 n. After 28 (34) cm from the edge of the typesetting directly close the remaining 21 (22) p. Shoulder.
Left shelf: knit symmetrically.
Sleeves: type 42 (50) n., Tie between the chrome. for the strap 16 p. openwork pattern, evenly adding 13 (11) items in the last row and then knitting people. smooth. For the bevels of the sleeves, add on both sides in each 4th r. 10 (14) x 1 pt, including the added loops in the pattern. After 9 (11) cm
from the strip to perform at an average of 9 points from the 1 st to the 12 th р. tracery motif. After 12 (14) cm from the strip, close the sleeves on both sides in each 2-rd river for the pellet. 1 x 6, 1 x 5, 1 x 4, 1 x 3, 1 x 4 and 1 x 6 n. After 15 (17) cm from the strip, close the remaining loops.
Assembly: perform seams, stitch the sleeves; on the neckline, dial 70 (78), etc., to link the 11th to the 14th river. openwork pattern, 6 r. rubber bands and loops close. At the edges of the shelves, dial 93 (113) n. And tie a 2 cm elastic band, then through 1 cm evenly on the right lath 6 holes for buttons and hinges closed. Sew on the left bar of the button. Sew the bows.
SLIDES
Right front / left rear leg: dial 34 (42) n. And tie between the chrome. for the strap
16 p. openwork pattern, evenly adding in the last row of 8 n. Then knit people. smooth. For side bevels, add on both sides in each 4th r. 3 x 1 n. After 3 cm from the strip, subtract for stepping rounding from the right side in each 2-rd river. 1 x 2 and 1 x 1 n. Postpone the remaining 45 (53) n.
Right rear / left front leg: knit symmetrically.
Before: translate the hinge of the right and left front leg = 90 (106) n. And knit the faces. smooth. After 10 (16) cm from the beginning of the step rounding, reduce for side bevels on both sides in each 3rd r. 10 x 1 n. After 19 (25) cm from the beginning of the step rounding, close the armhole on both sides in each 2-rd river. 1 x 3, 1 x 2 and 4 (5) x 1 n. At the same time, at the height of the armhole 4 cm, close the middle 14 (28) points for rounding the coquette, and close the inner edge in each 2-rd river.
1 x 4, 1 x 3, 3 x 2 and 5 x 1 p. At the height of the armhole of 8 cm all the hinges should be closed.
Back: knit the same way.
Coquette: dial 182 (196) n. And enclose them in a circle. Pryazat 'roundabout rivers. openwork pattern from the
11th to the 16th river, then 4 circular rivers. persons. smooth, from the 1st to the 12th circular river. openwork motif, at the same time knit alternately 5 stitches of persons. smooth and 9 n. tracery motif, 4 circular rivers. persons. smooth, from the
11th to the 16th river. openwork pattern and 2 circular rivers. garter stitching. For rounding, tie together in the 8th circular river. every 4 th and 5 th p., in the 13th circular river. between openwork patterns 1 x 2 p., in the 20-m circular p. every 3rd and 4th sts and in the 24th circular p. every 4 th and 5 th p. After 2 circular rivers. garter stitch hinge close.
Assembly: perform seams; at the edges of the armhole, dial 50 (64) n. Link from the 11th to the 16th river. openwork pattern and 2 p. garter stitch, hinge close. Sew a coquette to the front and back, as in the photo. Sew the bows.