Bertie

Knitted dress knee-length gray-blue

Click For Crochet Abbreviations List

Openwork pattern adds originality to the dress. The waist can be emphasized with a strap. Sizes: S, M, L. 

You will need: 

650 (700) 750 g gray-blue Anais yarn (merino wool, alpaca, acrylic, 40 m / 50 g); 
Knitting needles number 10; 
circular needles number 10.
Gum: alternately 2 out., 2 persons., Beginning a row from 1 out. Openwork patterns 1 and 2: knit according to the scheme, which shows only persons. rows. In izn. rows of a loop to knit on pattern, nakida - izn. Repeat from the 1st to the 12th p. Chrome Knit on the pattern and when assembling the seams to perform only half chrome. Selected reductions at the beginning of the row: 1 crom., 1 out, 1 person., 1 p. Tie together with a broach (1 p. remove as persons. 1 person. and stretch it through the removed p.): at the end of the row : 2 p. Knit together persons., 1 person., 1 out., 1 chrome. 

With an insufficient number of loops for double broaching in pattern 1, knit 2 p. Together with a person from the right edge., Perform 1 simple broaching from the left edge.

Knitting density Gum: 9 p. And 13 p. = 10 x 10 cm; openwork patterns: 8.5 p. and 13 p. = 10x10 cm. Back: dial 42 (46) 50 p., Tie 6 cm with an elastic band, in the last p. uniformly add 1 (3) 1 p. = 43 (49) 51 p. Then knit with an openwork pattern 1, starting after chrome. from the arrow A (B) A, repeat the loop of rapport, finish before the chrome. the arrow a (b) a. Through 52 cm from the typesetting edge (after the 6th or 12th row) knit with an elastic band, in the 1st p. evenly subtract 1 (3) 1 p. = 42 (46) 50 p. 58 cm from the dial, knit with an openwork pattern 2, after chrome. starting with loops before rapport, repeating rapport loops and ending with loops after rapport, chrome. 12 p. knit a rubber band. After 73 (72) 71 cm from the typesetting edge, close on both sides for armholes in each 2nd p. 4 x 1 (5x1) 6 x 1 p., Performing the selected decrements = 34 (36) 38 p.

Before: knit like a back, but with a deeper neckline. To do this, after 12 (13) 13 cm from the beginning of the armholes, close the average 6 (6) 8 points and on both sides of them in each 2nd p. - 1 more x2iZh1 p. Assembly: run the seams. On circular needles dial 22/22/24 p. On the neckline of the back of the neck and 30 (30) 32 p. = 52 (52) 56 p. Of the front neckline, tie a circle, close it in rows of 4 cm rubber band and close all loops.








Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments