Click For Crochet Abbreviations List
DIMENSIONS 36/38 (40 / 42-44 / 46-48 / 50)
YOU NEED yarn (65% cotton and 35% silk; 270 m / z 50) - 300 (350-400-450) g of a beige-gray; needles number 3.
PERSONAL SMOOTH
Facial rows - facial loops, purl rows - purl loops.
In the circular rows of all loops knit facial.
PEARL PATTERN
Alternately 1 face, 1 purl, pattern shift in each row by 1 loop.
Openwork ROMB
Knit by schemes A – D.
Scheme A: in width on the given 11 p. Knit 1 time; 1 times high from the 1st to the 10th row.
Schemes B and C: start with a width of 10 c. Before the 1st arrow, repeat a rapport of 10 points between the arrows according to the instructions, finish at 11 point after the 2nd arrow; 3 times in height from the 1st to the 20th row, as described in the instructions.
Scheme D: in width on the given 11 p. Knit 1 time; 1 times high from the 1st to the 12th row.
Cardigan with an openwork diamond
Diamond pattern (FOR SLEEVES)
Knit according to schemes E – H. Here again, scheme C is used, with the distribution of loops in width and rows in height - see the instructions.
Scheme E: in width on the loops knit 1 time; 1 times high from the 1st to the 10th row.
Scheme F: start wide with loops / loops before the 1st arrow, repeat the rapport of 10 points between the arrows according to the instructions, end with the loops after the 2nd arrow; 1 times in height from the 1st to the 22nd, then 1 time from the 3rd to the 10th.
Schemes G1 and G2: in width on the above loops knit 1 time, at the same time in the 1st p. additionally dial loops according to the instructions; 3 times high from the 1st to the 10th p.
Scheme H: in width at the given 21 p. Knit 1 time; 1 times high from the 1st to the 20th row.
Jumper with an openwork rhombus.
EDGING LOOPS:
First and last loops of each row knit in a pattern - with the front satin stitch or pearl pattern.
DECORATIVE FIXTURES A
From the right edge = chrome., 1 person, 2 points. Fasten the face together.
From the left edge = 2 n. Knit together the front one with an inclination to the left (= 1 n. Remove, as with the front knitting, knit the next loop face and the removed loop through the knitted one), 1 person, chrome.
DECORATIVE FIXTURES In
From the right edge = in persons. rows - 3 p. pearl pattern, 2 p. knit together the front; in out. rows - 2 p. knit together purl, 3 p. pearl pattern.
From the left edge = in persons. rows - 2 p. knit together the front with a slope to the left, 3 p. pearl pattern; in out. rows - 3 p. pearl pattern, 2 p. knit together izn. crossed.
ADDITIVES
From the right edge = chrome., From broach knit 1 person., 1 person. crossed.
From the left edge = of the broach, knit 1 person. crossed, 1 person., Krom.
KNITTING DENSITY
27 p. X 36 p. = 10 x 10 cm, connected by the front surface.
PERFORMANCE OF THE
BACKPACK
Dial 143 (153–165–177) section and for the bottom bar, starting with the inside. row, knit 1 cm = 4 p. pearl pattern.
Then, starting with izn. row, work to continue the facial smooth.
For bevels in the 30th p. from the lower plank, on both sides, first, 1 time in 1 decorative trim A, then in each 28th river. another 4 times 1 decorative trim A = 133 (143–155–167) p.
Through 52 (51–49–47.5) cm = 187 (183–177–171) p. from the lower bar close on both sides for the armholes 1 time in 6 (7–9–11) paragraphs, then in each 2nd p. 2 (3–2–3) times for 3 p., 2 (1–3–2) times for 2 p. And 2 times for 1 p. = 97 (103–109–115) p.
Through 18.5 (19.5–21.5–23) cm = 67 (71–77–83) p. From the beginning of the armhole on average 57 p. Knit for bei with pearl pattern.
Through 19.5 (20.5–22.5–24) cm = 70 (74–80–86) p. from the beginning of the armhole to close all loops in a straight line.
BEFORE
Knit, like a back, but with an openwork lozenge and a V-neck.
To distribute the loops of the patterns already in the 1st p. from the bottom plate, after 66 (71–77–83) points, attach the 1st marker and, after the next 11 points, attach the 2nd marker.
Through 11.5 cm = 41 p. From the lower plank, start an openwork rhombus: on middle 11 points between the markers, knit according to the A = 1 scheme, run from the 1st to the 10th p., on the remaining loops on both sides, continue to knit with the front satin stitch.
After the 10th p. Or 14 cm = 51 p. From the bottom bar, move both markers by 10 points to the side edges. Then, on the middle 31 points between the markers, continue knitting according to the B = pattern in width 1 time to perform a rapport of 10 points between the arrows, in height 1 time to perform from the 1st to the 20th river.
After that, move the two markers another 10 points to the lateral edges = 51 points between the markers. On these 51 p. Knit 1 more times from the 1st to the 20th p. according to scheme B, repeat 3 times rapport between 10 arrows wide between the arrows.
Then both markers once again move to 10 points to the lateral edges and 71 points between the markers once more to perform from the 1st to the 20th p. According to scheme B, repeat 5 times rapport between the arrows in width 5 times.
After that, on the middle 71 points between the markers, knit according to the scheme C, at the same time repeat the rapport from 10 points between the arrows 5 times in width, from 1 to 20 times in height 1 time.
Then move both markers by 10 points towards the middle and by 51 points between markers one more time from the 1st 20th p. According to scheme C, repeat 3 times rapport between the arrows in the width of 3 times.
After that, move both markers by 10 points towards the middle and on middle 31 points between markers, perform 1 time from the 1st to the 20th p. according to scheme C, with a width rapport of 10 p. knit 1 time.
Both markers once again shift by 10 points towards the middle and continue between the markers by 11 points between the markers according to the scheme D = perform 1 time from the 1st to the 12th p.
Further, on all hinges, continue the work on the face. In the 2nd p. (= izn. row) from the openwork rhombus for the beginning of the V-notch slats (= 3 p. of pearl pattern on each side of the bevel) to knit the middle loop with the front loop.
In the next row (= persons. Row) in the middle 3 p. Knit 1 out., 1 person. and 1 out.
In the next row (at a height of 51.5 cm = 186 p. From the bottom bar) on the middle 5 p. Knit: 1 person., 1 w., Middle loop for a V-shaped notch close, 1 w., 1 person.
First finish the right side, while continuing to knit with a pearl pattern on the left edge for the 3 point cutout from the left edge.
For the formation of a bevel from the left edge in the next 3rd p. (= persons. row) first make 1 decorative subtraction B, then in each 2nd p. 10 times 1 decorative trim In and in each 3rd p. another 14 times 1 decorative trim B.
Through 20 cm = 71 p. from the beginning of the separate knitting, close the remaining 23 (26–29–32) p. of the shoulder in the same row.
The second side finish symmetrically.
SLEEVES
For the 1st band of the openwork pattern, dial 2 points and knit the 1st river. (= izn. row) purl.
Next, knit with an openwork pattern according to the E = 1 scheme run from the 1st to the 10th p. = 11 p.
To continue the work according to the scheme F = 1 times wide, repeat rapport from 10 points between the arrows, knit 1 time from 1st to 22nd pt., Then repeat once from 3rd to 10th p. , while the width rapport of 10 n. between the arrows to perform 3 times.
Through 11.5 cm = 41 p. from the dial-up row on the needles of 41 p. Continue work on 21 p. of the right side, temporarily leaving the remaining 20 p.
Knit under the scheme G1, while in the 1st p. additionally dial 1 p. from the left edge.
Knit 3 (3–4–4) times from 1st to 10th p., with the openwork pattern going upward with the right slope upwards, and the area of the front surface on the left expands = 6 p. with each repetition from the 1st to the 10th row.
Through 8.5 (8.5–11–11) cm = 30 (30–40–40) p. from the beginning of separate knitting with needles 40 (40–46–46) p., trim the thread and leave the loop temporarily. On the previously left 20 p. Continue to knit the left side of the scheme G2, for this at the beginning of the 1st p. instead of the first 2
sections of the scheme, retype 2 sections again . Repeat 3 (3–4–4) times from the 1st to the 10th p., while the openwork pattern is tilted to the left upwards, and the area of the front surface on the right expands = 6 with each repetition.
Through 8.5 (8.5–11–11) cm = 30 (30–40–40) p. from the start of separate knitting with needles 40 (40–46–46) p.
Now connect the left and right sides of the sleeve. To do this, in the next row, first knit the first 19 (19–25–25) left side, attach 1 marker, the next 20 paragraph, knit according to the scheme C (= 10 point to the 1st arrow + 10 point to 2- arrows), then knit 1 last coat and knit the last loop of the left side with the first 2 paragraphs of the right side together with the front one with an inclination to the left (= 1 point. knit), following 19 points. knit according to the scheme C (= start from the 3rd point after the 1st arrow, knit 8 point to the 2nd arrow + 11 point after the 2nd arrow), pr epit marker, the other 19 (19-25-25) n. provyazat facial.
Now there are only 79 (79–91–91) paragraphs on the spokes, 41 averages of them are located between the markers.
Next out knot a row in purses, then distribute the loops of the patterns as follows: on the loops to the 1st marker knit with the front satin stitch; height 1 time to perform from the 3rd to the 20th p.), on the other loops from the 2nd marker to knit the front satin stitch.
After 20 p. From the first through row, both markers by 10 points should be moved towards the middle and continue to knit by 21 points between the markers according to the H pattern (in height, perform 1 time from the 1st to the 20th p.).
Then on all the loops knit facial surface.
Simultaneously in the 3rd p. from the first through row, add 1 times for both bevels on 1 side, then in each 12 (8–8–6th) p. another 9 (12–12–14) times for 1 item = 99 (105–117–121) item
Through 31.5 (30–28.5–26.5) cm = 114 (108–102–96) p. from the first through row close on both sides for okat 1 times in 5 points, then in each 2nd p. 1 times 3 points, 4 times 2 points, 9 (10–10–11) times 1 point, and 6 (6–7–7) times 2 points.
Through 11.5 (12–12, 5–13.5) cm = 42 (44–46–48) p. from the beginning of the formation of the okat, close the remaining 25 (29–37–39) loops in the same row.
ASSEMBLY
Run shoulder and side seams. Run the seams of the sleeves and sew the sleeves.