Bertie

Cardigan Crochet Free Pattern

Click For Crochet Abbreviations List

Sizes: Small, Medium, Large, X-Large and XX-Large. The photo shows the size of Small. 

Finished dimensions: 

Chest circumference (buttoned): 98 (105.5, 111.5, 119, 127) cm. 

Length: 73 (74, 75.5, 78, 79.5) cm 

Sleeve width in the upper part: 35.5 (38, 40.5, 44.5, 47) cm. 

You will need: 

9 (10, 11, 12, 13) skeins of Classic Elite Yarns Soft Linen yarn (wool / linen / alpaca, 125 m / 50 g), colors of the tropical sea 

4 mm needles or other size to achieve the required knitting density; 

circular needles 4 mm long 90 cm; 

knitting markers. 

The density of knitting: 

pattern according to the scheme 1: 18 p. And 32 p. = 10 x 10 cm; 

pattern according to the scheme 3: 17 p. and 28 p. = 10 x 10 cm

Carefully measure knitting density. 

Note: The 

bottom edge of the openwork trim is picked up and knitted down from the finished back and front details. 

This edge is not included in the scheme. 

Back: 

Dial 83 (89, 95, 101, 107) p. 

Beginning of the scheme 1: 

1st p. (izn.): 2 izn. n. (chrome. loop), place the marker, izn. n. to the last 2 n., place the marker, 2 out. p. (chrome p.). 

2nd p. (persons): 2 persons. p. (Krom.), knit the first loop of the 2nd row of the scheme, 12 (13, 14, 15, 16) times rapport of 6 p., last 6 p. of the scheme, 2 persons. p. (chrome p.). 

Continue according to scheme 1 in such a sequence until 48 p. (= 6 rapports high). 

Knit 7 p. facial. 

Scheme 2 start:

Starting from the 2nd row of scheme 2 next. way: 

2nd p. schemes (persons. p.): 2 persons. p. (Krom.), tie the first 3 paragraphs of the 2nd row of the scheme, 12 (13, 14, 15, 16) times rapport of 6 p., last 4 p. of the scheme, 2 persons. p. (chrome p.) 

Continue under scheme 2 in the same distribution until 50 p. (= 5 rapports high). 

Knit 7 p. persons., while adding 1 p. in the middle of the last izn. R. = 84 (90, 96, 102, 108) p. 

Beginning of the diagram 3: 

Start from the 2nd row of the diagram 3 next. way: 

2nd p. schemes (persons): 2 persons. p., knit the first p. of the 2nd row of the scheme 3, 13 (14, 15, 16, 17) times rapport from 6 p., knit the last p. of the scheme, 2 persons. p. 

Continue straight on with patterns, as established, until 18 rows of Diagram 3 are connected.

Detail length approximately 43 cm from the beginning. 

Sleeve sleeves: 

Note: 

When forming the armhole, tying the pattern according to scheme 3, replace the installed 2 face chrome. p. on the loops of individuals. smooth and when there are not enough loops for the pattern, knit the pattern in the hole. 

At the beginning of the trail. 2 rows close 5 p. 

Row. with caveats (persons): 2 p. together persons. broach (= remove 1 p. as persons., 1 person. and stretch it through the removed p.), knit a pattern to the last 2 p., 2 p. together of persons. 

Repeat row with cuts in every 2nd p. 5 more (7, 9, 11, 13) times = 62 (64, 66, 68, 70) p. 

Knit straight until armhole height reaches 19 (20.5, 21.5, 24, 25.5) cm. 

In the last wear. R. put the marker, noting the average 12 (12, 12, 14, 14) n. 

Neck and shoulders cut:

Track. row (persons): close 5 (6, 5, 5, 6) sec., knit up to the marked middle loops, attach the thread from the 2nd skein and close the middle 12 (12, 12, 14, 14) sec, knit to the end of the row. 

Continue the shoulder bevel, closing 5 (6, 5, 5, 6) n. At the beginning of the trace. from p., then close 5 (5, 6, 6, 6) paragraphs from each edge of the shoulder 2 more times, simultaneously close 2 times 5 points from each edge of the neck. 

Left shelf: 

Dial 41 (47, 47, 53, 53) p. 

Beginning of the scheme 1: 

1st p. (izn.): 2 izn. n. (chrome. loop), place the marker, izn. loops to the last 2 p., place the marker, 2 out. n. (chrome. loop). 

2nd p. (persons): 2 persons. p. (Krom.), knit the first loop of the 2nd row of the scheme, 5 (6, 6, 7, 7) times repeat of 6 p., last 6 p. of the scheme, 2 persons. p. (chrome p.)

Continue according to scheme 1 in such a sequence until 48 p. (= 6 rapports high). 

Knit 7 p. facial. 

Start of scheme 2: 

Start from the 2nd row of scheme 2 next. way: 

2nd p. schemes (persons): 2 persons. p. (Krom.), tie the first 3 p. of the 2nd row of the scheme, 5 (6, 6, 7, 7) times rapport of 6 p., the last 4 p. of the scheme, 2 persons. p. (chrome p.) 

Continue under scheme 2 in the same distribution until 50 p. (= 5 rapports high). 

Knit 7 p. persons., while adding 1 p. in the middle of the last izn. R. = 42 (48.48, 54, 54) p. 

Beginning of the diagram 3: 

Start from the 2nd row of the diagram 3 next. in the following way:

2nd p. schemes (persons): 2 persons. p., knit the first p. of the 2nd row of the scheme 3, 6 (7, 7, 8, 8) times rapport from 6 p., knit the last p. of the scheme, 2 persons. n. 

Knit straight on scheme 3, until the magnitude of the details is 38 cm from the beginning. 

Neckline: 

Series. with reductions (persons): tie a pattern to the last 2 p., 2 p. together of persons. 

Place a marker, marking the beginning of the neckline in this row. 

Repeat row with cuts in every 4th p. 15 more (16, 15, 14, 14) times, then in every 2nd p. 0 (2, 0, 5, 2) times, at the same time, when the length of the part will be the same as on the back to the armhole, continue the trace. way: 

Cap sleeves: 

Trail. R. (persons): close 5 p. and knit until the end of the river.

To continue the formation of the neck, at the same time to reduce 1 p. From the edge of the armhole, performing a broach 6 (8, 10, 12, 14) times at the beginning of each face. R. 

After all formations, knit directly on the remaining 15 (16, 17, 17, 18) n., Until the armhole reaches 19 (20.5, 21.5, 24, 25.5), see 

Shoulders: 

From the edge of the armhole close 1 time 5 (6 , 5, 5, 6) p., Then 2 times 5 (5, 6, 6, 6) p. 

Right shelf: 

Complete all formations symmetrically to the left shelf. 

Sleeves: 

Dial 35 (41, 41, 47, 47) p. 

Beginning of the scheme 2: 

1st p. (izn.): 2 izn. n. (chrome. loop), place the marker, izn. loops to the last 2 p., place the marker, 2 out. n. (chrome. loop).

2nd p. schemes (persons): 2 persons. p., knit the first 3 p. of the 2nd row of the scheme 2, 4 (5, 5, 6, 6) times rapport from 6 p., tie the last 4 p. of the scheme 2, 2 persons. p. 

Continue in this distribution until 40 p. (4 rapport in height). 

Knit 7 p. facial. 

Track. a number of (persons.): persons. p., while uniformly adding 7 p. = 42 (48, 48, 54, 54) p. 

Beginning of the scheme 3: 

1st p. schemes (ex.): 2 ex. n. (chrome. loop), place the marker, izn. loops to the last 2 p., place the marker, 2 out. n. (chrome. loop). 

2nd p. schemes (persons): 2 persons. p., knit the first p. of the 2nd row of the scheme 3, 6 (7, 7, 8, 8) times rapport from 6 p., knit the last p. of the scheme, 2 persons. p. To 

knit directly according to the scheme 3 more rows.

Row with increments (persons.): 2 persons. p., move the marker, from the transverse thread add 1 p., knit to the next. marker, from the transverse thread add 1 p., move the marker, 2 faces. n. 

Repeat row with increments in each 8th p. 6 more (6, 0, 0, 0) times, then 3 (2, 10, 10, 12) times in each 6th p. = 62 (66, 70, 76, 80) p. 

Knit straight until the part size is 42 (42, 42, 42.5, 42.5) cm from the beginning. 

Roll back: 

Note: 

When shaping the okat, knitting the pattern according to scheme 3, replace the installed 2 face chrome. p. on the loops of individuals. smooth and when there are not enough loops for the pattern, knit the pattern in the hole. 

At the beginning of the trail. 2 rows close 5 p.

Row. with caveats (persons): 2 p. together persons. broach (= remove 1 p. as persons., 1 person. and stretch it through the removed p.), knit a pattern to the last 2 p., 2 p. together of persons. 

Repeat row with cuts in every 2nd p. 15 more (17, 19, 22, 24) times = 20 p. 

Loops to close. 

Finishing cuff sleeves: 

With faces. side along the typesetting edge of the sleeve to raise 35 (41, 41, 47, 47) n. facial. 

Knit 3 p. facial. 

Row with a pattern in the hole (persons): 1 persons. p., * nakid, 2 p. together persons., 1 persons. P.; repeat from *, finish 1 persons. p. 

Knit 1 p. purl. 

Knit 4 p. facial. 

Hinges close. 

Assembly: 

Perform wet-heat treatment of external. side to the required size. 

Run shoulder seams.

Stitch sleeves, while sitting on the back if necessary. 

Run the seams of the sleeves. 

Run side seams. 

Bottom trim: 

With faces. The sides of the circular needles along the lower edge of the left shelf, the back and the right shelf evenly lift 158 ​​(176, 182, 200, 206) with front faces (approximately 1 item for each loop along the dial edge). 

From 1st to 3rd p.: Persons. p. 

4th p. pattern in the hole (persons. p.): 1 persons. p., * nakid, 2 p. together persons., 1 persons. P.; repeat from *, finish 1 persons. n. 

5th b .: izn. p. To 

knit 4 p. facial. 

Repeat the 4th and 5th rows. 

Knit 8 p. facial. 

Then 2 times (repeat 4th and 5th p., Knit 4 p. Facial). 

The hinges are tight to close. 

Finishing the front edge of the shelves:

With faces. hand on the circular needles to raise 95 p. to the throat marker, place the marker, raise 50 (52, 55, 59, 62) shoulder length, 42 (41, 41, 45, 45) along the back notch, 50 (52, 55, 59, 62) shoulder weight marker, place the marker, 95 p. to the end = 332 (335, 341, 353, 359) p. 

Knit as well as the bottom edge, only all persons. R. knit garter stitch (with the exception of rows with a pattern in the hole), from the cross-thread add 1 p. after the first marker of the neck and 1 p. before the 2nd marker of the neck and the added loops to include in the pattern with holes. 

The hinges are tight to close.











Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments