Annie

Crochet Summer Blouse Free Pattern

Click For Crochet Abbreviations List

A cropped jumper with 3/4 sleeves is suitable for autumn and spring walks, as well as an office option 
you will need: 
Extra Soft Merino Cotton yarn (70% wool, 30% cotton; 50 g / 130 m): 250 (300; 350 ; 400; 450) g ​​№ 05642 purple and 50 g № 05645 pink. 
Spokes number 3.25-3.5 and 3.5-4. 
Circular needles No. 3.25-3.5 with a 40 cm long cable. 
Size XS (S; M; L; XL). 
Patterns and types of loops: 
Pers. GL .. res. 1 × 1. 
Openwork pattern: according to the scheme. 
Knitting density: 10 x 10 cm = 22 p. X 30 p. individuals. Ch. needles number 3.5-4; 10 x 10 cm = 20 p. X 30 p. openwork knitting pattern number 3.5-4. 
A cropped jumper with 3/4 sleeves is suitable for autumn and spring walks, as well as an option for the office. knitting scheme and pattern 
Performance: Attention! 
When forming the armholes and neckline, it should be borne in mind that each nak. must match ub n. 
Fulfilling ub. For armholes, you should knit a whole rapport or half of it.
When elm. half rapport 3rd p. according to the scheme elm. trace, way: on the right side elm. 2 cm individuals. instead of [fn. 1 p. reception, 2 vm. Persons., Throw knitted item through the sn.]; on the left side elm. [PH. 1 p. admission, 1 person. n. and throw tied n through sn.] instead of [fn. 1 p. by reception, vm. individuals. and throw knitted item through a sn.]. 
Back: with pink thread on knitting needles No. 3.25-3.5, dial 88 (98; 108; 118; 128) paragraph and purple thread with 4 cm cut. 1 × 1, starting p. with 1 chrome. n. and 1 persons. n and completing 1 out. n. and 1 chrome. P.; completing the 1st p. to izn. side and the last r. - by persons. to the side. 
In footprint, (ex.) P.: All n. Elm. izn., before chrome. n. at the end of p. prib 1 p. (From broach to the back wall) = 89 (99; 109; 119; 129) p.
Then go to the spokes number 3.5-4 and elm., Distributing n. Trace, way: 1 chrome. p., 4 persons. n., 80 (90; 100; 110; 120) n. openwork pattern according to the scheme, repeat rapport of 10 p. 8 (9; 10; 11; 12) times, 3 persons. Clause, 1 chrome. n. 
elm in the specified sequence up to a height of 24 cm. 
Then, at the beginning of the next. 2 p. on both sides close for armholes in 5 (5; 7; 9; 10) p. 
Knit 2 p. no kill and close by 2 sts. 2 p. 
Then kill 1 p. on both sides in each 2nd p. 4 (4; 5; 6; 7) times the trace, as follows: 1 chrome. p., 2 persons. n. 1 p. admission, 1 person. n. and throw knitted item through sn „elm. to the last 4 p., 2 vm. persons., 1 persons. Clause, 1 chrome. p. = 67 (77; 81; 85; 91) p.
At a height of 40 (42; 44; 45; 46) cm cm for forming a neckline of elm. to the central 33 p., with a thread from another skein, close these p. and tie it to the end of the river. 
Next elm. each half separately, closing on the neckline 5 p. 1 time and 3 p. 1 time. 
At a height of 42 (44; 46; 47; 48) cm, on both sides close by 9 (14; 16; 18; 21) n. Shoulders. 
Before: elm., Like the back, but with a deeper neckline. 
For this, at a height of 34 (36; 37; 38; 38) cm, knit to the central 23 points, with a thread from another skein, close these points and tie up to the end of the river. 
Next elm. each half separately, closing the neckline 1 times 3 points, 2 times 2 points, and 6 times 1 point. 
At a height of 42 (44; 46; 47; 48) cm, close on both sides by 9 (14; 16; 18; 21) n. Shoulders.
Sleeves: with pink thread on knitting needles No. 3.25-3.5, dial 56 (60; 62; 64; 66) paragraph and purple thread with a 3 cm cut. 1 × 1. 
Then go to the spokes number 3.5-4 and continue the work of individuals. ch., app. on both sides, 1 p. in each 6th p. 10 (9; 7; 7; 2) times, then in each trace. 4th p. 0 (3; 7; 8; 16) times, = 76 (84; 90; 94; 102) p. 
At a height of 26 (27; 28; 30; 32) cm, at the beginning of the next. 2 p., On both sides close for okat by 5 (5; 7; 9; 10) p .; at the beginning of the trace. 4 p. - 2 p .; at the beginning of the trace. 30 (32; 36; 36; 36) p. - 1 p .; at the beginning of the trace. 4 p. - 2 p. And at the beginning of the trail. 2 p. - 3 p. 
Close the remaining 14 (20; 18; 18; 24) p.
Assembly: Run shoulder and side seams. Sew the sleeves in the armholes and seam the sleeves. On the neckline, raise the circular needles 124 p. And a purple thread knit 2 cm cut. 1 × 1. Then thread a pink color to tie another 1 p. res. 1 x 1 and close all p.








Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments