Click For Crochet Abbreviations List
200 g white (color 17), 150 g gray (color 2) and 100 g gray-green (color 2B) Linarte Lana Grossa yarn (40% viscose, 30% cotton, 20% linen, 10% polyamide, 125 m / 50 g);
needles number 6,
circular needles number 6,
hook number 4,5;
1 button.
Patterns:
Shawl: persons. and izn. R. -persons P.
Facial surface: persons. R. - persons. n., izn. R. - ex. n.
Mesh pattern: knit according to the scheme. Start with chrome., Repeat 2 p. Rapport, finish chrome. Repeat the 1st and 2nd p.
The pattern of seashells: knit straight and back rows according to the scheme along the edge of the product. Start with loops before rapport, repeat rapport between arrows, end with loops after rapport. From the 2nd p. groups of art. s / n knit in vozd. n previous p. Run 1 time 1st - 5th p., Repeat 2-5th p.
The density of knitting, mesh pattern: 19 p. And 22 p. = 10 x 10 cm: a pattern of seashells: 2 rapport and 13 p. = 8.5 x 10 cm.
Description of knitting a jacket:
Back:
Gray-green thread dial 100 p., Tie 2 cm = 8 p. garter stitch and perform strip as follows: 8 cm = 18 p. mesh pattern gray thread, 4 cm = 6 p. individuals. smooth gray thread, 2 p. white thread and 2 p. individuals. smooth gray thread. Hinges close. Crochet number 4.5 white thread knit 11 cm = 14 p. shell pattern = 11 rapports (1 rapport = 4 cm). Spokes number 6 white thread from the last p. dial 100 points and knit 4 cm = 10 p. garter stitch, then knit gray-green thread 10 cm = 22 p. mesh pattern and 4 cm = 6 p. individuals. smooth, gray thread 2 p. garter stitch and gray-green thread 2 p. individuals. smooth Hinges close. Crochet number 4.5 gray thread knit 6 cm = 8 p. pattern of seashells. Knit number 6 with a white thread to dial 100 points from the last p., Crocheted, tie 9 cm = 20 p. mesh pattern and loop close.
Left shelf:
Dial 50 pp with gray-green thread and follow the sequence of patterns, as on the back = 5 rapports of the pattern of shells, after crochet strips, dial 50 p. 4 cm = 8 p. from the last band of the neckline, close 8 p. on the left side and in each 2nd p. 1 x 3 p. And 3 x 2 p. Through 5 cm = 12 p. from the beginning of the neckline, close the remaining 33 p. of the shoulder.
Right shelf:
Knit symmetrically.
Sleeves:
Gray-green thread dial 48 p., For the strap tie 2 cm = 8 p. garter stitch and knit a white thread with a grid pattern, for bevels adding both sides in the 9th p. 1 p., In every 10th p. 2 x 1 p., In every 6th p. 3 x 1 p. And in every 4th p. 2 x 1 p. = 64 p. Knitted loops knit mesh pattern. After 28 cm = 62 p. from the strap hinges free to close.
Assembly:
Run the seams, and sew the side seams from the bottom edge by 42 cm. On the circular needles No. 6 dial 62 n along the neckline edge with a gray thread and knit a hood with a grid pattern. After 28 cm = 62 p. loop close. Fold the hood in half and make the top seam. Vertical edge of the right shelf to tie a gray thread 1 p. Of the “creeping step” (Art. B / n from left to right), then at the beginning of the hood, make a loop of fastener from 8 m. Claim and tie her 15 tbsp. b / n The edge of the hood and the vertical edge of the left shelf to tie 1 p. "Rachogo step." Sew sleeves, complete the seams of the sleeves. Sew a button.