Click For Crochet Abbreviations List
Size: 42/44.
You will need:
A total of 300 g of Spark yarn (40% wool, 40% acrylic, 20% methanite; 1316 m / 100 g) of which: 100 g of hyacinth, 100 g of cornflower blue; 100 g blue; Knitting needles number 3 and 4.5; 2 buttons.
Facial smoothness: persons. R. - persons. n., izn. R. - ex. p.
Gum: alternately 1 person. n., 1 out. n.
Openwork pattern:
knit according to a scheme in which only individuals are shown. R.
In izn. R. all loops and nakida knit purl.
The alternation of colors:
thread in 4 addition knit as follows: * 30 p. - 2 threads of cornflower blue, 2 threads of blue; 30 r. - 2 threads of blue color, 1 thread of cornflower blue color, 1 thread of color of a hyacinth; 30 r. - 2 threads of blue color, 2 threads of color of a hyacinth; 30 r. - 2 threads of blue color, 1 thread of color of a hyacinth, 1 thread of cornflower-blue color, to repeat from *.
Density of knitting: an
openwork pattern on the needles No. 4.5 with a thread in 4 additions: 18 s. X 24 p. = 10 x 10 cm.
Integral knitted right shelf, back and left shelf:
Yarns in 2 additions of cornflower blue color and in 2 additions of blue color on knitting needles No. 4.5 dial 154 paragraph and knit 4 p. individuals. stitch, 1 p. from p. (for hemming), 4 p. individuals. satin stitch.
Next, distribute the loop as follows: 8 p. Gum, 138 p. Openwork pattern, 8 p. Gum.
Link 178 river. Alternating colors.
In the 184th p. from the set go to the needles number 3 and knit 16 p. rubber band.
In the 188th p. from the set on the right side, make holes for the buttons as follows: 4 p. elastic, 2 p. together persons., 2 nakida, 2 p. together persons.
In 196 r. similarly, make a second buttonhole.
From the 200th p. go to the needles number 4.5 and knit openwork pattern.
For neckline in the 200-m p. from a set on both sides in each 2nd p. close 10 x 1 p. and in each 4th p. 4 x 1 p. As follows: at the beginning of the 8th and 9th p. Together of persons. and, respectively, at the end of the 9th and 8th paragraph together persons. = 126 p.
In the 225th p. from the recruitment work divided into 3 parts: 28 p. - right shelf, 70 p. - back, 28 p. - left shelf.
Back:
For armhole sleeves in the 225th p. from a set on both sides in each 2nd p. close 1 x 5 p., 1 x 2 p., 3 x 1 p. = 50 p.
For neckline in 251st p. from the set, close the average of 14 points and on both sides of them 1 x 5 points.
In the 255th p. from the set to close the remaining 13 p. shoulder.
Right shelf:
For armhole sleeves in the 225th p. from the set on the right side close 1 x 5 p., 1 x 2 p., 3 x 1 p. 1 = 18 p.
In the 255th p. from the set to close 13 p. shoulder, on the remaining 5 p. slats continue 34 p. rubber band.
In the 289th p. from the set to close the remaining 5 p. planks.
Left shelf: knit symmetrically right shelf.
Sleeves:
Yarns in 2 additions of cornflower-blue color and yarn in two additions of blue color on the needles No. 4.5, dial 35 points and knit 4 p. individuals. stitch, 1 p. from p. (for hemming), 4 p. individuals. smooth
Next, knit 123 p. openwork pattern.
To expand the sleeve on both sides in each 10-m p. add 7 x 1 p. = 49 p.
For the neckline in 129 m p. from the set on both sides close 1 x 5 p. and in each of the 2nd p. 1 x 3 p., 8 x 1 p., 1 x 3 p.
B 151st p. from the set to close the remaining 11 p.
Build:
Run shoulder seams
Run the seams of the sleeves. Sew sleeves.
Run the seam on the slats and sew to the neckline.
Hem the bottom of the product and the sleeve along the fold.
Sew buttons.